JavaScript isn't enabled in your browser, so this file can't be opened. Enable and reload.
PIT SOP Training Questionnaire
* Indicates required question
Email
*
Record my email address with my response
Name of Test Taker
*
Your answer
What should be chipped off before the test?
*
10 points
Loose Concrete
Screws
Paint
How should the steel reinforcement be at the site of the test?
*
10 points
Straight
Intersecting
Bent
What has to be obtained from site before the test?
*
10 points
Soil Report only
Pour card and soil report
Pour Card only
How should the test surface layer be?
*
10 points
Smooth
Wet
Rough
How many points should be taken on pile and where?
*
10 points
2 - North, South
5 - Center, North, South, East, West
4 - North, South, East, West
Arrange the following steps in the correct order
*
Choose the option with the correct order
10 points
More than one recording of signals is done until repeatability of signals is average of blows, A small metal/hard rubber hammer is used to produce a light tap on top of the pile, The shock reflected is recorded through transducer in a computer disk
The shock reflected is recorded through transducer in a computer disk, A small metal/hard rubber hammer is used to produce a light tap on top of the pile, More than one recording of signals is done until repeatability of signals is average of blows
A small metal/hard rubber hammer is used to produce a light tap on top of the pile, The shock reflected is recorded through transducer in a computer disk, More than one recording of signals is done until repeatability of signals is average of blows
A copy of your responses will be emailed to .
Submit
Clear form
Never submit passwords through Google Forms.
This form was created inside of Limaye.org.
Does this form look suspicious?
Report
Forms
Help and feedback
Contact form owner
Help Forms improve
Report