Student's use of time coding form

Teacher:         Ryan Carpenter                Class:         EDU 255                

Topic: Tchoukball                                Grade:         LAB C                                        

Date:                 10/27/10                                # of Students:         14                                

Time analysis codes: Decision is based on what 51% of the observed students are doing at the time.

M = Management

Time when most students (over 50%) are not receiving instruction or involved in lesson activity (e.g., changing activities, getting out or putting away equipment, listening to behavior rules or reminder).

A = Activity

Time when most students (over 50%) are involved in physical movement (e.g., catching a ball, throwing at a target, running).

I - Instruction

Time when most students (over 50%) are receiving information about how to move or perform a skill (e.g., how to move using all the space, watching a demonstration, listening to instructions).

W = Waiting

Time when most students (over 50%) are not involved in the other categories (e.g., group activity but only one or two are participating, waiting for a turn, off-task behavior, waiting for the teacher to give directions).

    1                               2                                3                                4                               5                               6                                      

 

 

   7                                8                               9                                10                            11                             12                                      

  13                             14                             15                              16                             17                             18                                      

Percent of M time =                         50                    ÷            622           =         8          %      

        TOTAL M seconds         TOTAL LESSON seconds

Percent of A time =                 280                    ÷            622                   =         45          %      

        TOTAL A seconds         TOTAL LESSON seconds

Percent of I time =                 230                            ÷            622                   =         37          %      

        TOTAL I seconds         TOTAL LESSON seconds

Percent of W time =                 20                            ÷            622                   =         3          %      

        TOTAL W seconds         TOTAL LESSON seconds

 

Grade:

 Management < 15% = 1 pt.

 Activity > 50% = 2 pts.

 Instruction < 30% = 1 pt.

 Waiting < 5% = 1 pt.                         Total Score (M+A+I+W)=                 2