Estimating and Costing
Part -01
Sign in to Google to save your progress. Learn more
Q.If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
2 points
Clear selection
Q.The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as
2 points
Clear selection
Q.The main factor to be considered while preparing a detailed estimate, is
2 points
Clear selection
Q.The brick work is not measured in cu m in case of
2 points
Clear selection
Q.The measurement is made in square metre in case of
2 points
Clear selection
Q.The rate of payment is made for 100 cu m (per % cu m) in case of
2 points
Clear selection
Q.The plinth area of a building not includes
2 points
Clear selection
Q.In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
2 points
Clear selection
Q.The assumption on which the trapezoidal formula for volumes is based, is
2 points
Clear selection
Q.The rate of an item of work depends on
2 points
Clear selection
Q.The cross-sections for a highway is taken at
2 points
Clear selection
Q.The measurement is not made in square metres in case of
2 points
Clear selection
Q.The following item of earth work is not measured separately.
2 points
Clear selection
Q.A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
2 points
Clear selection
Q.According to Indian Standards Institute, the actual size of modular bricks is
2 points
Clear selection
Q.The area is measured correct to the nearest
2 points
Clear selection
Q.Pick up the incorrect statement from the following:
2 points
Clear selection
Q.Brick walls are measured in sq. m if the thickness of the wall is
2 points
Clear selection
Q.While estimating the qualities for the construction of a building, the correct metric unit is
2 points
Clear selection
Q.The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
2 points
Clear selection
Submit
Clear form
This content is neither created nor endorsed by Google.