Request edit access
Installer Certification Test
Thank you for your interest in installing the PowerPod! This test is designed for experienced installers (PV, Electrical licensed businesses) who are interested in including the PowerPod in their customer offering.

Passing this test is compulsory in becoming a Certified Electriq Power installer. Please use the resources given in the installation portal to answer the questions below. Any PowerPod installation must be conducted and/or monitored by a certified individual who will then sign off on each project for the product warranty to go into effect. Failure to observe this requirement will result in voided product warranty. Certification is obtained on an individual basis.

There is no time limit on this test and it will take approximately 30 minutes to complete. 100% is required to pass and you can retake the test as many times as needed. After passing, a confirmation email will be sent and the Electriq team will contact you in 3-5 calendar days with the next steps.
Email *
Name (First & Last) *
Phone Number *
Company Name *
What is the max solar input (kw) per inverter? *
1 point
What is the battery nominal voltage of the PowerPod? *
1 point
It is okay to allow the customer to repair or replace any component in the PowerPod. *
1 point
When should personal protective equipment (PPE) be used in conjunction with an Electriq product? *
1 point
What is the maximum elevation above sea level for which it is safe to install the PowerPod? *
1 point
During operation, storage or transport, what ambient temperature range is acceptable? *
1 point
The DC Power should be disconnected from the photovoltaic system before installing, repairing or troubleshooting an Electriq product.
1 point
Clear selection
Which best describes the standard PowerPod infrastructure? *
1 point
When integrating a generator with PowerPod, what type of generator should you use? *
1 point
For the DC-coupled PowerPod, what product CAN'T you use to meet rapid shutdown requirement? *
1 point
If the batteries needs to be serviced, when should the battery be disassembled? *
1 point
During use, storage and transport, keep the Inverter: (Select all that apply) *
1 point
Required
What size wire is provided in the ship with kit to connect the batteries to the inverter? *
1 point
When installing the batteries, how much clearance is needed? *
1 point
Which orientation must the batteries be installed? *
1 point
What is the maximum amount of battery packs that can fit in one (1) PowerPod battery enclosure? *
1 point
Select the correct solar string sizing specs. *
1 point
What is the maximum Amps available on the essential load panel? *
1 point
What is the size of grid connection breaker on the PowerPod? *
1 point
What is the maximum number of DC-coupled PowerPods that can be stacked together and the max backup load output in amps? *
1 point
Where are the DC Coupled connections made? *
1 point
How should the essential load terminals be wired? *
1 point
Which input does the battery communication wire connect to in the inverter? *
1 point
Which connections are required for the PowerHub? *
1 point
At what temperature must conductors be rated at? *
1 point
When wiring the batteries, which battery is the Master (M) and which are the Slaves (s)? *
1 point
What will the essential loads output supply to? *
1 point
Where does the RS485 connection from the inverter go to in the master battery pack? *
1 point
How do you know that the battery communications are working? *
1 point
How do you commission the PowerPod? *
1 point
In the inverter screen where you set the time, what battery type should be set? *
1 point
Before powering up your system for the first time, what system checks need to be completed? (Select all that apply) *
1 point
Required
Submit
Never submit passwords through Google Forms.
This form was created inside of Electriq Power, Inc.. Report Abuse