EcoFINISH Installation Questionnaire
Sign in to Google to save your progress. Learn more
Email *
Company Name *
Your Name *
The purpose of this video is to briefly review the Installation process. The video will go through the various different steps that are required for the proper installation of our finishes.
Safety -
1. What is the primary occupational health risk related to the epoxy primer? *
2 points
2. How should you prepare to install an ecoFINISH® product on an indoor pool? *
2 points
3. What steps should you take for propane safety? *
2 points
4. What care must be taken when handling the ecoFINISH® coatings applicator gun? *
2 points
Hollow Spots -
5. In it’s current state; how do you know when the pool/structure may not be a candidate for EcoFINISH? *
2 points
6. How do you test the integrity of the original surface? *
2 points
7. What is the widest crack allowable, before the substrate should be repaired for best results? *
2 points
8. What to do if the substrate has structural cracks and/or visibly rusted rebar? *
2 points
9. What type of material should you use to patch the substrate? *
2 points
10. What should you do with osmotic blisters and/or cobalt spotted areas? *
2 points
Weepers
11. What is considered a “weeper”? *
2 points
12. Where are “weepers” most commonly found? *
2 points
13. Can you apply the finish; if the weeper has not stopped? *
2 points
14. What’s a good method to relief the cause of the weeper? *
2 points
Acid Etching
15. What is the main purpose of acid etching of plaster or concrete surfaces prior to coating? *
2 points
16. What is the dilution % of acid used to etch the plaster or concrete surface? *
2 points
17. At the completion of the acid etching step, how should the surface look and feel? *
2 points
18. How many times should you apply the acid? *
2 points
19. Per the EcoFINISH manual; what product can be added to the acid to keep it longer to vertical surfaces for better etching? *
2 points
20. How long do you leave the acid to work on the surface? *
2 points
Power washing
21. What is the minimum recommended power of the pressure washer? *
2 points
22. What type of tip/nozzle should you use? *
2 points
23. Is it important to pressure wash every square inch of the surface? *
2 points
50/50
24.  During the coating process; what is the main purpose of the 50/50 epoxy primer layer? *
2 points
25. If the surface shows dry areas, after the 50/50, what’s the next step in the installation process? *
2 points
26.  On warmer days, during the cure cycle, outgassing from the plaster or concrete surface can cause  tiny bubbles to be formed and cured into the 50/50 epoxy layer; what steps should the installer take to complete the installation? *
2 points
27. How long should the epoxy be mixed to activate the chemical reaction? *
2 points
28. What is added to the epoxy to create a less viscous mixture? *
2 points
29. What is the amount of time between 50/50 and 100/100? *
2 points
30. How many times do you have to roll 50-50 epoxy primer on a concrete pool? *
2 points
100%
31.  At what temperature of the substrate; will the epoxy primer stop curing? *
2 points
32. When should X40C (cool weather epoxy) be used in place of X40? *
2 points
33. What should an installer do, if the epoxy is no longer tacky, prior to the Floc-coat? *
2 points
34. What’s the maximum coverage area of 100% epoxy primer that should be applied, prior to flocking? *
2 points
35. What should you do if the epoxy gets rained on? *
2 points
36. What is req’d to add to the 100% epoxy mix to ensure the surface area is completely covered? *
2 points
37. Why and how can the epoxy be “boiled”; when applying the finish? *
2 points
Shooting Video
38. What are the settings on the PRO-UNIT machine when installing on a Cementitious surface? *
2 points
39. Why is the powder flow rate decreased for each successive layer? *
2 points
40.  Based on the temperature of the substrate being at 68° F (20° C); what’s the minimum recommended time between the flock and the 2nd coat, to avoid boiling the epoxy? *
2 points
41. Why is it critical that the initial hot flock coating be installed onto the 100% red-tinted epoxy while it is still in the tacky phase, and not hard set cured? *
2 points
42. When applying the initial hot flock layer of coating onto a 100% red-tinted epoxy surface, and you notice that the epoxy is no longer tacky, what should you do? *
2 points
43. What is the coverage you need to achieve with the flock coat? *
2 points
44. What is the procedure to coat fittings? *
2 points
45. What is mandatory; prior to start shooting each zone during 2nd and 3rd coat? *
2 points
46. How long should you wait for 100% epoxy to cure , before the flock-coat? *
2 points
47. What can cause visible coating color and shade variations when installing coating? *
2 points
48. What is the average coating thickness; when completed? *
2 points
49. What is the process to create a slip-resistant finish? *
2 points
50. What do we recommend and advise to put into the pool water when filled? *
2 points
A copy of your responses will be emailed to the address you provided.
Submit
Clear form
Never submit passwords through Google Forms.
reCAPTCHA
This content is neither created nor endorsed by Google. - Terms of Service - Privacy Policy

Does this form look suspicious? Report