Formula SAE-A 2019 Document Submissions
All document submissions must be uploaded by the Team Leader using the email address that was used to register your team.

If you have multiple team entries, please upload your documents for each entry separately using a unique email address.

Email address *
Team Leader Name *
University Name *
Competition Class *
Car Number
Your permanent Formula SAE-A car number. First time entries, leave this blank.
Electronic Throttle Control (ETC) Notice of Intent
Due 17 May 2019. Applies to internal combustion vehicles only.
Electrical System Advisor and Electrical System Officer Form
Due 6 September 2019. Applies to electric vehicles only.
Electrical System Form (ESF)
Due 6 September 2019. Applies to electric vehicles only.
Failure Modes and Effects Analysis (FMEA)
Due 6 September 2019. Applies to electric vehicles only.
Electronic Throttle Control - Failure Modes and Effects Analysis (FMEA)
Due 13 September 2019. Applies to internal combustion vehicles only, with an approved Electronic Throttle Control (ETC) Notice of Intent.
Structural Equivalency Spreadsheet (SES)
Due 20 September 2019.
Impact Attenuator Data (IAD)
Due 27 September 2019.
Design Report
Due 4 October 2019. Applies to internal combustion and electric vehicles.
Design Specification Sheet
Due 4 October 2019. Applies to internal combustion and electric vehicles.
Design Report Video
Due 4 October 2018. Optional, YouTube link as per S.4.3 (A) in 2019 Addendum V3 dated 14 March 2019.
Cost Report eBOM
Due 11 October 2019. Submit both PDF and Excel formats, with file name per Formula SAE International rules S4.9.1. Applies to internal combustion and electric vehicles.
CAMS Licence Applications
Due 25 October 2019. ZIP multiple documents into a single file for upload.
Declaration of Planned Hazardous Materials and MSDS
Due 1 November 2019. ZIP the summary document and MSDS documents into a single file for upload. Applies to internal combustion and electric vehicles.
Technical Inspection Checklist
Due 2 December 2019. Applies to internal combustion and electric vehicles.
Egress Times List
Due 2 December 2019. Applies to internal combustion and electric vehicles.
Electrical Inspection Checklist
Due 2 December 2019. Applies to electric vehicles only.
Submit
Never submit passwords through Google Forms.
reCAPTCHA
This content is neither created nor endorsed by Google. - Terms of Service