Expecting: Andy Allan, Henk Hoff, Harry Wood, Oliver Kühn, Steve Coast, Mikel Maron, Frederik Ramm, Michael Collinson, Sam Larsen
Present: Henk, Michael, Big Steve, Frederik, Mikel, Andy, Harry
Apologies:
January 5th, 2012
Proposed: Michael
Seconded: Andy
Accepted
Board has committed to the planned license change on April 1st 2012. Has stated this to be the most important item for the first quarter. What coordinated actions can be done by all WG’s?
LWG sees the following activities:
Community Rebuild Group: A core group of specific individuals with proven competencies who are willing to actually sit down and write the code, test and execute it. We need to know who they will be.
Already established on the rebuild mailing list and the right discussions are being had.
http://tools.geofabrik.de/osmi/munin.html
Michael: 7M problematic nodes disappeared during January, we are now down to about 30M. At least 10M are nodes that cannot be remapped and must be removed no matter what.
Discussion Postponed
Henk to create the list of which ones are submitted and which ones are missing
Discussion Postponed
(it went well with Night of the Living Maps) should we enshrine it?
Discussion Postponed
Discussion Postponed
Board and OWG are working to clarify division of responsibilities around the sysadmin / rails maintainer roles
Board set guideline that personal blogposts should not be signed with Foundation e-mail address.
Meeting ended 20:40 GMT
Request to change DoW for the meeting, so Matt will be able to join.
- E-mail meeting on Feb 8th on progress of technical aspects of the database rebuilt
- Provisional meeting on Feb 15th on next steps for database rebuilt
- Next regular scheduled meeting:
Wednesday March 7th, 7pm GMT, dial-in
http://www.timeanddate.com/worldclock/fixedtime.html?iso=20120307T19