Student's use of time coding form

Teacher: Sara Woodwar                                                Class: 255                                                

Topic: Jump Roping                                                        Grade: College                                        

Date: 10/5                                                                # of Students: 20                                        

Time analysis codes: Decision is based on what 51% of the observed students are doing at the time.

M = Management

Time when most students (over 50%) are not receiving instruction or involved in lesson activity (e.g., changing activities, getting out or putting away equipment, listening to behavior rules or reminder).

A = Activity

Time when most students (over 50%) are involved in physical movement (e.g., catching a ball, throwing at a target, running).

I - Instruction

Time when most students (over 50%) are receiving information about how to move or perform a skill (e.g., how to move using all the space, watching a demonstration, listening to instructions).

W = Waiting

Time when most students (over 50%) are not involved in the other categories (e.g., group activity but only one or two are participating, waiting for a turn, off-task behavior, waiting for the teacher to give directions).

                                 

 

I

I

I

I

I

I

A

M

I

I

A

A

A

A

I

I

I

I

A

A

A

M

M

M

I

A

A

A

A

W

W

M

M

                             

Percent of M time =                         60                    ÷                    

        330                   =         19          %      

        TOTAL M seconds         TOTAL LESSON seconds

Percent of A time =                         120                    ÷                            330                   =         36          %      

        TOTAL A seconds         TOTAL LESSON seconds

Percent of I time =                         130                    ÷                            330                   =         39          %      

        TOTAL I seconds         TOTAL LESSON seconds

Percent of W time =                 20                            ÷                            330                   =         6          %      

        TOTAL W seconds         TOTAL LESSON seconds

 

Grade:

 Management < 15% = 1 pt.

 Activity > 50% = 2 pts.

 Instruction < 30% = 1 pt.

 Waiting < 5% = 1 pt.                                                         Total Score (M+A+I+W)=