Proposed Brighton Park Projects
Share your thoughts on proposed projects the Board may focus on next! Select the order you would like to see proposed projects completed, with 1 being first and 6 being last. If you are not a fan of these ideas, let us know!

If a project advances to the bid stage, the Board obtains three separate bids that meet Board-defined specifications. A bid is not ratified unless either an unanimous electronic approval vote is obtained from the Board or from a majority Board approval vote during the monthly meeting. After a contract has been ratified, materials are ordered, manufactured, and installed based on the contractor's schedule and Board requirements. The entire process from idea to project completion often takes 12 months or more.

This process allows for the vetting of projects to ensure they meet budgetary requirements that focus on enhancing community elements, maintaining monthly condo fees, and promoting a strong community that can meet financial and social needs.

Email address *
Mailbox shelters *
Design is from Lucid Management, out of Canada and will be locally installed. An alternative design is called Woodlands and has a wooden ceiling. Both use LEDs to illuminate the mailboxes at night.
Captionless Image
First
Last
Replacement Pool Furniture *
These tables would replace the current deteriorating concrete furniture.
These tables would replace the current deteriorating concrete furniture.
First
Last
Security cameras *
These FLIR cameras would be used for perimeter security and compliance.
These FLIR cameras would be used for perimeter security and compliance.
First
Last
A clubhouse at the west pool *
This would be an addition to the existing pump house, and use existing key cards for access. Ongoing maintenance costs would include added insurance, cleaning, and replacement costs.
This would be an addition to the existing pump house, and use existing key cards for access. Ongoing maintenance costs would include added insurance, cleaning, and replacement costs.
First
Last
Security gates *
At each entrance, possibly using your Ez-Pass transponder
At each entrance, possibly using your Ez-Pass transponder
First
Last
A dog park *
This would be near Titchfield & Hambledon Loop
This would be near Titchfield & Hambledon Loop
First
Last
Comments on current projects being studied or suggestions for other projects:
Submit