Last Updated: 11/30/12 4:44 pm

Volunteers (confirmed)

Steve St Laurent, Jan Pierce, Dave Smith, Glenn Flake, Pam Giles, Kathy Werner

Archie Davis, Clint Thomas, Donna Gordy, Glenn & June Werner, James Stephens

Joe Thogmartin, Thomas Caldwell, Tim Banks (Park Mgr)

Volunteers (facebook event listing, unconfirmed attendance)

Sarah Pitts, Julie Hoss, Stephanie Johnson, Lisa Stigall, Ansley Byrd

ALSO ON-THE-GROUND

Muddy Spokes Trail Blazers, not sure how many

TOOLS NEEDED

WHEELBARROWS

Hammers

Wheelbarrows

Picks, mattocks, shovels

Steel garden rakes, hoes

Swing blades

Gas-powered trimmers with super-duty string or brush blades

Machetes (always... never leave home without it)

TRANSPORTATION

For travel to the north end, Base 1 and Base 2, a pickup or SUV with decent ground clearance and a desire to get a little dirty is recommended.

TASKS        EMAIL friendsofchattahoocheebend@gmail.com with your choice.

Task

Location

Volunteers

Blazing
(Hammers, aluminum nails, white blazes)

Bend Trail, southbound from Base 1 to Scout Picnic Spur

-

-

Blazing
(Hammers, aluminum nails, white blazes)

Bend Trail, southbound from north end of trail to Base 1

- Glenn Flake

-

Creek crossing work: lay large flat stones from construction in stream bed
(Stones, wheelbarrows)

“Bridge 6” - access from Base 2

-

-

-

Creek crossing work: will probably be a trail reroute
(Picks, shovels, possibly stones)

“Bridge 5” - access from Base 2

- Steve

-

-

Trail reclamation: re-clear 6-foot-wide corridor through tall, dense grasses and briars
(Swing blades, rakes, gas-powered trimmers with blades or super-duty string)

“Adirondack Ridge” - access from Trail Head 2

-

-

-

Lunch!

?? Pavilion ??

- Pam

- Joe

Discuss: Trail reroute and construction

Bobwhite Way, west of maintenance building

Tim

Discuss: Trail outlining/landscaping

Visitor’s Center / Trail Head 2

Tim