Estimate for PHP 1,600,000 Target Budget
Updated automatically every 5 minutes

Rough Estimate Based on New Proposed Design

To meet the PHP 1,600,000 target budget, we have optimized the design and construction process using lightweight materials and cost-saving strategies while maintaining safety and quality. Below is the breakdown:


1. Foundation Works


2. Columns and Beams


3. Second-Floor Slab


4. Structural Steel


5. Roofing System


6. Demolition Work


7. Interior and Exterior Finishes


8. Plumbing and Electrical Works


9. Permits and Documentation


10. Miscellaneous and Contingency


Rough Estimated Cost:

PHP 1,600,000


Key Adjustments for Budget Alignment:

  1. Use of Lightweight Materials:
  1. Pre-Fabrication:
  1. Optimized Layout:
  1. Recycled Materials:


Prepared by: TEAM JMG