CEB Press Shaker Assembly Manual
Click here for CEB Press FreeCAD file
CEB Press shaker parts
(hydraulics on next slide, overall checklist on the slide after that)
s01 - shaker mount plate
s02 - barrings mount plate
s03 - motor mount plate
s04 - reinforcing support
s05 - shaker motor
s06 - hammer-T piece 1
s07 - hammer-T piece 2
s08 - keyed hammer shaft
s09 - motor fitting
s10 - washer
s11 - hex nipple
s12 - tee
s13 - reducer bushing
s14 - hex nipple
s15 - valve
s16a - bearing + collar
s17 - bearing
s18 - coupler
s19 - coupler key - (¼” x 1¼”) key
s01
s02
s03
s04
s05
s06
s07
s08
s09
s10
s11
s14
s12
s13
s15
s17
s16
s18
CEB Press shaker assembly steps
Cushion Valve (alternative to needle valve (s15))
Two ½” x 24” hoses
One ¼” x 12” hose
Check list
Tools
(Click here for a tutorial on tools and their uses)
People needed: 2
Safety
CEB Press shaker assembly steps
1. Weld s01, s02, and s04 together at once.
Note 1: Place the s02 on a flat surface and make sure side A of s04 is flesh with the surface of s01; side B of s04 with s02, with the edge of s01 sitting on top of the edge of s02. The ends of s01 and s02 should line up with each other and s04 should be centered.
Note 2: begin with partial weld
Note 3: grind parts that connect to other pieces to make them flat
B
A
s01
s04
s01
s02
s02
s04
Timeframe:
CEB Press shaker assembly steps
3. Weld s06 to s07 to create the hammer
Note 1: begin with partial weld
Note 2: grind parts that connect to other pieces to make them flat
s06
s07
s07
s06
¼”
¼”
2”
2”
s06
s06
s06
s07
s07
s07
CEB Press shaker assembly steps
4. weld shaft (s08) to hammer (s06 and s07)
Note: s08 should stick out a ¼” from s06 (The image is wrong, because s08 sits inside s06 a ¼”. Follow the written instructions.)
s08
s08
s06
s06
s07
s07
CEB Press shaker assembly steps
5. Loosely bolt s16a and s16b onto s02
Use:
Four 2” x ½” bolts
Four ½” washers
Four ½” lock washers
Four ½” lock nuts
A
A
B
B
C
C
D
D
s16a
s16b
s02
s02
s02
s16a
s16b
s01
CEB Press shaker assembly steps
6. Loosely attach the collars (not depicted in FreeCAD graphics) to one side of s16a and one side of s16b, tighten with allen wrench
Note 1: The holes on each collar should be aligned with the holes on the other.
Note 2: Bearing collars prevent the shaft from slipping horizontally. The key (which will be put in later) prevents it from turning. The coupler (which will be slipped on after the hammer shaft is slipped in) holds the two shafts together using the key and collars.
Note 3: The instructions for installing collars, bearings and the shaft on this webpage go in a slightly different order than the instructions we provide for installing these items on the CEB Press shaker, but looking at it might still be helpful: http://www.amibearings.com/mounting-instructions.html
Collars
Timeframe:
CEB Press shaker assembly steps
7. Slip s08 into s16a and s16b Note: the (distance from bearing???)
s08
s08
s16a
s16a
s16b
s16b
Timeframe:
CEB Press shaker assembly steps
8. Slip s17 onto s08 without tightening s17
s17
s17
s08
s08
Timeframe:
CEB Press shaker assembly steps
9. place key in slot on s08 under s17
[image]
Timeframe:
CEB Press shaker assembly steps
10. Slip s05 shaft into s17
11. Align and tighten s17 and the collars
s05
s05
s17
s17
Timeframe:
CEB Press shaker assembly steps
11. bolt s03 to motor, keeping all the parts aligned
12. weld s03 to s02
Note 1: Grind parts that connect to other pieces to make them flat.
Note 2: Center shaft to ensure it won’t get stuck while turning.
s03
s03
s03
s03
s05
s05
s05
s05
s05
Timeframe:
Waaa-la!
Note: there should be a ¼” between the hammer and the hopper--these parts should NOT touch.
Next part: attach the hydraulics
(s05)
(s15)
(s11, s14)
(s12)
(s13)
CEB Press shaker - hydraulics assembly
Assemble the pieces as shown in the diagram, placing thread tape around the threading on the ½” nipples and hose ends before attaching the pieces together.
Note: fittings on motor must face down, meaning the diagram on the left is upside-down
CEB Press shaker - hydraulics assembly
using a ½” washer (s10), attach the motor fitting (s09) to the motor (s05)
Timeframe:
CEB Press shaker - hydraulics assembly
attach ½” hex nipple to shaker motor
Timeframe:
CEB Press shaker - hydraulics assembly
attach tee to hex nipple 1
attach hex nipple 2 to the tee
attach reducer bushing to tee
Timeframe:
1.
2.
3.
CHANGE INSTRUCTIONS TO FIT PHOTO ON SLIDE AFTER NEXT
CEB Press shaker - hydraulics assembly
attach valve to hex nipple 2
Note: You can use different kinds of valves, depending upon how much stress the machine is likely to endure. In this instructional, we explain how to use a needle and cushion valve.
Timeframe:
how should I make this graphic better/more explanatory? Is there a photo from the workshop I can use? -
YES - GO TO WISCONSIN BUILD ON TROVEBOX
Needle valve
Cushion valve
CHANGE INSTRUCTIONS TO FIT PHOTO ON NEXT SLIDE
CEB Press shaker - hydraulics assembly
attach ¼” hose to valve and motor fitting
attach ½” hoses to bottom of motor and valve (the other ends will attach to the solenoid (?))
Timeframe:
IMAGERY NOT CLEAR, HOW CAN I FIX THIS?
CHANGE INSTRUCTIONS TO FIT PHOTO ON THIS SLIDE
Partial Welding
Partial weld parts when instructed
This is done so that the pieces won't move/warp as the metal cools.
To partial weld, start by welding tacks where each black circle is.