Class-9,Work and Energy
Sign in to Google to save your progress. Learn more
Name of Student *
Contact No. *
Q1) Work done by centripetal force is *
1 point
Q2) 9800 joule of energy was spent to raise a mass of 50kg, the mass was raised to a height of  (take g = 9.8 m/s2) *
1 point
Q3) A machine does 2000 joule of work in 400 seconds. What is the power of machine? *
1 point
Q4) Calculate the time taken by a 150 w bulb of consuming 3000 joule of energy. *
1 point
Q5) What is the force required to lift a block of mass 2m? *
1 point
Q6) Statement A: Work is said to be done when a camel is carrying a load on its back                              Statement B: Work is said to be done when a sailboat is moving due to wind energy                                                     Which of the above statement is true? *
1 point
Q7) 1 W. S = ________? *
1 point
Q8) *
1 point
Captionless Image
Q9) *
1 point
Captionless Image
Q10) For what value of θ is work done maximum? *
1 point
Submit
Clear form
Never submit passwords through Google Forms.
This content is neither created nor endorsed by Google. Report Abuse - Terms of Service - Privacy Policy