GreenPoint Rated Public Comment Form - 30 Day Comment Period

Build It Green has completed the first draft of the GreenPoint Rated Manuals for Version 6.0 along with our stakeholder outreach for the Update Process. As a result of those efforts, Build It Green has completed a draft manual for New Home and Existing Home along with a draft checklist for each rating system has to correspond with the 2013 California Green Building and Energy draft codes. These documents are currently available for public comment. Please use this form to comment on the first draft of GreenPoint Rated version 6 checklists for New Home Single Family and Multifamily and Existing Home Single Family and Multifamily and the New Home and Existing Home Manuals. Please use one form per measure. All fields must be completed. Anonymous comments will not be considered.

    Information About the Requestor:

    This is a required question
    This is a required question
    This is a required question
    This is a required question
    This is a required question

    Comment Relate to the Following Standard(s) (please check all that apply):

    This is a required question

    This request is to:

    This is a required question

    General Program Comments

    This is a required question

    GreenPoint Rated Measure:

    This is a required question
    This is a required question

    Comment or Suggested Modification

    This is a required question

    Justification/Benefit of Proposed Change:

    This is a required question