Published using Google Docs
Keep Current with Referendum Projects!
Updated automatically every 5 minutes

CVE 10/4/2021

CVE 10/4/2021

CVE 10/4/2021

WAHS 10/5/2021

WAHS 10/5/2021

Middle School Controls (project completed in August)...while this project is not “visible” to most people, these controls give us the ability to regulate heating, cooling, and air exchange rates.  Without a referendum, this project would not have been possible.

Middle School Controls (project completed in August)

CVE 10/12/2021

CVE 10/12/2021

WAHS 10/12/2021

WAHS 10/19/2021

CVE 10/19/2021

CVE 10/19/2021