Inspection and testing 2391/5357 Mock paper 3
Use this mock to test your skills before your exams!!!
Sign in to Google to save your progress. Learn more
1) What is the purpose of an Initial Verification? *
1 point
2) Which non-statutory document contains specific detail relating to the methods of testing during an Initial Verification? *
1 point
3) What information must an inspector have, which relates to diagrams, charts or tables? *
1 point
4) What is the main purpose of a risk assessment, carried out by the inspector, when verifying electrical systems? *
1 point
5) How is the risk of the inspector receiving an electric shock minimised whilst working on an isolated circuit? *
1 point
6) What is the level of risk if a Main Protective Bonding Conductor, to a metallic water pipe, is disconnected from the MET when the supply is not isolated? *
1 point
7) Why is the inspection carried out before any testing? *
1 point
8) What would be inspected when the Basic Protection by barriers and enclosures is being verified on a three-phase distribution board? *
1 point
9) What would be verified by inspection where Additional Protection is provided on a circuit concealed in walls at a depth less than 50 mm? *
1 point
10) What would be verified using the human sense of sight? *
1 point
Submit