Request edit access
EVmatch's CEC Grant Program for Electric Vehicle Charging Stations
Thank you for your interest in receiving grants for electric vehicle (EV) charging stations and installation services supported by the California Energy Commission. Please complete this form (10-20 minutes) so we can assess the details of your project and determine your eligibility. For more information about the program, check out this article: https://blog.evmatch.com/grants-for-free-ev-charging-stations-at-multifamily-properties/
Sign in to Google to save your progress. Learn more
Condo/Apartment Complex Name *
Full Property Address (Street, City, Zip Code) *
Property County *
Property Contact Name *
Contact Title *
Contact Phone Number *
Contact Email Address *
Property Owner's Legal Name (make sure this is accurate/no typos) *
Property owner's full business address  (Street, City, Zip Code) *
Property owner's mailing address (if different from above)
Organization type
*
Land and building designation info
*
Yes
No
Is the site located on tribal land?
Is the site affordable housing?
Number of housing units *
Type of Property (apartment, condo, etc.) *
Year building was constructed *
Who is your electricity provider? *
What is your electric utility account number?
Total number of parking stalls on property
*
Based on your answer in the previous question, what is the maximum number of shared/guest parking spaces you are able to dedicate to EV charging only? *
Is there an existing need for EV chargers at the site? Check all that apply.
*
Required
Do you have any EV chargers installed on your property today? *
Based on your answer to the previous question, how many chargers do you currently have installed? *
Do you  know if you have capacity on the building's common electrical panel for 4-6 (240V/32A) EV charging stations? Each charger requires a minimum 40-amp circuit breaker. *
Based on your answer in the previous question, what is the maximum number of 32A chargers your building can support (each charger requires 40A dedicated circuit)? Please mark any number that applies, including zero (0). *
Does your complex have common-building WiFi capable of reaching the site where chargers would be installed?  Note - A WiFi repeater can be installed to extend the range of a current network signal. *
Do you currently have one or more residents who drive a plug-in electric vehicle? *
If yes to the previous question, how many residents drive electric vehicles in your building? *
Public accessibility to charging stations is required under this grant program. Are you willing to make your EV charging stations available to the public during some or all hours? Site host may collect payments for public charging access through EVmatch software. *
What pricing structure would you prefer to charge drivers for use of charging stations? (Select all that apply) *
Required
If you will provide public access, during what hours can drivers from the public use your chargers? *
Required
Depending on installation costs, some projects may require out-of-pocket contributions from the applicant in order to move forward. What is your estimated budget for contributing out-of-pocket? (Note: this does not lock you into making any specific payments.) *
Required
Comments or Questions
Submit
Clear form
Never submit passwords through Google Forms.
This form was created inside of EVmatch. Report Abuse