Plumbing Problems 52 Cleveland May 31 2024

Main Drain Cleanout

52 Cleveland U4

U4 Shower Enclosure

52 Cleveland U6

52 Cleveland U1

52 Cleveland U2

52 Cleveland U5

Plumbing Progress at 52 Cleveland

52 Cleveland Plumbing Repair Report

Unit 4 (U4)

Unit 6 (U6)

Unit 1 (U1)

Unit 2 (U2)

Unit 5 (U5)

Unit 3 (U3)

Summary of Drain Clogging at 52 Cleveland as of 6/3/2024

Plumbing Progress at 52 Cleveland

Follow-Up Plumbing Action Items at 52 Cleveland:

Conclusion:

Plumbing Problems 52 Cleveland May 31 2024

Last update 5/31/2024

This is front view of the building:

Front yard is next to the dumpster

This is the right side of the building.

This is the front yard.

There seems to be a drain cleanout on the ground.

This is the side yard on the left.

The cleanout is located in this side yard.

Main Drain Cleanout

This cleanout is located in the middle of the building in the backyard.

Not sure if this cleanout is for the entire building.

There might be another drain cleanout well close to the street? We need the plumber to look into.

52 Cleveland U4

U4 Shower Enclosure

Tenant’s choice:

Unit 4 Tenant mentioned: I'm good with this shower enclosure cuz it's smaller and cheaper than the one that you sent me this way it'll give me more room in the bathroom

Home Depot

https://www.homedepot.com/p/Delta-Classic-500-Curve-32-in-L-x-60-in-W-x-72-in-H-4-Pieces-Alcove-Shower-Kit-with-Shower-Wall-and-Shower-Pan-in-White-BVS2-C51601-WH/329675780

Delta

Classic 500 Curve 32 in. L x 60 in. W x 72 in. H 4-Pieces Alcove Shower Kit with Shower Wall and Shower Pan in White  $808

Need to install a shower curtain or sliding door in the front.

52 Cleveland U6

52 Cleveland U1

52 Cleveland U2

52 Cleveland U5

52 Cleveland U3

Summary Drain Clogging at 52 Cleveland as of 6/3/2024

Jose, please work on the followings:

1) U2 Kitchen Faucet; => Done; Kitchen sink clogging => fixed

2) U2 Toilet Flange change if time permitting;

3) U5 Bathtub clogging;  => Pending

4) U5 Double check if kitchen sink is working in U5;

5) U6 Slow drain in Bathtub => Pending

6) U4 slow drain in bathtub and vanity sink => Pending

7) U3 please check plumbing all working

8) U1 please check plumbing all working => slow drain pending

Plumbing Progress at 52 Cleveland

Day 1 June 2, 2024

Day 2 June 3, 2024

Day 3 June 4, 2024

Day 4 June 5, 2024

Ran cable to clean bathtub drains

Multiple broken Kitchen Faucets have been replaced in U2, U4, U5

Disgusting drain clogged problems almost in every apartment unit

New kitchen faucet in U4

New kitchen faucet in U5

Crawl space was disgusting

The  plumber had no choice but getting there to fix the drain pipe to solve the drain clogging problem

This picture showing the clogged pipe

Trash in the crawl space

This is the access to the crawl space from U3 backyard

The bathtub clogged was major and difficult and persistent problems.

Finally resolved after the piping work done in the crawl space.

Before:

After:

The plumbing was another major nightmare at 52 Cleveland.

Every apartment unit was more and less clogged.

It took four days to solve every problem.

We should be in a good state now.

Please review this document with some sample pictures to understand the scope of the work.:-)

https://docs.google.com/document/d/1_RA6c6L2MqwMsI--fkrOFmQiDKc6CptTzQDv8lHltoM/edit#heading=h.ofs6yvq6r22u

Also some learning curve to learn more about this building.

These tenants were also very tolerant. They have been living in this condition without too many complaints.

I guess that they got used to it. We made a major change that we care about the property and we will expect the tenants will do the same.

This is just initial step.  There are still lot of work to be done.

For U4, there is a major water damage. The bathtub may sink any time soon. We plan to renovate this bathroom. The. refrigerator is too old and has mold. We need to change as well.

This is just update on plumbing.  I have more news and update for you in the next email thread.

For now I want you to join me to enjoy to celebrate this moment with a huge relief in this big urgent uninhabitable issue.

Follow up:

U4: Needs to replace garbage disposal in unit 4

U5: Tested shower pressure; shower head was good, ** but tub spout pressure was weak. U5: Recommended replacing the valve, which requires removing tile and sheetrock to access the valve.

  1. Unit 5:

52 Cleveland Plumbing Repair Report

Unit 4 (U4)

Unit 6 (U6)

Unit 1 (U1)

Unit 2 (U2)

Unit 5 (U5)

Unit 3 (U3)

Summary of Drain Clogging at 52 Cleveland as of 6/3/2024

Action Items:

  1. U2 Kitchen Faucet: Done; Kitchen sink clogging: fixed.
  2. U2 Toilet Flange change if time permitting.
  3. U5 Bathtub clogging: Fixed.
  4. Double check if kitchen sink is working in U5.
  5. U6 Slow drain in Bathtub: Fixed.
  6. U4 slow drain in bathtub and vanity sink: Fixed.
  7. U3: Check if all plumbing is working (all fixed).
  8. U1: Check if all plumbing is working; slow drain pending (unconfirmed low water pressure).

Plumbing Progress at 52 Cleveland

Day 1 - June 2, 2024:

Day 2 - June 3, 2024:

Day 3 - June 4, 2024:

Day 4 - June 5, 2024:

Summary:

Follow-Up Plumbing Action Items at 52 Cleveland:

Mr Sun

Conclusion: