Royal Supplier Self-Assessment Form
Sign in to Google
to save your progress.
Learn more
* Indicates required question
Email
*
Your email
Supplier Name & Location
*
Your answer
Date
*
MM
/
DD
/
YYYY
Does the Supplier have 3rd party certification for IATF 16949? What steps are being taken to become certified.
*
Yes, IATF 16949 certified and there are written procedures which are being followed. A feedback loop exists.
ISO 9001 certified, and there are written procedures which are being followed.
No plans to achieve IATF 16949 or ISO 9001
Is the Supplier ISO 14001 certified? Does the Supplier understand and conform to all environmental regulations?
*
Yes
Documented, achievable plan in place.
No plans for ISO 14001 certification.
Does the Supplier have a 5S program that ensures work areas are clean, orderly, and free from hazards? Are 5S facility audits conducted?
*
Documented 5S program in place; evidence of audits is available.
Documented 5S program in place; no audits conducted
No 5S program. 5S is poor
Are Key Performance Indicators (KPI's) tracked and utilized for quality improvement?
*
KPI's are tracked and posted, with goals set for each. Corrective actions are in place for any KPI not meeting the goal.
KPI's exist. Corrective actions are not in place for KPI's not meeting goal
KPI's not posted, lack of improvement plans
Is there a procedure followed that defines the control, and prevents the escape, of non-conforming material?
Documented system in place, immediate quarantine process prevents unintended use of product.
System in place/manual system, not documented; inconsistent or not immediate quarantine process
Lack of adequate controls
Clear selection
Is there a receiving inspection system in place?
*
System in place. Incoming materials are prevented from moving into inventory until inspection is completed and deemed conforming
Manual system not too difficult for suspect or nonconforming material to be moved into inventory.
Lack of systematic controls
Are critical product and process characteristics identified, managed, and controlled?
*
Critical Characteristics identified and have strong controls in place
Critical Characteristics aren't identified or limited controls are in place
Poor system
Do manufacturing work instructions, and other documented standard work/ job instructions, exist? Are they audited?
*
Instructions are clear, are available at the work station, are audited, and have controls in place triggering updates.
Instructions are available, but not clear, audited or updated
Poor or lack of system
Does the Supplier have a preventive maintenance schedule for their equipment?
*
Robust system that is visual and followed
Manual system that is scheduled and followed
No controlled schedule / plan
Does the Supplier have an employee training matrix, and are back-ups trained for each job?
*
Systemic training program exists, training includes evidence of knowledge, matrix is up to date and being followed
Manual training process exists. Doesn't include evidence of knowledge or matrix outdated.
Poor controls of training matrix or does not exist
Does the Supplier implement poka-yokes/error proofing in their manufacturing processes?
*
Poka-yoke, error proofing in place for all critical process outputs
Poka-yokes in place for some critical process outputs
Little to poor poka yoke strategy
Does lot traceability and part identification exist through the manufacturing process?
*
Parts easily identified, both electronically and visually, as to their place in the process. Effective lot traceability in place
Manual system or limited electronic part identification and lot traceability
Poor system without adequate controls
Is there an effective inventory management system? Is FIFO used?
*
Inventory is controlled electronically or by a strict system; FIFO consistently utilized
Inventory not electronically controlled; FIFO not consistently utilized
No system in place
Does the Supplier have a system for managing, tracking, and communicating launch activities and engineering changes?
*
Documented system in place, consistently updated and communicated to cross-functional leadership group
Manual system, not completely followed, or not controlled.
Poor system in place that could allow missing steps
Does the plant have a process flow that covers all operations from Receiving to Shipping?
*
Yes and up to date. Movement is controlled, tracked throughout the plant.
Process Flow does not cover all operations
Poor Process Flow documentation
Are PFMEAs and Control Plans created for each product by a cross-functional team, and are they kept up to date?
*
PFMEAs & Control Plans are generated by cross-functional team and up to date electronically.
PFMEA's and Control Plans are not robust - manual (not from crossfunctional team, not up to date)
Poor use of PFMEAs or Control Plans
Do PFMEA items with a high RPN, or high severity, occurrence, or detection, have a reaction plan noted in the Control Plan?
*
Highest RPN's, or items with a high severity, occurrence, or detection, have an associated action plan noted on the Control Plan
Not all of the noted items from the PFMEA have an associated reaction plan noted on the Control Plan
Poor use of PFMEAs or Control Plans
Has the Supplier reviewed Royal's Supplier Handbook, and have actions been taken to incorporate Royal-specific requirements?
*
Royal's Supplier Handbook has been reviewed and all Royal-specific requirements have been incorporated into the Supplier's processes
Royal's Supplier Handbook has been reviewed and some Royal-specific requirements have been incorporated into the Supplier's processes
Royal's Supplier Handbook has not been reviewed; Royal-specific requirements have not been incorporated into the Supplier's processes
Next
Clear form
Never submit passwords through Google Forms.
This form was created inside of Royal.
Does this form look suspicious?
Report
Forms
Help and feedback
Contact form owner
Help Forms improve
Report