Student's use of time coding form

Teacher:         Sara Woodward                                                Class: EDU 255

Topic:         Defensive Stance/Basketball                                Grade: Peers

Date:                 9/19/2011                                                        # of Students: 8

Time analysis codes: Decision is based on what 51% of the observed students are doing at the time.

M = Management

Time when most students (over 50%) are not receiving instruction or involved in lesson activity (e.g., changing activities, getting out or putting away equipment, listening to behavior rules or reminder).

A = Activity

Time when most students (over 50%) are involved in physical movement (e.g., catching a ball, throwing at a target, running).

I - Instruction

Time when most students (over 50%) are receiving information about how to move or perform a skill (e.g., how to move using all the space, watching a demonstration, listening to instructions).

W = Waiting

Time when most students (over 50%) are not involved in the other categories (e.g., group activity but only one or two are participating, waiting for a turn, off-task behavior, waiting for the teacher to give directions).

        0                         1                         2                         3                        4                                                                                    

   

 

Percent of M time =                         40                    ÷                    220                           =         18%

W

W

I

I

I

I

I

A

A

I

M

A

A

A

A

W

M

A

A

A

M

M

          %      

        TOTAL M seconds         TOTAL LESSON seconds

Percent of A time =                         90                    ÷                            220                   =         41%          %      

        TOTAL A seconds         TOTAL LESSON seconds

Percent of I time =                         60                    ÷                            220                   =         27%          %      

        TOTAL I seconds         TOTAL LESSON seconds

Percent of W time =                         20                    ÷                            220                   =         9%          %      

        TOTAL W seconds         TOTAL LESSON seconds

 

Grade:

 Management < 15% = 1 pt.

 Activity > 50% = 2 pts.

 Instruction < 30% = 1 pt.

 Waiting < 5% = 1 pt.                                                         Total Score (M+A+I+W)=