School was built
1995
Average Age of Buildings (weighted by square footage)
22
Major Projects Completed (Since 2000) Includes:
* Physically Repair Building
* Chiller Replacement 2 of 3
* Chiller #3 Replacement 1 of 3
* Partial Roof Replacement Buildings 6 & 9
* Re-Roof Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9
* Maintenance & Repair at various sites ($1.8 M)
TOTAL SPENT (Since 2000):  $4,493,584.20 ($4.5 M)
Capital Outlay Considerations Proposed by ACPS Facilities
Building numbers DO NOT indicate priority of proposed projects. The building numbers are assigned by the Florida Department of Education.
Renovate Building #7 (Classrooms) - Rooms 5 & 40 for better utilization
HVAC Controls
Fix Sidewalks
New Intercom System
Covered Walkway for the Portables
Possible New Classroom Building
Renovate all Restrooms in Buildings #3, #4, #6, #9
Resurface Track and Basketball Court
New Auditorium
Add Electrical Outlets in Gym
Acoustics in Cafeteria