Port Superior Marina Haul-Out Form
All boats must be out of the water by Tuesday, October 31, 2017

For questions, please contact Kelly Zwetow at
715-779-5360 or Kelly.Zwetow@portsuperior.com

Personal and Boat Information
Boat Owner Name
Your answer
Boat Name
Your answer
Email Address
Your answer
Phone Number
Phone where you can be reached during the day
Your answer
Current Slip Number
Marina, if not Port Superior, or Slip Number
Your answer
2018 Slip Number Request
Please let us know if you intend to rent your current slip next summer.
Your answer
PSMA Member?
Required
Key or Combo Information
Your answer
Preferred Haul-Out Date:
In October, we will provide haul-out service on Saturday the October 14th & 21st. Apple Fest is October 6th-8th this year. We do not haul boats on Sundays. Haul-out must be completed prior to October 31, 2017
MM
/
DD
Owner Present?
*If you plan to be present, we ask you bring your boat to the crane/fuel dock area on that day. If you are not present at haul-out, PSMA will provide this service to you at the regular decommissioning service rate.
No Haul-Out – We request decommissioning ONLY.
No decommissioning – We request Haul Out ONLY.
Haul-Out & Decommissioning Services
FEE: $9.75/ft plus sales tax
This includes pressure wash of bottom & water line.

Please check requested services to be performed at haul-out. Services provided at time and materials, billed at hourly rate. Owner will be contacted if additional services are required. Your haul out and storage location will be set to accommodate your anticipated launch date. Fees will be incurred if changes are required.

NOTE: There is a $100.00 fee for hazardous waste clean up for overboard discharge that is not disabled.

Boat Length
Your answer
Winterization and Decommissioning
Fuel Dock Services
Required
Followup for Fuel stabilizer: Approx size (gallons) of Fuel Tank
Your answer
Mechanical Services
Required
* Follow up to Battery Question
List number of batteries to be disconnected
Your answer
Winterize water systems
Water systems
Required
For each item above with **, please list the number of each on your boat
example: 3 water tanks, 5 faucets
Your answer
Any other winterization or decommissioning requests?
Your answer
Additional Requests
Charges are separate, as explained below.
Additional Services
Required
SPRING 2018 LAUNCH PLANS
Your spring launch plans will help determine your winter storage location. Please circle the time in the Spring of 2018 that you anticipate launching your boat. As with haul-out, launch is based on a first come-first served basis.
Spring Launch Plans
Check applicable week
Pre-Haulout Oil & Filter and/or Fuel Filter Change
PLEASE NOTE:
The changing of engine oil/filter and/or fuel filter is not a part of
winterization.

These services will be completed separately upon request, preferably performed prior to the 1st day of haul-out (September 30, 2017).

Manufacturers recommend that the oil and filter be changed annually. We recommend oil changes and fuel filter changes be completed prior to Fall Haul-out. Having your oil changed in the Fall of the year will benefit and protect your engines during winter storage.

Pre-Haulout Change
prior to haul out. Services are provided on a time and materials basis, billed at hourly rate.
Required
Date(s) (Prior to 9/26/2017) that Boat is available for service work
Your answer
2017-2018 WINTER WORK & SERVICES - Scheduling Discounts
Electronic Equipment Installation and Interfacing
Engine Overhauling and Repower
Battery System Upgrades
Furling System Installation
Rigging Upgrades

In November/December ‘17 – Receive 10% Discount on Labor Charges.

After January 1, 2018– All estimates issued will be subject to possible increased labor and materials rates.

We are considering Winter Work
Work Requested
Please provide a detailed description of the nature and scope of your project. OR, provide a brief description and request a call back for details.
Your answer
Shrink Wrap Request Section
Port Superior Marina is offering Shrink Wrapping to our customers. It protects your boat from heavy snow build-up and keeps the elements out. Protect your investment over the upcoming winter.

Port Superior Marina contracts shrinkwrapping services to enable the process to be completed shortly after haul-out. Our contractor will guarantee workmanship, but is not responsible for vinyl enclosures, equipment mounted on radar arches, hard tops or pulpits (spotlights, radars, antennas, etc.), acts of nature, i.e. heavy snowfalls, high winds, shrinkwrap that has been cut into, and/or poorly maintained boats or boat parts.

Snow removal may be necessary on shrinkwrapped boats under certain snow conditions. Port Superior Marina and their contractor cannot accept responsibility for issues arising on painted vessels due to shrink wrapping, or how materials on your vessel will react to being in contact with shrink wrap or the shrink wrapping process. There will be a $125 charge in the Spring for removal and disposal of material in mid to late April unless specifically requested not. Owner will be responsible for removal on later dates.

Shrink Wrap Rates

Less than 32’ $18.75/ft
32’ to 35’ $19.75/ft
36’ to 40’ $20.75/ft
41’ to 44’ $21.75/ft
45’ and up $23.75/ft
Zippered Door Installed $80.00/door

I want to have my boat shrink wrapped this fall
Overall Length of Boat
Please include bow pulpit, stern rail, swim platform, etc
Your answer
Beam of Boat
Your answer
Do you have existing frame work with your cradle?
Special Instructions/Comments
Your answer
Submission
By clicking the submit button, you are signing that these are the services you are requesting for 2016 Haul Out You will be billed for any services requested.

PSMA is not responsible for any services that are not marked on the form.

Submit
Never submit passwords through Google Forms.
This content is neither created nor endorsed by Google. Report Abuse - Terms of Service - Additional Terms