Boiler Power and Pearl Trap Survey
Boiler stats and actual site information about the Steam System that needs to be reported. The primary goal here is to determine the actual cost of energy that we are handling, approximate flow and demand capacities, and what kind of vessel options may be required.
Sign in to Google to save your progress. Learn more
Email *
Steam Boiler Demand -  Measure Unit *
Steam Boiler Demand - MAX
Report this as total combined power (BHP or LB/HR) of entire steam room.
Steam Boiler Demand - Average *
Report this as average demanded steam load by the plant.
Percentage of Current Condensate Return (%)
Optional if not known.
Makeup Water Average (GPM)
Only use this if you don't know the answer to the previous question. You might answer this by finding the size of your water softner system and its average demand.
(Optional) Install Location Pipe Size (inches)
Needed to determine vessel size and options.
(Optional) Install Location Condensate Flow (GPM)
Needed to determine vessel size and options.
(Optional) Install Location Condensate Pressure
Needed to determine vessel size and options.
(Optional) Install Location Condensate Temperature
Needed to determine vessel size and options.
Next
Clear form
Never submit passwords through Google Forms.
This form was created inside of Automation Tech Inc. Report Abuse