
2424 N Batavia Street Orange, CA 92865 (800) 498-BAGS (2247) |
|
|
| www.ocsandbagger.com sales@ocsandbagger.com Office: (714) 637-2000 |
|
Below are the terms and conditions set forth by Orange County Sandbagger:
- OC Sandbagger provides temporary erosion control and temporary rentals
- OC Sandbagger does not warranty materials or installation that is subsequently damaged
- Minimum 48 hour lead time for all job requests except emergencies
- Installation based on trencher & truck accessible prepared areas free of weeds, trash and other debris
- Installation price may increase with an hourly charge for labor and/or equipment due to difficult or rocky soil conditions or poor access
- Neither payment nor performance bonds included
- Materials & services not provided by or shown on OC Sandbagger price list charged @ cost plus 15% (including dump or recycling fees, etc)
- Payment terms: No retention; 1st time customers COD, credit card or approved credit application, net 30 terms; 1.5% per mo finance charge on unpaid balance
- Customer agrees to pay for additional administrative services and costs such as insurance certificates, waivers of subrogation, additional insureds, city business licenses, certified payroll, etc. if required for payment
- Sales tax applies to materials and delivery charges
- No traffic control included
- Standard crew consists of one foreman and two laborers
- All work performed shall be at the request and direction of the customer's job superintendent or project manager
- Labor rates are for landscape maintenance laborers, other classifications are billed accordingly. All labor is port-to-port, 4 hr minimum.
- Regular work hours M - F from 7:00 am to 3:30 pm, portal to portal, beginning when crew loads or is dispatched
- Overtime hours M - F at 1.5 x regular hourly rate from 3:30 pm to 6:30 pm & Sat 7:00 am to 3:30 pm
- Double-time hours M - F from 6:30 pm to 7:00 am, Sat 3:30 pm to Mon 7:00 am including Sundays & holidays
- Standby charges apply if crews are idle more than 30 minutes
- Trucking and T & M labor rates based on 4 hour minimum during regular working hours
- Equipment charged daily rate, including operator, 1/2 day minimum including travel
- Rental equipment requested by contractor to be onsite that is not operated will be charged the daily rate until rental terminated
- Prices include one move-on; additional move-ons subject to time & materials charges.
- Water to be provided by customer through 2 1/2" meter hydrant or equivalent connection if needed to complete job
- Customer is responsible for full replacement cost on damaged materials and/or equipment
- This proposal is valid for 30 days
- 4% credit card convenience fee (min. $2.00) added to all invoices paid by credit card