Estacada HASS ODE Approved
Updated automatically every 5 minutes

255 NE 6th Ave,

Estacada, Oregon 97023

Healthy and Safe Schools Plan

In 2017, the Oregon State Legislature passed SB 1062, which requires that every school district, education service district, and public charter school develop a Healthy and Safe Schools Plan (HASS Plan). Each organization’s HASS Plan has specific requirements that must be included for the HASS Plan to comply with state law. All HASS Plans are due to the Oregon Department of Education by July 1, 2019. Additionally, each school district, education service district, and public charter school is required to certify annually that the organization continues to comply with the requirements of the HASS Plan by filing an Annual Statement. The following plan was developed to meet these requirements.

  1. Responsible Person

The person responsible for administering and implementing the Healthy and Safe Schools Plan:

Name:  Mike Waer

Position Title:  Executive Director of Operations

Phone Number:  503-630-6871

Email Address:  waerm@estacada.k12.or.us 

Mailing Address:  1101 N. Broadway Street, Estacada, OR 97023

The person who is the designated IPM Coordinator:

Name:  Scott Fish

Position Title:  Facilities/Ground

Phone Number:  503-630-6871

Email Address: fishs@estacada.k12.or.us 

Mailing Address: 1101 N. Broadway, Estacada, OR 97023

The person responsible for AHERA information:

Name: John Simpson

Position Title:  Facilities Coordinator

Phone Number:  503-680-6871

Email Address:  simpsonj@estacada.k12.or.us 

Mailing Address:  1101 N. Broadway, Estacada, OR 97023

  1. List Facilities

All facilities owned or leased by the Estacada School District where students or staff are present on a regular basis are covered by this HASS Plan. The list of those buildings and facilities is below:

Facility Name

Facility Address

Estacada High School

355 N 6th Ave, Estacada, OR 97023

Estacada Middle School

500 NE Main Street, Estacada, OR 97023

River Mill Elementary

850 N Broadway Street, Estacada, OR 97023

Clackamas River Elementary

301 NE 2nd Ave, Estacada, OR 97023

Summit Learning Charter School

30391 SE Hwy 211, Eagle Creek, OR 97022

Orchid Health Center

355 N 6th Ave, Estacada, OR 97023

Transportation/Operations Building

1101 N Broadway Street, Estacada OR 97023

  1. Elevated Levels of Lead in Water Used for Drinking or Food Preparation

All school districts, education service districts, and public charter schools are required to test for and eliminate exposure to elevated levels of lead in water used for Drinking and Food Preparation through either remediation or eliminating access, according to OAR 333-061-0400 and OAR 581-022-2223. In conformance with those administrative rules, Estacada School District certifies the following:

  1. All testing was done according to the testing requirements in OAR 333-061-0400;
  2. All samples were analyzed by a lab accredited by Oregon Health Authority to test for those materials;
  3. All water fixtures required to be tested under OAR 333-061-0400 were tested for elevated levels of lead in accordance with the testing schedule developed by the Oregon Health Authority; and
  4. The testing schedule for each building covered by this plan is set forth below:

Facility Name

Year of Last Test

Next Scheduled Test (Beginning of 6 year schedule)

Schedule or Exemption Reason

Estacada High School

2016

2022 FY

6 year schedule

Estacada Middle School

2016

2022 FY

6 year schedule

River Mill Elementary

2016

2022 FY

6 year schedule

Clackamas River Elementary

2016

2022 FY

6 year schedule

Summit Learning Charter School

2016

2022 FY

6 year schedule

Orchid Health Center

2016

2022 FY

6 year schedule

Transportation/Operations Building

2016

2022 FY

6 year schedule

  1. Lead Paint

In order to comply with the United States Environmental Protection Agency’s Renovation, Repair and Painting Program Rule, the district will only contract with certified lead-based paint renovation contractors licensed by the Oregon Construction Contractors Board.

  1. Asbestos

Estacada School District complies with the federal Asbestos Hazard Emergency Response Act (AHERA). All required asbestos management plans are available for viewing by submitting a request to John Simpson

  1. Radon

Estacada School District has developed a radon plan as required by ORS 332.167. Community members can access a copy of the radon plan here: Radon Plan

Test results will be made public and are available here:  https://drive.google.com/file/d/1EvHoXsWop-z6mRBLNwPjiF5XjYVZEGAd/view?usp=sharing

  1. Integrated Pest Management

Estacada School District has adopted an Integrated Pest Management (IPM) plan as required by ORS 634.700 through 634.750.  Community members can access a copy of the IPM plan here: IPM Plan 

  1. Carbon Monoxide Detectors

Estacada School District certifies that all buildings subject to the Healthy and Safe Schools Plan comply with the carbon monoxide detection standards in the state building code that was in effect when the building was originally constructed or as required by building code due to addition, upgrade, or remodel.

  1. Test Results Publication

Estacada School District is complying with the requirement to provide access to test results, as defined by OAR 581-022-2223 within 10 business days as defined by ORS 332.334. Test results can be found on ESD website at: https://sites.google.com/estacada.k12.or.us/facilitiesmaintenance   Specific test results can be found as follows:

Additionally, copies of all test results are available at 1101 N. Broadway, Estacada, Oregon 97023, Estacada School District will also use current district email lists or communications programs to provide final test results to staff, students, parents of minor students, and other members of their community. This includes providing actual final test results or providing direct access to final test results through links in the communications. Please contact Mike Waer to be added to current district email lists and programs.

 

I certify that the above information is true and accurate to the best of my knowledge.

Sign here: Mike Waer

Executive Director of Operations

6/18/19

Electronic signature of authorized representative

Title

Date