ENVIRONMENTAL IMPACT ASSESMENT (EIA) REPORT
PROJECT TITLE | CAPACITY | OWNER | LOCATİON | DATE | ||
1 | EIA of Solid Waste Disposal Systems for Hakkari | 400.000 inhabitant | Hakkari Solid Waste Union | HAKKARİ | 2019 | |
2 | EIA Report for Trabzon Solid Waste Gasification, RDF and Landfill Projects | 2.385.911 inhabitant | Trabzon-Rize Solid Waste Union | TRABZON | 2018 | |
3 | EIA Project Information File for Ödemiş Integrated Solid Waste Management System | 339.504 inhabitant | Biosun Ödemiş A.Ş. | Ödemiş İZMİR | 2017 | |
4 | EIA Project Information File of Composting Plant for BİÇAYEV-BİR | 180.000 inhabitant | Biga-Çan-Yenice Environmental Union | Çan ÇANAKKALE | 2017 | |
5 | EIA Project Information File of Solid Waste Disposal Systems for TRABRİ-KAB | 1.020.000 inhabitant | Trabzon-Rize Solid Waste Union | TRABZON | 2017 | |
6 | EIA of Solid Waste Disposal Systems for Ordu | 215.500 inhabitant | Ordu Metropolitan Municipality | ORDU | 2017 | |
7 | Sefaköy – Beylikdüzü Rail System Project | - | İstanbul Metropolitan Municipality | İSTANBUL | 2017 | |
8 | Sultangazi - Arnavutköy Rail System Project | - | İstanbul Metropolitan Municipality | İSTANBUL | 2017 | |
9 | EIA for SİLAHTARAĞA Wsate Water Treatment Plant | - | İstanbul Water and Sewerage Administration | İSTANBUL | 2016 | |
10 | EIA of Solid Waste Disposal Systems for Siverek | 393.700 Nüfus | Şanlıurfa Metropolitan Municipality | ŞANLIURFA | 2016 | |
11 | EIA of Solid Waste Disposal Systems for ÇOKAB | 393.300 Nüfus | Çoruh Basin Solis Waste Union | ERZURUM | 2016 | |
12 | EIA of Waste Water Treatment Plant | 553.000 m3/day | İstanbul Water and Sewerage Administration | İSTANBUL | 2016 | |
13 | Haliç – Kemerburgaz Rail System Project | - | İstanbul Metropolitan Municipality | İSTANBUL | 2016 | |
14 | Sefaköy – Halkalı – Başakşehir Rail System Project | - | İstanbul Metropolitan Municipality | İSTANBUL | 2016 | |
15 | Eminönü – Alibeyköy Rail System Project | - | İstanbul Metropolitan Municipality | İSTANBUL | 2015 | |
16 | Yenikapı - Sefaköy Rail System Project | - | İstanbul Metropolitan Municipality | İSTANBUL | 2015 | |
17 | Vezneciler – Edirnekapı – Eyüp – Gaziosmanpaşa – Sultangazi Rail System Project | - | İstanbul Metropolitan Municipality | İSTANBUL | 2015 | |
18 | Başakşehir-KayaşehirRail System Project | - | IGM Department of Transport | İSTANBUL | 2015 | |
19 | Mogan Lake Buttom Sludge Cleaning Project | - | Ministry of Environment of Urbanisation | ANKARA | 2015 | |
20 | İkitelli – Ataköy Rail System Project | - | IGM Department of Transport | İSTANBUL | 2015 | |
21 | EIA Report for Tissue Paper Production | 70.000 ton/year | AKTUL Paper A.Ş. | PAMUKOVA | 2014 | |
22 | EIA Report for Edirne Sanitary Landfill Project | 210.000 inhabitant | Edirne Solid waste Management Union | EDİRNE | 2014 | |
23 | EIA Report for Troas Sanitary Landfill Project | 190.000 inhabitant | Troas Solid waste Union | AYVACIK | 2012 | |
24 | EIA Report forÇan-Biga Sanitary Landfill Project | 210.000 inhabitant | Çan-Biga Solid waste Union | ÇANAKKALE | 2012 | |
25 | EIA report for Ordu Solid waste Disposal Project | 200.000 inhabitant | Canik Solid waste Union | ORDU | 2012 | |
26 | EIA Report for Bilecik Solid waste Disposal Project | 380.000 inhabitant | Hexagon A.Ş. | BİLECİK | 2012 | |
27 | EIA Report for Tuzla Sea Discharge Project | 1.000.000 inhabitant | ISKI | Tuzla İSTANBUL | 2012 | |
28 | EIA Report for Ardahan waste Disposal Project | 250.000 inhabitant | Ardahan Union of Solid Waste | ARDAHAN | 2012 | |
29 | EIA Report for Söke Integrated Solid waste Disposal Project | 70.000 inhabitant | Kuşadası Integrated Solid Waste Management Industry end COM A.Ş. | AYDIN | 2012 | |
30 | EIA Report for Kadıköy-Kartal-Kaynarca Railway System Project | 25,6 Km | Avrasya Metro Grubu | İSTANBUL | 2010 | |
31 | EIA Report for Tosçelik Harbour-Shipyard | 100 DWT Ship Building 300 DWT Ship Repair and Maintance | Tosyalı Holding A.Ş. | HATAY | 2010 | |
32 | EIA Report for Ordu Hydropower Project | 1105 GWh/ year | Melet Power and Track Firm | ORDU | 2010 | |
33 | EIA Report for Tissue Paper Production and Co-generation | 70.000 ton/year | AK GIDA A.Ş. | PAMUKOVA | 2010 | |
34 | EIA Report for Malatya Solid waste Disposal Project | 750.000 inhabitant | Malatya Municipality | MALATYA | 2010 | |
35 | EIA Report for Muğla Solid waste Disposal Project | 230.000 inhabitant | MuğlaUnion of Solid Waste | MUĞLA | 2010 | |
36 | EIA Report for Giresun Solid waste Disposal Project | 500.000 inhabitant | Giresun Union of Solid-Liqid Waste | GİRESUN | 2010 | |
37 | EIA Report for Pamukova Integrated Solid waste Disposal Project | 60.000 inhabitant | BİOSUN A.Ş. | PAMUKOVA | 2009 | |
38 | EIA Report for Killik Wind Mill Project | 40.5 MW | P.E.M. A.Ş. | TOKAT | 2009 | |
39 | EIA Report for Blue Lagoon ResidenceProject | 204 Houses | Nissa Motors Construction Real Estate Company | İSTANBUL | 2009 | |
40 | EIA Report for Kastamonu Sanitary Landfill Project | 2.372.294 t. Solidwaste 350.000 inhabitant | Municipality | KASTAMONU | 2009 | |
41 | EIA Report for Beşiktaş-Şişli-OtogarRailway System Project | 21.2 Km 17 Station 230.000 Passenger/hr. | IstanbulGreater MunicipalityTransportation Company | İSTANBUL | 2009 | |
42 | EIA Report for Çeşme-OvacıkWind Mill Project | 18 MW | Baltepe Energy A.Ş. | İZMİR | 2009 | |
43 | EIA Report for Seferihisar Wind Mill Project | 16 MW | Aktepe Energy A.Ş. | İZMİR | 2009 | |
44 | EIA Report for Trabzon Light Railway System Project | 5000 Passenger/hr. 7.2 Km 8 Station | IstanbulGreater MunicipalityTransportation Company | TRABZON | 2009 | |
45 | EIA Report for Kayadüzü Wind Mill Project | 39 MW | Baktepe Energy A.Ş. | AMASYA | 2009 | |
46 | EIA Report for Silivri Wind Mill Project | 45 MW | RSH Energy A.Ş. | İSTANBUL | 2009 | |
47 | EIA Report for Susurluk Wind Mill Project | 45 MW | Alentek Energy A.Ş. | BALIKESİR | 2009 | |
48 | EIA Report for Burdur Sanitary Landfill Project | 1.610.000 Ton Solid W. | Union of Municipalities | BURDUR | 2009 | |
49 | EIA Report for Subway Lines between Yenikapı-Bakırköy İncirliveBakırköy İDO - Kirazlı | 274.644 Passenger/day 18 Statiton 24.6 Km | IstanbulGreater MunicipalityTransportation Company | İSTANBUL | 2009 | |
50 | EIA Report for Bakırköy-Beylikdüzü-TüyapLight Railway System | 1.158.526 Passenger/day 18 Statiton 24.6 Km | IstanbulGreater Municipality | İSTANBUL | 2009 | |
51 | EIA Report for the Integrated Plant of Steel Forming | 1.200.000 ton/ year | YolbulanBaştuğ Metal Industry Trade | OSMANİYE | 2009 | |
52 | EIA Report for the Integrated Plant of Steel Forming | 1.500.000 ton/year | TosçelikProfile Industry | OSMANİYE | 2008 | |
53 | EIA Report for (Gemlik+Orhangazi) Wastewater Treatment Plant | 50.000 m3/day | Water and Sewage Works (BUSKİ) | BURSA | 2008 | |
54 | EIA Report for Tekirdağ Wastewater Collector Line | 300.000 m2 Coastal Fill | TekirdağMunicipality | TEKİRDAĞ | 2008 | |
55 | EIA Report for Karabü kSanitary Landfill Project | 200.000 inhabitant | Union of the Solid Waste of Karabük | KARABÜK | 2007 | |
56 | Environmental Impact Assessment Report for Zonguldak Sanitary Landfill Project | 3.600.000 t. Solidwaste 300.000 inhabitant | Union of the Solid Waste ofZonguldak | ZONGULDAK | 2007 | |
57 | EIA Report for Maltepe Rezidans Project | 999 Houses | Uğurİnşaat San. Tic. A.Ş. | Maltepe İSTANBUL | 2007 | |
58 | EIA Report for Yalıköy Wastewater Treatment Plant | 12.498 inhabitant | Water and Sewage Works (İSKİ) | Çatalca İSTANBUL | 2005 | |
59 | EIA Report for Garipçe Wastewater Treatment Plant | 1005 inhabitant | Water and Sewage Works (İSKİ) | Sarıyer İSTANBUL | 2005 | |
60 | EIA Report for Rumelifeneri Wastewater Treatment Plant | 7.646 inhabitant | Water and Sewage Works (İSKİ) | Sarıyer İSTANBUL | 2005 | |
61 | EIA Report for Karaburun Wastewater Treatment Plant | 40.969 inhabitant | Water and Sewage Works (İSKİ) | Çatalca İSTANBUL | 2005 | |
62 | EIA Report for Yozgat Sanitary Landfill Project | 418.000 inhabitant | Municipality | YOZGAT | 2005 | |
63 | EIA Report for Arkeon Houses Project | 301 Houses 10 Social Plant 317 771 m2 | YapıMerkeziİnş. ve A.Ş. | Tepeören/Akfırat Tuzla/İST | 2005 | |
64 | EIA Reportfor Repair-Maintenance and Modification of Aviation Center | 4 Aircraft Repair and Maintenance Hall | Turkish Air Lines | S.GökçenHavalimanıMevkii | 2005 | |
65 | EIA Report for Ereğli Sanitary Landfill Project | 160.000 tonSolidwaste 9900 m2 | Municipality | ZONGULDAK | 2005 | |
66 | EIA Report for Brass Melting and Forming Plant of Uçar Industry | 4.667 m2 | Uçar Sanayi, Ziya UÇAR | Topçular Rami/İST. | 2005 | |
67 | EIA Report for Üsküdar Metro Construction | 3 960 m | Greater Istanbul Transportation Dept. | Üsküdar İSTANBUL | 2004 | |
68 | Environmental Impact Assessment Report for Tepeören Settlement Improvement Plan | 9976 inhabitant 3140 Ha | Orhanli Municipality | Tuzla İSTANBUL | 2003 | |
69 | Environmental Impact Assessment Report for Orhanlı | 14 391 inhabitant (597 ha) | Orhanli Municipality | Tuzla İSTANBUL | 2002 | |
70 | Environmental Impact Assessment Report for Çekmeköy Municipality | 92 904 inhabitant (1 359 ha) | Cekmeköy Municipality | Ümraniye İSTANBUL | 2000 | |
71 | EIA Report for Solid Waste Processing (Composting, Recovery) Plant, | 1000 m3/day | Greater Istanbul Municipality | İSTANBUL | 1996-1997 | |
72 | Environmental Impact Assessment Report for Seferusta Housing Complex | 3820 inhabitant (636 ha) | ÖmerliYapıveTurizm A.Ş. | Paşaköy-Pendik İSTANBUL | 1996 | |