Create Work breakdown structure

Once the scope is defined, the next step is to decompose the scope into a work breakdown structure. It is the process of decomposing the project work into smaller, more manageable components (work packages). (P#156)

Email address *
Create Work breakdown structure (WBS)
1) _________ is a technique used for dividing and subdividing the project scope and project deliverables into smaller and more manageable parts (P#158)
0 points
2) Work packages are the lowest level of the WBS for which cost and duration can be estimated and managed. Which of the following are not true about work packages? (P#158)
1 point
3) 100 percent rule suggests that....
1 point
4) The scope baseline is the approved version of a scope statement, WBS, and it's associated WBS dictionary, which can be changed only through formal change control procedures, and is used as a basis for comparison. Components of the scope baseline include... (P#161)
1 point
5) Which of the following is not true about work packages? (P#161)
1 point
6) A work breakdown structure component below the control account and above the work package with known work content but without detailed schedule activities is known as.... (P#161)
1 point
7) A document that provides detailed deliverable, activity, and scheduling information about each component in the WBS (P#162)
0 points
8) Information in the WBS dictionary may include.... (P#162)
1 point
9) A work breakdown structure does not show the sequence of work or timelines. It provides only the breakup of work. True or False?
1 point
10) While creating the work breakdown structure, the requirements documentation can get updated to include the approved changes. True or False (P#162)
1 point