Request edit access
Marc Basnight Bridge – Innovation, Economy, and Durability in a Challenging Environment
Quiz for recorded webinar PDH issuance.
Sign in to Google to save your progress. Learn more
What is the name of the presenter(s)? *
10 points
Required
What was the overall length of the bridge? *
10 points
Required
What material was used extensively in the bridge design? *
10 points
Required
When did the original bridge get hit by a dredge and have 6 spans collapse? *
10 points
Required
Segment epoxy was applied to faces of both segments to be joined. *
10 points
Required
What material was used as reinforcement in the navigation spans? *
10 points
Required
Who are the primary landowners of the bridge location? (2 answers) *
10 points
Required
When was the new bridge officially open to traffic? *
10 points
Required
How many scour regions were there? *
10 points
Required
You can still fish off of the old bridge.
10 points
Clear selection
If interested in a PDH certificate, please provide your license number below.
Submit
Clear form
Never submit passwords through Google Forms.
This form was created inside of North Carolina Society of Engineers.

Does this form look suspicious? Report