Sarawak Electricity Rules & Regulations Quiz
Before this quiz starts, you must have a Sarawak Electricity Rules and Regulations 1999 Book
To help anyone taking up the Law paper of Sarawak Electricity Rules and Regulation Examination.

Disclaimer:   For practise only.
Sign in to Google to save your progress. Learn more
1)   Choose the best answer to fill in the blank for the following statement “__________ means connected to the general mass of the earth”.
1 point
Clear selection
2)  What is the minimum working experience to undertake the Certificate of Competency as an Electrical Supervisor?
1 point
Clear selection
3)  Which of the following SHALL NOT be used as a sole means of earthing?
1 point
Clear selection
4)  Which grade of Wireman is allowed to carry out any electrical wiring in an installation operating at low voltage in Sarawak which receives three phase supply from the public installation licensee?
1 point
Clear selection
5)  Under the Electricity Rules 1999, all the final circuits in an installation must be protected against earth leakage current. What type of device is to be used to provide such protection?
1 point
Clear selection
6)   According to Electricity Rules 1999, what is the maximum allowable height for a fireman switch to be fixed from the ground?
1 point
Clear selection
7)   Define the word “wireman” as stated in the Electricity Ordinance?
1 point
Clear selection
8)   According to The Electricity Rules 1999, before a wireman certificate is issued to a person, he/she must satisfy the Board with the followings, EXCEPT?
1 point
Clear selection
9)   Refer to The Electricity Rules 1999, a motor shall be controlled by ____.
1 point
Clear selection
10)   The board of Examiners consist of members from the following, EXCEPT____.
1 point
Clear selection
11)  The Form B is to be submitted by owner or management to perform inspection and testing of a new installation according to Rule 8. The inspection and testing should be carried out within how many days after the receipt of Form B?
1 point
Clear selection
12)  Before a Certificate of Competency as an Electrical Services Engineer is issued to the person, he shall _________.
1 point
Clear selection
13)  What is the minimum age for a person to sit for Certificate of Competency as Wireman according to Regulation?
1 point
Clear selection
14)  Which statements below are considered as “serious misconducts” as stated in The Electricity Rules, 1999?
1 point
Clear selection
15)  Among the following, who is NOT competent to operate an installation at a voltage exceeding 600 volt but not exceeding 132,000 volt?
1 point
Clear selection
16)   If an auto-transformer is used for any purpose, what should be taken care of?
1 point
Clear selection
17)   Referring to Rule 18, the effective means of isolation shall be provided according to the following, EXCEPT _____.
1 point
Clear selection
18)  Which of the following shall NOT be effectively earthed?
1 point
Clear selection
19)  What is the rating of Residual Current Device (RCD) to be used in condition where the floor is likely to be wet?
1 point
Clear selection
20)  What is the minimum number of inspections carried out by a competent person to an installation not exceeding 600 volts and receiving energy via a switchgear rated above 100 amperes.
1 point
Clear selection
21)  Before issuing or renewing a Certificate of Registration for an Electric Sign Contractor, the Chief Electrical Inspector shall require the person to submit the following information, EXCEPT ______.
1 point
Clear selection
22)   A Certificate of Registration as an Electrical Repair Contractor shall be in Form Q and how long does this license valid?
1 point
Clear selection
23)  Which of the following statement best describe the Maintenance of Installations according to The Electricity Rule 1999?
1 point
Clear selection
24)   Which form shall be used to certify a CERTIFICATE OF COMPETENCY AS A CHARGEMAN?
1 point
Clear selection
25)   What is a service line?
1 point
Clear selection
26)   What does it means by “extra low voltage” as stated in the Electricity Rules, 1999?
1 point
Clear selection
27)   After receipt of Form B, inspection and test of a new installation for the purpose of registration shall be made not later than ____________.
1 point
Clear selection
28)  According to Rule no 107, no competent person or person under the control of a competent person shall reclose any switch until he is certain that_____
1 point
Clear selection
29)   What type of switch is normally used for controlling the circuit of an electric sign?
1 point
Clear selection
30)   Which of the following statement describe the experience required by a cable jointer?
1 point
Clear selection
Submit
Clear form
This content is neither created nor endorsed by Google.