Central Avenue (Highway 65) Improvements
Waite Park| December 12, 2024
Central Avenue Improvements
mndot.gov
2
Overview
MnDOT and Metro Transit are collaborating with local agencies and the public to create a new road design for Central Avenue (Hwy 65) between the Mississippi River and I-694. As a part of this project, MnDOT will work closely with Metro Transit on the integration of the METRO F Line, a planned bus rapid transit line that will provide improved transit service on the Route 10 corridor.
Timeline
Central Avenue Improvements: F Line
3
METRO F Line: Arterial bus rapid transit project
Planning Study: Overview
mndot.gov
4
PRIMARY NEEDS | SECONDARY NEEDS | OTHER CONSIDERATIONS |
|
|
|
MnDOT Planning Study and F Line BRT Engagement
MnDOT Planning Study Engagement (2020-2023) Themes:
mndot.gov
5
F Line BRT Engagement (2019 to 2023) Themes:
Planning Study: Recommendations
The study recommended the following improvements to the corridor:
mndot.gov
6
Central Avenue Improvements: Goals
PROJECT GOALS
mndot.gov
7
Improve safety and accessibility for people walking, rolling, biking, riding transit, and driving
Support visions for complete streets, multimodal options, transportation equity, and climate action
Upgrade transit facilities to provide faster, more reliable, and more attractive transit service that is easier to use
Provide roadway, utility and public space infrastructure improvements
Central Avenue Improvements: Safety Focus
IMPROVING TRAFFIC SAFETY IS A PROJECT GOAL
As described in Minneapolis' Vision Zero initiative, Central Avenue is one of the city's High Injury Streets:
mndot.gov
8
Central Avenue Improvements
mndot.gov
9
The project is asking the public to provide feedback on:
Central Avenue Improvements: River to 18th
10
MISSISSIPPI RIVER TO 18TH AVENUE
EXISTING
80’ TO 83’
Central Avenue Improvements: 18th to 27th
11
18TH AVENUE TO 27TH AVENUE
EXISTING
100’
Central Avenue Improvements: 18th to 27th (continued)
12
18TH AVENUE TO 27TH AVENUE
EXISTING
100’
Central Avenue Improvements: 27th to 37th
13
27TH AVENUE TO 37TH AVENUE
EXISTING
100’
Project Schedule: Overall
mndot.gov
14
Preliminary Design Phase Engagement
Engagement during the preliminary design phase (2025-2026) is planned over 4 phases:
mndot.gov
15
Questions
mndot.gov
16
Thank You!
Christina Perfetti �MnDOT West Area Coordinator
Tracy Fosmo�Consultant Team Project Manager