ELECTRICAL INSTALLATION& ESTIMATING

1 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

LEARNING OBJECTIVE

BY

ABINASH PANI

ASSISTANT PROFESSOR

GANDHI INSTITUTE FOR EDUCATION AND TECHNOLOGY, BANIATANGI, BHUBANESWAR

2 of 18

SYLLABUS

2 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

3 of 18

3 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

4 of 18

4 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

5 of 18

5 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

COURSE CODE: - EET602 BRANCH: - ELECTRICAL ENGG.

SEMESTER: -6TH TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:

TOPIC: -INDIAN ELECTRICITY RULE (1.1 – 1.4) SUBJECT: -ELECTRICAL INSTALLATION&ESTIMATING

TIME: -55 minute

NAME OF TEACHER: - M.R A. S ray

CLASS: -6TH semester

STUDENT: -60 TOTAL PERIOD: -14

L.O: - AIM – the student will be able to understand Indian electricity rule. C.O: - Study the Indian electricity rule

TEACHING AID: - *Electrical installation&estimating, dhanpatrai son’s.

*website:-https://www.electrical4u.com

*PowerPoint

PRE-REQUSITES: - knowledge of Indian electricity rule was done.

TEACHING POINT & TEACHER ACTIVITY

1.1 Definition: ampere,apparatus,acessiable,bare,cablecircuit,c.b, conductor voltage,(low,medium,high,EH),live,dead,cut- out,conduit,system,danger,installation,earthing system, span,volt,switch gear etc :- good morning / good afternoon , how are you? today we shall know about Definition amper,apparatus,acessiable,bare,cable circuit,c.b,conductor,voltage(low,medium,high,EH

),live,dead,cutout,conduit,system,danger,install- .

STUDE

NT ACTIVI TY

good mornin g/good afterno on

TEA

CHE R AID

chal k, dust er PPT.

6 of 18

6 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

TEACHING POINT TEACHER ACTIVITY

-ation, earthing system, span, voltage, switch gear.

    • General safety precaution

rule29,30,31,32,33,34,35,36,37,38,39,40,41,43,44,

45,46.: - good morning / good afternoon, how are you? today we shall know about General safety precaution

rule29,30,31,32,33,34,35,36,37,38,39,40,41,43,44, 45,46.

    • General condition relating to supply and use of energy rule:47,48,49,50,51,52,53,54,55,56,57,58,59,60,61

,62,63,64,65,66,67,68,70: - good morning / good

afternoon, how are you? today we shall know about General condition relating to supply and use of energy rule:47,48,49,50,51,52,53,54,55,56,57,58,59,60,61

,62,63,64,65,66,67,68,70.

    • OH Lines Rule:74,75,76,77,78,79,80,86,87,88,89,90,91-

good morning / good afternoon, how are you? today we shall know about OH Lines Rule:74,75,76,77,78,79,80,86,87,88,89,90,91

STUD

ENT ACTIV ITY

-do-

-do-

-do-

TEAC

HER AID

-do-

-do-

-do-

7 of 18

7 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

COURSE CODE: - EET602 BRANCH: - ELECTRICAL ENGG.

SEMESTER: -6TH TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:

TOPIC: -ELECTRICAL INSTALLATIONS (2.1 – 2.3) SUBJECT: -ELECTRICAL INSTALLATION&ESTIMATING

TIME: -55 minute

NAME OF TEACHER: - M.R A. S ray

CLASS: -6TH semester

STUDENT: -60 TOTAL PERIOD: -14

L.O: - AIM – the student will be able to understand Electrical installation. C.O: - Study the Electrical installation.

TEACHING AID: - *Electrical installation&estimating, dhanpatrai son’s.

*website:-https://www.electrical4u.com

*PowerPoint

PRE-REQUSITES: - knowledge of Indian electrical installation was done.

TEACHING POINT & TEACHER ACTIVITY

2.1 Electrical installation, domestic, industrial wiring system, internal distribution of electrical energy, method of wiring, system of wiring, wire

&cable, conductor material used in cable, insulating material , mechanical protection .type of cable used in

internal wiring,multi standard d cables, voltage grinding of cable,gener5al

specification of cable etc. :- good morning / good afternoon , how are

STUDENT

ACTIVITY

good morning/good afternoon

TEACHER

AID

chalk, duster PPT.

8 of 18

8 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

TEACHING POINT & TEACHER ACTIVITY

you? today we shall know about Electrical installation, domestic, industrial wiring system, internal distribution of electrical energy, method of wiring, system of wiring, wire

&cable, conductor material used in cable, insulating material , mechanical

protection .type of cable used in internal wiring,multi standard d cables, voltage grinding of cable,gener5al specification of cable

2.2ACESSORIES: Main switch &distribution board, conduit, conduit accessories & fitting, fuse, important definition, determination of size of fuse-wire fuse unit, earthing of conductor, earthing, IS specification, regarding earthing of electrical installation, point to be earthed, determination size of earth wire, earth plate for domestic, industrial installations, material required for GI pipe earthing: - good morning / good afternoon, how are you? today we shall know about ACESSORIES: Main switch &distribution board, conduit, conduit accessories & fitting, fuse, important definition, determination of size of fuse-wire fuse unit, earthing of conductor, earthing, IS specification, regarding earthing of electrical installation, point to be earthed, determination size of earth wire, earth

STUDENT

ACTIVITY

-do-

TEACHER

AID

-do-

9 of 18

9 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

plate for domestic, industrial

installations, material required for GI pipe earthing.

2.3LIGHTING SCHEME: Aspect of good lighting service type of lighting scheme, design of lightning scheme, factory lightning, public lighting installation, street lighting, general rule, for wiring determination of no. of points (light, fan, socket, outlet), determination of total load determination of no. of sub-circuits.: - good morning / good afternoon, how are you? today we shall know about LIGHTING SCHEME: Aspect of good lighting service type of lighting scheme, design of lightning scheme, factory lightning, public lighting installation, street lighting, general rule, for wiring determination of no. of points (light, fan, socket, outlet), determination of total load determination of no. of sub-circuits.

STUDENT

ACTIVITY

-do-

TEACHER

AID

-do-

10 of 18

10 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

COURSE CODE: - EET602 BRANCH: - ELECTRICAL ENGG.

SEMESTER: -6TH TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:

TOPIC: -INTERNAL WIRING (3.1 – 3.5)

SUBJECT: -ELECTRICAL INSTALLATION&ESTIMATING

TIME: -55 minute

NAME OF TEACHER: - M.R A. S ray

CLASS: -6TH semester

STUDENT: -60 TOTAL PERIOD: -16

L.O: - AIM – the student will be able to understand internal wiring. C.O: - Study the Internal wiring.

TEACHING AID: - *Electrical installation&estimating, dhanpatrai son’s.

*website:-https://www.electrical4u.com

*PowerPoint

PRE-REQUSITES: - knowledge of internal wiring was done.

TEACHING POINT & TEACHER ACTIVITY

3.1 Types of internal wiring, cleat wiring, CTS wiring, wooden casing& capping, metal sheathed wiring, conduit wiring, advantage, disadvantage, application. :- good morning / good afternoon , how are you? Today we shall learn about Types of internal wiring, cleat wiring, CTS wiring, wooden casing& capping, metal sheathed wiring, conduit wiring, advantage, disadvantage, application.

STUDENT

ACTIVITY

good morning/good afternoon

TEACHER

AID

chalk, duster PPT.

11 of 18

11 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

TEACHING POINT & TEACHER ACTIVITY

    • Prepare one estimate of material required for CTS wiring for small domestic installation of one room, one verandah, with 25m2 with given ligh, fan, plug point: - good morning / good afternoon, how are you? today we shall know about2Prepare one estimate of material required for CTS wiring for small domestic installation of one room, one verandah, with 25m2 with given light, fan, plug point.
    • Prepare one estimate of material required for conduit wiring for small domestic, installation of one room, one verandah within 25m2 given fan, light, plug point: -

good morning / good afternoon, how are you? today we shall know about Prepare one estimate of material required for conduit wiring for small domestic, installation of one room, one verandah within 25m2 given fan, light, plug point.

    • Preparing one estimate of material required for concealed for domestic installation for two, room one latrine, bath, kitchen, verandah with 80m2 given light fan plug point: -

good morning / good afternoon, how are you? today we shall know about Preparing one estimate of material required for concealed for domestic installation for two, room one latrine,

STUDENT

ACTIVITY

-do-

-do-

-do-

TEACHER

AID

-do-

-do-

-do-

12 of 18

12 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

TEACHING POINT & TEACHER ACTIVITY

Bath, kitchen, verandah with 80m2 given light fan plug point.

3.5Preapre one estimate for material required for erection of conduct wiring, small workshop installation about 30m2and load 10kw: -

good morning / good afternoon, how are you? today we shall know about

To Prepare one estimate for material required for erection of conduct wiring, small workshop installation about 30m2and load 10kw

STUDENT

ACTIVITY

-do-

TEACHER

AID

-do-

13 of 18

13 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

COURSE CODE: - EET602 BRANCH: - ELECTRICAL ENGG.

SEMESTER: -6TH TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:

TOPIC: -OVER HEAD INSTALLATION (4.1-4.4) SUBJECT: -ELECTRICAL ENGINEERING MATERIAL

TIME: -55 minute

NAME OF TEACHER: - M.R A. S ray

CLASS: -6TH semester

STUDENT: -60 TOTAL PERIOD: -16+9

L.O: - AIM – the student will be able to understand overhead installation. C.O: - Study the overhead installation

TEACHING AID: - *Electrical engineering materials, Kataria son’s, k b Raina.

*website:-https://www.electrical4u.com

*PowerPoint

PRE-REQUSITES: - knowledge of OH installation was done.

TEACHING POINT & TEACHER ACTIVITY

4.1Main component of OH lines,line supports, factor governing height of pole, conductor material, determination of size of conductor for OH transmission line, cross arm, pole brackets,clamps,guys&stays conductor configuration, spacing & clearances, span length, OH insulators, type of insulator, lighting arrestor, danger plate,anti-climbing device, bird guards, bead of jumper,jumper,tee- offs,guarding of OH line :- good

STUDENT

ACTIVITY

good morning/good afternoon

TEACHER

AID

chalk, duster PPT.

14 of 18

14 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

TEACHING POINT & TEACHER ACTIVITY

morning / good afternoon, how are you? Today we shall know about Main component of OH lines, line supports, factor governing height of pole, conductor material, determination of size of conductor for OH transmission line, cross arm, pole brackets, clamps, guys&stays conductor configuration, spacing & clearances, span length, OH insulators, type of insulator, lighting arrestor, danger plate, anti-climbing device, bird guards, bead of jumper, jumper, tee-offs, guarding of OH line. 4.2Preapare an estimating of material required of LT distribution line with load of 100kw max & standard span involving calculation of the size of conductor from (conductor chart) current carrying capacity & voltage regulation consider: - good

morning / good afternoon, how are you? Today we shall know about Prepare an estimating of material required of LT distribution line with load of 100kw max & standard span involving calculation of the size of conductor from (conductor chart) current carrying capacity & voltage regulation consider using ACSR.

4.3Prepare an estimate of material required for LT distribution line within load of 100kw max&standard span involving calculation of size of the

STUDENT

ACTIVITY

-do-

TEACHER

AID

-do-

15 of 18

15 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

TEACHING POINT & TEACHER ACTIVITY

conductor current carrying capacity, voltage regulation to be consider: - good morning / good afternoon, how are you? Today we shall know about Prepare an estimate of material required for LT distribution line within load of 100kw max&standard span involving calculation of size of the conductor current carrying capacity, voltage regulation to be consider using ACSR.

4.4Prepare an estimate of material required for HT distribution line 11KV within 2KM & load of 2000kVA max&standard span involving calculation of size of the

conductor current carrying capacity, voltage regulation to be consider: - good morning / good afternoon, how are you? Today we shall know about Prepare an estimate of material required for HT distribution line 11KV within 2KM & load of 2000kVA max&standard span involving calculation of size of the

conductor current carrying capacity, voltage regulation to be consider.

STUDENT

ACTIVITY

-do-

-do-

TEACHER

AID

-do-

-do-

16 of 18

16 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

COURSE CODE: - EET602 BRANCH: - ELECTRICAL ENGG.

SEMESTER: -6TH TOTAL PERIOD: -75

LEARNING OBJECTIVE & COURSE OUTCOME:

TOPIC: -OVER HEAD SERVICE LINE (5.1-5.5) SUBJECT: -ELECTRICAL ENGINEERING MATERIAL

TIME: -55 minute

NAME OF TEACHER: - M.R A. S ray

CLASS: -6TH semester

STUDENT: -60 TOTAL PERIOD: -11+11

L.O: - AIM – the student will be able to understand overhead service line. C.O: - Study the overhead service line.

TEACHING AID: - *Electrical engineering materials, Kataria son’s, k b Raina.

*website:-https://www.electrical4u.com

*PowerPoint

PRE-REQUSITES: - knowledge of OH service line was done.

TEACHING POINT & TEACHER ACTIVITY

5.1Componet of service line, cable, conductor, bearer wire, lacing rod, Ariel fuse, service support, energy box, meter etc.: - good morning / good afternoon, how are you? Today we shall know about Component of service line, cable, conductor, bearer wire, lacing rod, Ariel fuse, service support, energy box, meter 5.2Preapare an estimating for providing 1 phase supply,of load 3kw to each floor of a doubled stored

STUDENT

ACTIVITY

good morning/good afternoon

TEACHER

AID

chalk, duster PPT.

17 of 18

17 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

TEACHING POINT & TEACHER ACTIVITY

building having separate energy meter: - good

morning / good afternoon, how are you? Today we shall know about Prepare an estimating for providing 1 phase supply, of load 3kw to each floor of a doubled stored building having separate energy meter 5.3Prepare an estimate for providing 1 phase supply load of 3kw to each floor of a double stored building having separate energy meter: -

good morning / good afternoon, how are you? Today we shall know about Prepare an estimate for providing 1 phase supply load of 3kw to each floor of a double stored building having separate energy meter.

    • Prepare an estimate of material required for service connection to a factory, building with load within 15kw using insulated wire: -

good morning / good afternoon, how

are you? Today we shall know about Prepare an estimate of material required for service connection to a factory, building with load within 15kw using insulated wire.

    • Prepare one estimate of material required for service connection to a factory building with load within 15kw using bare conductor and insulated wire combined.: -

STUDENT

ACTIVITY

-do-

-do-

-do-

TEACHER

AID

-do-

-do-

-do-

18 of 18

18 | P a g e

ELECTRICAL INSTALLATION & ESTIMATING

TEACHING POINT & TEACHER ACTIVITY

good morning / good afternoon, how are you? Today we shall know about Prepare one estimate of material required for service connection to a factory building with load within 15kw using bare conductor and insulated wire combined.

  1. ESTIMATING FOR DISTRIBUTION SUB STATION: -
    1. ESTIMATE POLE MOUNTED

SUBSTATION: - good morning / good afternoon, how are you? Today we shall know about Estimating a pole mounted substation

    • ESTIMATE PLINTH MOUNTED SUB

STATION: -

good morning / good afternoon, how are you? Today we shall know about Estimating a Plinth mounted substation

STUDENT

ACTIVITY

-do-

-do-

-do-

TEACHER

AID

-do-

-do-

-do-