During the project’s discovery phase, the consulting team reviewed and considered existing conditions in nine areas (existing buildings, stormwater runoff, typology, existing infrastructure, floodplain, archeology, transit, greenway connections and zoning). As we move forward, what other areas of discovery analysis, if any, should be considered?