Inflatables & Soft Sculpture (99-361) - Spring 2019
COURSE TOPICS & SCHEDULE
The schedule is subject to change depending upon our progress. I will give you as much notice as possible if a change is in the best interest of the class and will be necessary.
DATE | DUE | IN-CLASS ACTIVITIES | ASSIGNMENTS |
01 M 1/14 | Welcome Slideshow + Syllabus. Assignment: Improvisation Inflatables. | > Improvisation Inflatables (due 1/23) > Sample Books (due3/6) | |
02 W 1/17 | Group Large-Scale Plastic Inflatables. Documentation Upload. | ||
M 1/21 | Dr. Martin Luther King, Jr. Day - NO CLASS | ||
03 W 1/23 | Improvisation Inflatables | Look at Improvisation Inflatables Demo: Hand-sewing basic forms | > 50 Ways List (due 1/28) > Push/Pull Part 1 - Objects (due 2/11) |
04 M 1/28 | 50 Ways List | Intro to Machine Sewing NOT required for those who HAVE taken Soft Fabrication or Intro to Textiles | |
05 W 1/30 | COLD DAY - CLASSES CANCELED | ||
06 M 2/4 | Machine Sewing - Day 2 Demo: Sewing Shapes | ||
07 W 2/6 | Demo: Grafting 3D patterns & shapes | ||
08 M 2/11 | Push/Pull Part 1 | Look at Push/Pull Part 1 - Objects Introduce Push/Pull Part 2 - Spaces Slideshow & Getting into Groups. | > Push/Pull Part 2 - Spaces (due 2/20) |
09 W 2/13 | Demo: Enlarging Patterns Demo: Using the Juki Industrial Sew Machine | ||
10 M 2/18 | Demo: adding sewn air tubes Introduce Doppelganger assignment In class work time. | > Bring an object to pattern on 2/20 (for Doppelganger assignment) | |
11 W 2/20 | Objects to Pattern | Workshop: Patterning an Object | |
10 M 2/25 | Push/Pull Part 2 | Look at Push/Pull Part 2 - Spaces | |
11 W 2/27 | Introduce Collaborative Pavilion Project. Begin Collaborative Pavillion Ideation Workshop: Patterning an Object, continued. | > Complete Doppelganger (due 3/6) > Collaborative Pavilion Proposals and Proof of Concept (due 3/25) | |
12 M 3/4 | Demo: Double-wall exercise. In class work time. | ||
13 W 3/6 | Doppelgangers | Gallery of Doppelgangers. | |
DATE | DUE | IN-CLASS ACTIVITIES | ASSIGNMENTS |
14 M 3/11 | SPRING BREAK | NO CLASS | |
15 W 3/13 | SPRING BREAK | NO CLASS | |
16 M 3/18 | Visiting Artists: Pneu Haus Work time. | ||
17 W 3/20 | Introduce Research assignment. Work time. | ||
18 M 3/25 | Collaborative Pavilion Proposals and Proof of Concept | Critique: Collaborative Pavilion Proposals and Proof of Concepts | > Revise Proposals based upon feedback > Create a Work Plan & Material Needs List |
19 W 3/27 | Revised Proposals Work Plans | Look at Revised Proposals and Work Plans Work time | |
20 M 4/1 | Work time: Patterning and Assembling | ||
21 W 4/3 | Work time: Patterning and Assembling | ||
22 M 4/8 | In-Progress Critique Possible Work Time. | ||
23 W 4/10 | Work time: Assembling and Testing | ||
24 M 4/15 | Work time: Assembling and Testing | ||
25 W 4/17 | Work time: Assembling and Testing | ||
26 M 4/22 | Work time: Testing & Tweaking | ||
27 W 4/24 | In-Progress Critique Possible Work Time. | ||
28 M 4/29 | Work time: Testing & Tweaking | ||
29 W 5/1 | Work time: Testing & Tweaking | ||
SAT. 5/4 | EVENT | Set aside all day and evening of Sat., May 4 | |
Exam Slot | Clean-up |
REMINDER NOTE:
Inflatable Awesome Pavilions + Concert Event: This event will take place on Saturday, May 4. Set aside the entire day and evening. Everyone is required to help set-up and take down our inflatable structure(s)! Mark your calendars!