Student's use of time coding form

 

Teacher: Shane Jones                                                                                                                        Class:         Lab D                                                                             

Topic:    Reaction Time/ Balance                                                                                                                     Grade: 9-12                                                                               

Date:         11/30/11                                                                                                                                  # of Students:   6                                                                      

Time analysis codes: Decision is based on what 51% of the observed students are doing at the time.

M = Management               Time when most students (over 50%) are not receiving instruction or involved in lesson activity (e.g., changing activities, getting out or putting away equipment, listening to behavior rules or reminder).

A = Activity             Time when most students (over 50%) are involved in physical movement (e.g., catching a ball, throwing at a target, running).

I - Instruction         Time when most students (over 50%) are receiving information about how to move or perform a skill (e.g., how to move using all the space, watching a demonstration, listening to instructions).

W = Waiting            Time when most students (over 50%) are not involved in the other categories (e.g., group activity but only one or two are participating, waiting for a turn, off-task behavior, waiting for the teacher to give directions).

 

 

I I I A A A A A A A A A A A A A A A A A A A A I M M I I I I I I I I I A A I I I I I I W W W W W W A A A A A A A A A A A A A A A A W I I A A A A A A A A A A I I I I I I W A A A A A A A A A A A I I I W A A A A A A A A A A A A A W W I I I I A A A A A A A A A A I I I I I I I I W A A A A A A A A A A A

 

Percent of M time =                                               20        ÷    1490  = 1 %           

                    TOTAL M seconds 20       TOTAL LESSON seconds 1490

 

Percent of A time =                             930 ÷    1490  =   62  %      

                    TOTAL A seconds 930        TOTAL LESSON seconds   1490

 

Percent of I time =              420   ÷    1490  = 28 %           

                    TOTAL I seconds 420           TOTAL LESSON seconds 1490

 

Percent of W time =           120        ÷        1490   =  8 %           

                    TOTAL W seconds 120   TOTAL LESSON seconds 1490

 

Grade:

 Management < 15% = 1 pt.

 Activity > 50% = 2 pts.

 Instruction < 30% = 1 pt.

 Waiting < 5% = 1 pt.                                                                                                           Total Score (M+A+I+W)= 5 pts