Report this as total combined power (BHP or LB/HR) of entire steam room.
Your answer
Steam Boiler Demand - Average *
Report this as average demanded steam load by the plant.
Your answer
Percentage of Current Condensate Return (%)
Optional if not known.
Your answer
Makeup Water Average (GPM)
Only use this if you don't know the answer to the previous question. You might answer this by finding the size of your water softner system and its average demand.
Your answer
(Optional) Install Location Pipe Size (inches)
Needed to determine vessel size and options.
Your answer
(Optional) Install Location Condensate Flow (GPM)
Needed to determine vessel size and options.
Your answer
(Optional) Install Location Condensate Pressure
Needed to determine vessel size and options.
Your answer
(Optional) Install Location Condensate Temperature
Needed to determine vessel size and options.
Your answer
Next
Clear form
Never submit passwords through Google Forms.
This form was created inside of Automation Tech Inc. Report Abuse