Student's use of time coding form

Teacher: Sara Woodward                Class: EDU 255

Topic: Ice Skating: Falling                Grade:                                                 

Date: 10/26/11                # of Students: 22

Time analysis codes: Decision is based on what 51% of the observed students are doing at the time.

M = Management

Time when most students (over 50%) are not receiving instruction or involved in lesson activity (e.g., changing activities, getting out or putting away equipment, listening to behavior rules or reminder).

A = Activity

Time when most students (over 50%) are involved in physical movement (e.g., catching a ball, throwing at a target, running).

I - Instruction

Time when most students (over 50%) are receiving information about how to move or perform a skill (e.g., how to move using all the space, watching a demonstration, listening to instructions).

W = Waiting

Time when most students (over 50%) are not involved in the other categories (e.g., group activity but only one or two are participating, waiting for a turn, off-task behavior, waiting for the teacher to give directions).

Percent of M time =                         100                    ÷            840                   =         12          %      

        TOTAL M seconds         TOTAL LESSON seconds

Percent of A time =                         440                    ÷            840           =

10

20

30

40

50

1 m

10

20

30

40

50

2 m

10

20

30

40

50

3 m

10

20

30

40

50

4 m

10

20

30

40

50

5 m

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

W

I

I

I

I

I

I

I

I

I

I

A

I

A

A

10

20

30

40

50

6 m

10

20

30

40

50

7 m

10

20

30

40

50

8 m

10

20

30

40

50

9 m

10

20

30

40

50

10 m

I

I

A

A

A

I

I

A

A

A

W

I

I

I

I

A

A

A

A

A

A

I

 M

M

M

M

M

I

A

A

10

20

30

40

50

11m

10

20

30

40

50

12m

10

20

30

40

50

13m

10

20

30

40

50

14 m

A

M

M

I

A

A

W

I

M

W

A

A

A

A

A

A

A

A

A

M

M

I

I

 I

        52          %      

        TOTAL A seconds         TOTAL LESSON seconds

Percent of I time =                         260                    ÷             840           =         31          %      

        TOTAL I seconds         TOTAL LESSON seconds

Percent of W time =                         40            ÷                    840           =         5          %      

        TOTAL W seconds         TOTAL LESSON seconds

 

Grade:

 Management < 15% = 1 pt.

 Activity > 50% = 2 pts.

 Instruction < 30% = 1 pt.

 Waiting < 5% = 1 pt.                                                         Total Score (M+A+I+W)=