Test Series: 1 - Surveying(Random Question)
The Main Principle of Surveying is to Work From
1 point
The RF of Scale 1 cm = 1 km is
1 point
The Smallest Length That can be Drawn on a Map is
1 point
A building is an obstacle to
1 point
The Allowable Length of an Offset Depends upon the
1 point
Invar tape is made of an alloy of
1 point
The Direction of Survey Lines may be Expressed in Term of
1 point
The Angle of Dip at a Point on Equator is
1 point
The Bearing of a Line in the Opposition Direction of the Progress of Survey is Known as
1 point
In Chain Surveying, Field Work is Limited to
1 point
Submit
Never submit passwords through Google Forms.
This content is neither created nor endorsed by Google.