Shepard Next Steps 09-20-12

Attending:

J, Jeremy, Ethan, Juli, Charlie

  1. ACTION - J to get OHS poster printed and get it shipped along with Shepard.
  2. ACTION - Jeremy and J to set up hangout with Ethan about strain gauge instead of current FSR.
  3. ACTION - Jeremy and J - Finish 4 documentation items above for OHS if possible.
  1. Jeremy is working on a schematic diagram of the DAQ circuitry.
  2. Jeremy is going to shift to CAD next to create drawings for the mechanical structure.
  3. Jeremy/J - Transfer operating procedures into wiki.
  4. Jeremy/J - Write safety document.
  1. ACTION - J and (some) Jeremy - Get the video ready for OHS.