255 NE 6th Ave,
Estacada, Oregon 97023
Healthy and Safe Schools Plan
In 2017, the Oregon State Legislature passed SB 1062, which requires that every school district, education service district, and public charter school develop a Healthy and Safe Schools Plan (HASS Plan). Each organization’s HASS Plan has specific requirements that must be included for the HASS Plan to comply with state law. All HASS Plans are due to the Oregon Department of Education by July 1, 2019. Additionally, each school district, education service district, and public charter school is required to certify annually that the organization continues to comply with the requirements of the HASS Plan by filing an Annual Statement. The following plan was developed to meet these requirements.
The person responsible for administering and implementing the Healthy and Safe Schools Plan:
Name: Mike Waer
Position Title: Executive Director of Operations
Phone Number: 503-630-6871
Email Address: waerm@estacada.k12.or.us
Mailing Address: 1101 N. Broadway Street, Estacada, OR 97023
The person who is the designated IPM Coordinator:
Name: Scott Fish
Position Title: Facilities/Ground
Phone Number: 503-630-6871
Email Address: fishs@estacada.k12.or.us
Mailing Address: 1101 N. Broadway, Estacada, OR 97023
The person responsible for AHERA information:
Name: John Simpson
Position Title: Facilities Coordinator
Phone Number: 503-680-6871
Email Address: simpsonj@estacada.k12.or.us
Mailing Address: 1101 N. Broadway, Estacada, OR 97023
All facilities owned or leased by the Estacada School District where students or staff are present on a regular basis are covered by this HASS Plan. The list of those buildings and facilities is below:
Facility Name | Facility Address |
Estacada High School | 355 N 6th Ave, Estacada, OR 97023 |
Estacada Middle School | 500 NE Main Street, Estacada, OR 97023 |
River Mill Elementary | 850 N Broadway Street, Estacada, OR 97023 |
Clackamas River Elementary | 301 NE 2nd Ave, Estacada, OR 97023 |
Summit Learning Charter School | 30391 SE Hwy 211, Eagle Creek, OR 97022 |
Orchid Health Center | 355 N 6th Ave, Estacada, OR 97023 |
Transportation/Operations Building | 1101 N Broadway Street, Estacada OR 97023 |
All school districts, education service districts, and public charter schools are required to test for and eliminate exposure to elevated levels of lead in water used for Drinking and Food Preparation through either remediation or eliminating access, according to OAR 333-061-0400 and OAR 581-022-2223. In conformance with those administrative rules, Estacada School District certifies the following:
Facility Name | Year of Last Test | Next Scheduled Test (Beginning of 6 year schedule) | Schedule or Exemption Reason |
Estacada High School | 2016 | 2022 FY | 6 year schedule |
Estacada Middle School | 2016 | 2022 FY | 6 year schedule |
River Mill Elementary | 2016 | 2022 FY | 6 year schedule |
Clackamas River Elementary | 2016 | 2022 FY | 6 year schedule |
Summit Learning Charter School | 2016 | 2022 FY | 6 year schedule |
Orchid Health Center | 2016 | 2022 FY | 6 year schedule |
Transportation/Operations Building | 2016 | 2022 FY | 6 year schedule |
In order to comply with the United States Environmental Protection Agency’s Renovation, Repair and Painting Program Rule, the district will only contract with certified lead-based paint renovation contractors licensed by the Oregon Construction Contractors Board.
Estacada School District complies with the federal Asbestos Hazard Emergency Response Act (AHERA). All required asbestos management plans are available for viewing by submitting a request to John Simpson
Estacada School District has developed a radon plan as required by ORS 332.167. Community members can access a copy of the radon plan here: Radon Plan
Test results will be made public and are available here: https://drive.google.com/file/d/1EvHoXsWop-z6mRBLNwPjiF5XjYVZEGAd/view?usp=sharing
Estacada School District has adopted an Integrated Pest Management (IPM) plan as required by ORS 634.700 through 634.750. Community members can access a copy of the IPM plan here: IPM Plan
Estacada School District certifies that all buildings subject to the Healthy and Safe Schools Plan comply with the carbon monoxide detection standards in the state building code that was in effect when the building was originally constructed or as required by building code due to addition, upgrade, or remodel.
Estacada School District is complying with the requirement to provide access to test results, as defined by OAR 581-022-2223 within 10 business days as defined by ORS 332.334. Test results can be found on ESD website at: https://sites.google.com/estacada.k12.or.us/facilitiesmaintenance Specific test results can be found as follows:
Additionally, copies of all test results are available at 1101 N. Broadway, Estacada, Oregon 97023, Estacada School District will also use current district email lists or communications programs to provide final test results to staff, students, parents of minor students, and other members of their community. This includes providing actual final test results or providing direct access to final test results through links in the communications. Please contact Mike Waer to be added to current district email lists and programs.
I certify that the above information is true and accurate to the best of my knowledge.
Sign here: Mike Waer | Executive Director of Operations | 6/18/19 |
Electronic signature of authorized representative | Title | Date |