Request edit access
APANT | Formulário de resposta à NPA 2017 (A) e (B) da EASA
Bem-vindo à ferramenta de resposta da APANT à NPA 2017-05 (A) e (B) da EASA

NOTAS:
- As respostas devem ser enviadas em Inglês.
- Os comentários devem conter: A nova redação proposta e a respetiva justificação.
- Caso pretenda anexar ficheiros (.bmp, .png, .jpg, .jpeg, .gif, .tif, .tiff, .pdf) envie-os para geral@apant.pt, indicando o(s) ponto(s) a que se refere(m).
- A data limite para resposta é 5 de setembro de 2017.

Poderá encontrar as NPA nas seguintes ligações:
(A): https://www.easa.europa.eu/system/files/dfu/NPA%202017-05%20%28A%29_0.pdf
(B): https://www.easa.europa.eu/system/files/dfu/NPA%202017-05%20%28B%29.pdf

Email address
EASA NPA 2017-05 (A)
A secção 1 desta ferramenta corresponde à EASA NPA 2017-05(A) e a secção 2 à EASA NPA 2017-05 (B).
General Comments
Your answer
Page 1 | Executive Summary
Your answer
Page 1| Applicability and timelines
Your answer
Page 2 | Table of contents
Your answer
Pages 3 | 1. About this NPA
Your answer
Pages 4-6 | 2. In summary — why and what
Your answer
Pages 6-9 | 2.3. How we want to achieve it — overview of the proposals
Your answer
Pages 9-20 | 2.3.1.5 Model aircraft — 2.3.1.6 Boundaries of the open, specific, and certified category — 2.3.1.7 Third-country UAS operators — 2.3.1.8 Registration — 2.3.1.9 Link with the U-Space — 2.3.1.10 Applicability — 2.3.2 Open-category issues — 2.3.3 Specific-category issues — 2.4. What are the expected benefits and drawbacks
Your answer
Pages 21-23 | 3. Proposed draft rules — 3.1. Draft regulation (Draft EASA opinion) — 3.1.1 Draft cover regulation
Your answer
Page 23 | 3.1.1 Draft cover regulation — Article 1
Your answer
Pages 24-26 | 3.1.1 Draft cover regulation — Article 2
Your answer
Pages 26-27 | 3.1.1 Draft cover regulation — Article 3
Your answer
Page 27 | 3.1.1 Draft cover regulation — Article 4
Your answer
Page 27 | 3.1.1 Draft cover regulation — Article 5
Your answer
Page 28 | 3.1.1 Draft cover regulation — Article 6
Your answer
Pages 28-29 | 3.1.1 Draft cover regulation — Article 7
Your answer
Page 29 | 3.1.1 Draft cover regulation — Article 8
Your answer
Page 29 | 3.1.1 Draft cover regulation — Article 9
Your answer
Page 30 | 3.1.1 Draft cover regulation — Article 10
Your answer
Pages 30-31 | 3.1.1 Draft cover regulation — Article 11
Your answer
Page 31 | 3.1.1 Draft cover regulation — Article 12
Your answer
Page 31 | 3.1.1 Draft cover regulation — Article 13
Your answer
Page 32 | 3.1.1 Draft cover regulation — Article 14
Your answer
Pages 32-33 | 3.1.1 Draft cover regulation — Article 15
Your answer
Page 33 | 3.1.1 Draft cover regulation — Article 16
Your answer
Page 34 | 3.1.2. Part-UAS — ANNEX I — UAS operations in the open and specific category
Your answer
Page 35 | SUBPART A — OPEN CATEGORY — UAS.OPEN.10 Responsibilities of the UAS operator
Your answer
Pages 35-36 | UAS.OPEN.20 Registration
Your answer
Pages 36-37 | UAS.OPEN.30 Requirements applicable to all UAS operations in the open category
Your answer
Page 37 | UAS.OPEN.35 Maximum height of UAS operations in the open category
Your answer
Pages 37-38 | UAS.OPEN.40 Requirements applicable to UAS operations in Subcategory A1
Your answer
Page 38 | UAS.OPEN.40 Requirements applicable to UAS operations in Subcategory A2
Your answer
Pages 38-39 | UAS.OPEN.40 Requirements applicable to UAS operations in Subcategory A3
Your answer
Page 39 | UAS.OPEN.70 Duration and validity of remote pilot competence
Your answer
Page 40 | SUBPART B — SPECIFIC CATEGORY — UAS.SPEC.10 Responsibilities of the UAS operator
Your answer
Pages 40-41 | UAS.SPEC.15 Responsibilities of model clubs and associations
Your answer
Page 41 | UAS.SPEC.20 Registration
Your answer
Pages 41-42 | UAS.SPEC.30 Requirements applicable to all UAS operations in the specific category
Your answer
Pages 42-43 | UAS.SPEC.40 Operational risk assessment
Your answer
Page 43 | UAS.SPEC.50 Operational declaration
Your answer
Pages 43-44 | UAS.SPEC.60 Application for an operational authorisation
Your answer
Page 44 | UAS.SPEC.70 Operations manual
Your answer
Pages 44-45 | UAS.SPEC.80 Issuing an operational authorisation
Your answer
Page 45 | UAS.SPEC.90 Duration and validity of the operational authorisation
Your answer
Page 45 | UAS.SPEC.100 Access
Your answer
Page 45 | UAS.SPEC.110 Use of certified equipment and certified UA
Your answer
Page 46 | SUBPART C — LIGHT UAS OPERATOR CERTIFICATE (LUC) — UAS.LUC.10 Responsibility of a LUC holder
Your answer
Page 46 | UAS.LUC.20 Application for a LUC
Your answer
Pages 46-47 | UAS.LUC.30 Management system
Your answer
Page 47 | UAS.LUC.40 LUC manual
Your answer
Page 48 | UAS.LUC.50 Terms of approval of a LUC holder
Your answer
Page 48 | UAS.LUC.60 Privileges of a LUC holder
Your answer
Page 48 | UAS.LUC.70 Changes in the LUC management system
Your answer
Page 48 | UAS.LUC.80 Transferability
Your answer
Page 48 | UAS.LUC.90 Duration and validity of a LUC
Your answer
Page 48 | UAS.LUC.100 Access
Your answer
Pages 49-50 | APPENDICES — Appendix I.1
Your answer
Pages 51-52 | Appendix I.2
Your answer
Pages 53-54 | Appendix I.3
Your answer
Page 55 | Appendix I.4
Your answer
Page 56 | Appendix I.5
Your answer
Page 57 | Appendix I.6
Your answer
Pag 58-60 | Part-MRK — ANNEX II — Making available on the market — SECTION 1 — GENERAL PROVISIONS
Your answer
Pages 61-65 | SECTION 2 — OBLIGATIONS OF ECONOMIC OPERATORS
Your answer
Pages 66-68 | SECTION 3 — CONFORMITY OF THE PRODUCT
Your answer
Pages 69-75 | SECTION 4 — NOTIFICATION OF CONFORMITY ASSESSMENT BODIES
Your answer
Pages 76-79 | SECTION 5 — UNION MARKET SURVEILLANCE, CONTROL OF ELECTRICAL EQUIPMENT ENTERING THE UNION MARKET AND UNION SAFEGUARD PROCEDURES
Your answer
Page 80 | SECTION 6 — FINAL AND TRANSITIONAL PROVISIONS
Your answer
Page 81 | Appendix II.1
Your answer
Pages 82-84 | Appendix II.2
Your answer
Pages 85-88 | Appendix II.3
Your answer
Page 89 | Appendix II.4
Your answer
Page 90 | Appendix II.5
Your answer
Page 91 | Appendix II.6
Your answer
Page 92 | 3.2. Draft acceptable means of compliance and guidance material (Draft EASA decision) — AMC/GM to the draft cover regulation — GM1 Article 2(1)(d) Definition of 'autonomous operation'
Your answer
Page 92 | GM1 Article 3 Responsibilities of the unmanned aircraft system (UAS) operator and remote pilot
Your answer
Page 92 | GM1 Article 6 Designation of the competent authority
Your answer
Page 92 | AMC1 Article 7 Oversight
Your answer
Page 93 | AMC2 Article 7 Oversight programme
Your answer
Page 93 | AMC3 Article 7 Oversight programme — audit and inspection
Your answer
Pages 93-94 | AMC4 Article 7 Oversight programme — follow-up
Your answer
Page 94 | GM Article 7 Oversight programme — audit and inspection
Your answer
Page 94 | GM1 Article 9 Exchange of safety information
Your answer
Pages 94-95 | GM1 Article12 Airspace areas or special zones for UAS operations
Your answer
Page 95 | AMC1 Article 12 Information on airspace areas and special zones for UAS operations
Your answer
Page 95 | GM1 Article 14 Hobbyist flights
Your answer
Page 95 | GM1 Article 15 Recognition of competences demonstrated before the applicability date
Your answer
Page 96 | 3.2.2 AMC to Part-UAS — SUBPARTA — Open category — AMC1 UAS.OPEN.10(a) Policy and procedures
Your answer
Page 96 | AMC1 UAS.OPEN.10(b) Physical and mental condition
Your answer
Page 96 | GM1 UAS.OPEN.10(c) EU declaration of conformity
Your answer
Pages 96-97 | AMC1 UAS.OPEN.20(a) Registration form
Your answer
Page 97 | GM1 UAS.OPEN.20(b)&(c) Registration
Your answer
Page 97 | AMC1 UAS.OPEN.20(e) Display of registration information
Your answer
Page 97 | AMC1 UAS.OPEN.20(f) Renewal of registration
Your answer
Pages 97-98 | AMC1 UAS.OPEN.30(a)(1) Ability to take control of the UA
Your answer
Page 98 | AMC1 UAS.OPEN.30(b)(1) Obtaining updated information about any flight restrictions or conditions published by the Member State
Your answer
Page 98 | AMC1 UAS.OPEN.30(b)(2) Operating environment
Your answer
Page 98-99 | AMC1 UAS.OPEN.30(b)(3) Ensuring that the UAS is in a safe condition to complete the intended flight
Your answer
Page 99 | AMC1 UAS.OPEN.30(c)(2) Ensuring the safe operation of the UA
Your answer
Page 99 | AMC1 UAS.OPEN.30(c)(6) Operations in first-person view (FPV)
Your answer
Page 99 | GM1 UAS.OPEN.30(c)(7) Dangerous goods
Your answer
Page 99 | AMC1 UAS.OPEN.30(c)(8) Emergency response effort
Your answer
Page 99 | GM1 UAS.OPEN.30(c)(9) Respect of other people’s fundamental rights
Your answer
Page 100 | AMC1 UAS.OPEN.40(a)(2)&(3) and UAS.OPEN.50(b) Modification of a UAS with a CE Class mark
Your answer
Page 100 | AMC1 UAS.OPEN.40(b)(1) Operational limitations
Your answer
Pages 100-101 | AMC1 UAS.OPEN.40(b)(5)(i) and UAS.OPEN.60(e)(1) Basic competence of the remote pilot to operate in Subcategory A1 and A3
Your answer
Page 101 | AMC1 UAS.OPEN.50(e)(1) Competences required for the remote pilot to obtain the certificate of competence
Your answer
Page 101-102 | GM1 UAS.OPEN.50(e)(1) Competences required for the remote pilot to obtain the certificate of competence
Your answer
Page 102 | GM1 UAS.OPEN.50(b) and UAS.OPEN.60(b) Uninvolved persons
Your answer
Page 103 | AMC1 UAS.OPEN.50(b) and UAS.OPEN.60(b) Uninvolved persons
Your answer
Page 103 | AMC1 UAS.OPEN.60(b) Operations in Subcategory A3
Your answer
Page 104 | AMC1 UAS.OPEN.70(a) Renewal of basic competence
Your answer
Page 104 | AMC1 UAS.OPEN.70(b) Renewal of certificate of competence
Your answer
Page 105 | SUBPART B — Specific category — AMC1 UAS.SPEC.10(a) Policy and procedures
Your answer
Page 105 | AMC1 UAS.SPEC.10(b) Physical and mental condition
Your answer
Page 105 | AMC1 UAS.SPEC.10(d) Logging of flight activities and record-keeping
Your answer
Page 105 | AMC1 UAS.SPEC.15(c) Action in case of operations/flights exceeding the conditions and limitations defined in the operational authorisation
Your answer
Page 106 | AMC1 UAS.SPEC.20 Registration of model aircraft
Your answer
Page 106 | AMC1 UAS.SPEC.20(a)(1) Registration form
Your answer
Page 106 | AMC1 UAS.SPEC.20(a)(3) Display of registration information
Your answer
Page 106 | AMC1 UAS.SPEC.20(b) Renewal of registration
Your answer
Page 106 | AMC1 UAS.SPEC.30(b)(1) Obtaining updated information about any flight restrictions or conditions published by the Member State
Your answer
Page 106 | AMC1 AS.SPEC.30(b)(2) Operating environment
Your answer
Pages 106-107 | AMC1 UAS.SPEC.30(b)(3) Ensuring that the UAS is in a safe condition to complete the intended flight
Your answer
Page 107 | AMC1 UAS.SPEC.30(c)(2) Ensuring the safe operation of the UA
Your answer
Page 107 | AMC1 UAS.SPEC.30(c)(5) Emergency response effort
Your answer
Page 107 | GM1 UAS.SPEC.30 Level of autonomy and guidelines for human-autonomy interaction
Your answer
Page 107 | GM1 UAS.SPEC.30(c)(6) Respect of other people’s fundamental rights
Your answer
Page 108 | AMC1 UAS.SPEC.40 Operational risk assessment
Your answer
Page 108 | GM1 UAS.SPEC.40 Standard scenarios
Your answer
Page 108 | AMC1 UAS.SPEC.50(a) Operational-declaration form
Your answer
Page 109 | AMC2 UAS.SPEC.50(a) Standard scenario involving an operational declaration
Your answer
Page 109 | GM1 UAS.SPEC.50(c) Operations conducted in a Member State other that the Member State of registration
Your answer
Page 109 | GM1 UAS.SPEC.50(e) Significant changes to the operational declaration
Your answer
Pages 109-110 | UAS.SPEC.60(a) Operational-authorisation application form
Your answer
Page 110 | GM1 UAS.SPEC.60(a) Application for an operational authorisation
Your answer
Page 110 | AMC1 UAS.SPEC.60(a)(1) Standard scenario requiring an operational authorisation
Your answer
Page 110 | AMC1 UAS.SPEC.60(c) Significant changes to the operational authorisation
Your answer
Page 110 | AMC1 UAS.SPEC.70 Operations manual — minimum information
Your answer
Page 110 | AMC1 UAS.SPEC.80 Operational-authorisation form
Your answer
Page 110-111 | GM1 UAS.SPEC.80 Recognition of an operational authorisation between EU Member States
Your answer
Page 112 | SUBPART C — LIGHT UAS OPERATOR CERTIFICATE (LUC) — AMC1 UAS.LUC.20 Application for a LUC
Your answer
Page 112 | AMC1 UAS.LUC.30(a) Management system
Your answer
Page 112 | AMC1 UAS.LUC.30(b)(1) Management system
Your answer
Page 113 | GM1 UAS.LUC.30(b)(1) Management system
Your answer
Page 113 | AMC1 UAS.LUC.30(b)(2) Management system
Your answer
Pages 113-114 | AMC2 UAS.LUC.30(b)(2) Management system
Your answer
Pages 114-115 | AMC1 UAS.LUC.30(b)(3) Management system
Your answer
Page 115 | GM1 UAS.LUC.30(b)(3) Management system
Your answer
Page 115 | AMC1 UAS.LUC.30(b)(4) Management system
Your answer
Page 116 | GM1 UAS.LUC.30(b)(4) Management system
Your answer
Page 116 | AMC1 UAS.LUC.30(b)(5) Use of subcontractors
Your answer
Page 116 | AMC1 UAS.LUC.30(c) Management system
Your answer
Page 117 | AMC2 UAS.LUC.30(c) Management system
Your answer
Page 117 | AMC3 UAS.LUC.30(c) Management system
Your answer
Pages 117-118 | GM1 UAS.LUC.30(c) Management system
Your answer
Page 118 | AMC1 UAS.LUC.40 LUC Manual
Your answer
Page 118 | AMC2 UAS.LUC.40 Procedures for subcontractors
Your answer
Page 118 | AMC1 UAS.LUC.50 LUC approval form
Your answer
Page 118 | GM1 UAS.LUC.60 Privileges
Your answer
Page 118 | AMC1 UAS.LUC.70(b) Significant changes in the LUC management system
Your answer
Page 119 | Appendix I.1
Your answer
Page 120 | Appendix I.2
Your answer
Page 121 | Appendix I.3
Your answer
Page 122 | Appendix I.4
Your answer
Page 123 | Appendix I.5
Your answer
Page 124 | 4. Impact assessment (IA)
Your answer
Page 125 | 5. Proposed action to support implementation
Your answer
Page 126 | 6. References
Your answer
Pages 127-128 | 7. Appendix
Your answer
Next
Never submit passwords through Google Forms.
This form was created inside of APANT. Report Abuse - Terms of Service - Additional Terms