[S&I Framework Newsletter]
April 5, 2011
Coordinator’s Introduction “The initiatives have been making fantastic progress. The CDA Consolidation project is ready to ballot on a set of substantially clearer and more consistent revisions to key CDA common templates; the Transitions of Care and Lab Results Initiatives are completing user story and use case work and are proceeding into getting concrete with applying real-world standards to those use cases. With just the work currently underway, we are on track to make substantial improvements to the US healthcare delivery system. Imagine a world where all providers receive electronic laboratory results and coordinate all care transitions with high quality, actionable, meaningful data --- this is the world you are all making possible.” -Arien Malec Coordinator, S&I Framework
S&I Framework in the blogosphere and on Twitter!
• Read the S&I Framework blog at http://siframework.typepad.com.
• Follow us @siframework on Twitter. Use the #siframework hashtag in your tweets and to see what others are saying.
CDA Consolidation Project Consolidation Project Timeline
• 4/4: Review draft of publication, ballot submission review
• 4/8: HL7 Ballot Submission
3/29 Harmonization Workgroup Meeting
• The comment period for Harmonization Analysis concluded on 3/28, although the HL7 ballot process provides a 30-day period to solicit further comments on the consolidated IG for ballot
• The Harmonization analysis is available for review on the Wiki
3/30 Documentation Workgroup Meeting
• The Documentation WG discussed the tabular format for the consolidated IG
• A proposal for non-consolidated templates was discussed by the Documentation WG
Transition of Care Initiative Key Dates
• 4/6: Meeting to resolve any outstanding issues. Consensus voting closes.
• 4/8: Final UC package delivered
Use Case & Requirements Workgroup Meeting 3/30
• Scenario 1 & Scenario 2 Update
o Verbal consensus achieved on both scenarios
• Use Case Diagram SWG Update
o Verbal consensus achieved
• Virtual Care Planning SWG is continuing.
Harmonization Meeting 4/1
• Harmonization workgroup kickoff
1
[S&I Framework Newsletter]
April 5, 2011
o New wiki here: http://wiki2.siframework.org
▪ New platform addresses user interface concerns from the JIRA site o Workgroup will meet every Friday at 12pm ET
▪ Register for the GoToWebinar here: https://www3.gotomeeting.com/register/379522166
Laboratory Results Interface Initiative Key Dates
• 4/5: Functional Requirements & Dataset Considerations SWG Kickoff
• 4/14: Finalize In Scope Lab Tests
Use Case & Requirements Workgroup Meeting 3/17
• In Scope Tests SWG Update
o In scope tests from UC team will be used to inform the Harmonization Vocab WG which
will actually select terminologies, value sets and data types
• Success Metrics Update
o Reviewed draft questionnaire to establish current baseline and measures to show
success. Call on committed members to complete questionnaire
• Use Case Diagrams & Scenarios Update
o Scenario 1
▪ Agreed to simplify actors and flow, just provider and lab
▪ Extended discussion of flow and activity diagram o Scenario 2
▪ No final resolution - work continues in SWG
Harmonization Meeting 3/31
• Harmonization workgroup kickoff
o New wiki here: http://wiki2.siframework.org
▪ New platform addresses user interface concerns from the JIRA site o Workgroup will meet every Thursday at 11am ET
▪ Register for the GoToWebinar here: https://www3.gotomeeting.com/register/946638902
Cross Initiative Updates
• ToC & LRI Use Case Simplification SWG Update
o The simplification matrix has been updated, Frieda Hall provided mapping of lab
message data elements to the baseline CCR/CCD sections and data elements. Not much overlap o Need volunteers to compare sections and data elements from Consolidation initiative to
existing CCD/CCR
2