CEB Press Shaker Assembly Manual

Click here for CEB Press FreeCAD file

2 of 26

CEB Press shaker parts

(hydraulics on next slide, overall checklist on the slide after that)

s01 - shaker mount plate

s02 - barrings mount plate

s03 - motor mount plate

s04 - reinforcing support

s05 - shaker motor

s06 - hammer-T piece 1

s07 - hammer-T piece 2

s08 - keyed hammer shaft

s09 - motor fitting

s10 - washer

s11 - hex nipple

s12 - tee

s13 - reducer bushing

s14 - hex nipple

s15 - valve

s16a - bearing + collar

s17 - bearing

s18 - coupler

s19 - coupler key - (¼” x 1¼”) key

s01

s02

s03

s04

s05

s06

s07

s08

s09

s10

s11

s14

s12

s13

s15

s17

s16

s18

3 of 26

CEB Press shaker assembly steps

Cushion Valve (alternative to needle valve (s15))

Two ½” x 24” hoses

One ¼” x 12” hose

4 of 26

Check list

  1. 1/2"x1 1/2" bolt (6)
  2. 1/2" nylon lock nut (6)
  3. 1/2" washer (6)
  4. 1/2" lock washer (6)
  5. 1 (¼”) NPTF swivel (???)
  6. 1 (¼”x12”) NPTM hose
  7. 2 (½”x24”) NPTM hoses
  8. s01 - shaker mount plate
  9. s02 - bearings mount plate
  10. s03 - motor mount plate
  11. s04 - reinforcing support
  12. s05 - shaker motor
  13. s06 - hammer-T piece 1
  14. s07 - hammer-T piece 2
  15. s08 - hammer shaft
  16. s09 - motor fitting
  17. s10 - washer
  18. s11 - hex nipple
  19. s12 - tee
  20. s13 - reducer bushing
  21. s14 - hex nipple
  22. s15 - valve
  23. s16 - bearing + collar
  24. s17 - bearing
  25. s18- coupler
  26. s19 - coupler key - (¼” x 1¼”) key

5 of 26

  • Welder
  • C Clamp
  • Wrench
  • Drill
  • Ironworker punch
  • Abrasive cut-off
  • Angle grinder
  • Thread tape

Tools

(Click here for a tutorial on tools and their uses)

People needed: 2

6 of 26

Safety

  • Eye Protection
  • Welding Gloves
  • Sound Protection
  • First Aid Kit
  • Welding Mask
  • Hard Hat

7 of 26

CEB Press shaker assembly steps

1. Weld s01, s02, and s04 together at once.

Note 1: Place the s02 on a flat surface and make sure side A of s04 is flesh with the surface of s01; side B of s04 with s02, with the edge of s01 sitting on top of the edge of s02. The ends of s01 and s02 should line up with each other and s04 should be centered.

Note 2: begin with partial weld

Note 3: grind parts that connect to other pieces to make them flat

B

A

s01

s04

s01

s02

s02

s04

Timeframe:

  • 30 seconds to assemble
  • 2½ minutes to tack
  • 6 minutes to weld

8 of 26

CEB Press shaker assembly steps

3. Weld s06 to s07 to create the hammer

  • weld the side of s06 farthest from the hole to s07
  • center s06 on the side of s07 it’s welded to. Then weld s08 to s06, so that s08 is going through the hole and sticking out ¼ inch.

Note 1: begin with partial weld

Note 2: grind parts that connect to other pieces to make them flat

s06

s07

s07

s06

¼”

¼”

2”

2”

s06

s06

s06

s07

s07

s07

9 of 26

CEB Press shaker assembly steps

4. weld shaft (s08) to hammer (s06 and s07)

Note: s08 should stick out a ¼” from s06 (The image is wrong, because s08 sits inside s06 a ¼”. Follow the written instructions.)

s08

s08

s06

s06

s07

s07

10 of 26

CEB Press shaker assembly steps

5. Loosely bolt s16a and s16b onto s02

Use:

Four 2” x ½” bolts

Four ½” washers

Four ½” lock washers

Four ½” lock nuts

A

A

B

B

C

C

D

D

s16a

s16b

s02

s02

s02

s16a

s16b

s01

11 of 26

CEB Press shaker assembly steps

6. Loosely attach the collars (not depicted in FreeCAD graphics) to one side of s16a and one side of s16b, tighten with allen wrench

Note 1: The holes on each collar should be aligned with the holes on the other.

Note 2: Bearing collars prevent the shaft from slipping horizontally. The key (which will be put in later) prevents it from turning. The coupler (which will be slipped on after the hammer shaft is slipped in) holds the two shafts together using the key and collars.

Note 3: The instructions for installing collars, bearings and the shaft on this webpage go in a slightly different order than the instructions we provide for installing these items on the CEB Press shaker, but looking at it might still be helpful: http://www.amibearings.com/mounting-instructions.html

Collars

Timeframe:

  • (time) to assemble

12 of 26

CEB Press shaker assembly steps

7. Slip s08 into s16a and s16b Note: the (distance from bearing???)

s08

s08

s16a

s16a

s16b

s16b

Timeframe:

  • 15 minutes to assemble

13 of 26

CEB Press shaker assembly steps

8. Slip s17 onto s08 without tightening s17

s17

s17

s08

s08

Timeframe:

  • (time) to assemble

14 of 26

CEB Press shaker assembly steps

9. place key in slot on s08 under s17

[image]

Timeframe:

  • (time) to assemble

15 of 26

CEB Press shaker assembly steps

10. Slip s05 shaft into s17

11. Align and tighten s17 and the collars

s05

s05

s17

s17

Timeframe:

  • 5 minutes to assemble

16 of 26

CEB Press shaker assembly steps

11. bolt s03 to motor, keeping all the parts aligned

12. weld s03 to s02

Note 1: Grind parts that connect to other pieces to make them flat.

Note 2: Center shaft to ensure it won’t get stuck while turning.

s03

s03

s03

s03

s05

s05

s05

s05

s05

Timeframe:

  • (time) to bolt
  • (time) to weld

17 of 26

Waaa-la!

Note: there should be a ¼” between the hammer and the hopper--these parts should NOT touch.

18 of 26

Next part: attach the hydraulics

19 of 26

(s05)

(s15)

(s11, s14)

(s12)

(s13)

20 of 26

CEB Press shaker - hydraulics assembly

Assemble the pieces as shown in the diagram, placing thread tape around the threading on the ½” nipples and hose ends before attaching the pieces together.

Note: fittings on motor must face down, meaning the diagram on the left is upside-down

21 of 26

CEB Press shaker - hydraulics assembly

using a ½” washer (s10), attach the motor fitting (s09) to the motor (s05)

Timeframe:

  • (time) to assemble

22 of 26

CEB Press shaker - hydraulics assembly

attach ½” hex nipple to shaker motor

Timeframe:

  • (time) to assemble

23 of 26

CEB Press shaker - hydraulics assembly

attach tee to hex nipple 1

attach hex nipple 2 to the tee

attach reducer bushing to tee

Timeframe:

  • (time) to assemble motor fittings

1.

2.

3.

CHANGE INSTRUCTIONS TO FIT PHOTO ON SLIDE AFTER NEXT

24 of 26

CEB Press shaker - hydraulics assembly

attach valve to hex nipple 2

Note: You can use different kinds of valves, depending upon how much stress the machine is likely to endure. In this instructional, we explain how to use a needle and cushion valve.

Timeframe:

  • (time) to attach valve

how should I make this graphic better/more explanatory? Is there a photo from the workshop I can use? -

YES - GO TO WISCONSIN BUILD ON TROVEBOX

Needle valve

Cushion valve

CHANGE INSTRUCTIONS TO FIT PHOTO ON NEXT SLIDE

25 of 26

CEB Press shaker - hydraulics assembly

attach ¼” hose to valve and motor fitting

attach ½” hoses to bottom of motor and valve (the other ends will attach to the solenoid (?))

Timeframe:

  • (time) to attach hoses

IMAGERY NOT CLEAR, HOW CAN I FIX THIS?

CHANGE INSTRUCTIONS TO FIT PHOTO ON THIS SLIDE

26 of 26

Partial Welding

Partial weld parts when instructed

This is done so that the pieces won't move/warp as the metal cools.

To partial weld, start by welding tacks where each black circle is.