REGULAR AGENDA

MAJOR TRANSIT AND TRANSPORTATION CONSTRUCTION TRAFFIC

MANAGEMENT COMMITTEE

Thursday, July 18, 2019, 9:00 AM

 

Currently on Item Number:

 AGENDA ITEMS:

21

 

AGENDA ITEMS:

1)     Lissete Henderson (Blaine Tech Services)

4005 W 3rd St – PLE: Groundwater monitoring and sampling.

Previous TCTMC #: 190286-PLE

·            BSS#:  2019005580, 005581, 005582

DISPOSITION:

2)     Jared Martinez (Philmont Management Inc)

678 Ardmore Ave– PLE:  Crane Work

·            U-P#: 2019005584

DISPOSITION:

3)     Charles Shenouda/ Mathee Deegan (LADWP / Parkia)

Aviation Blvd btw Imperial Hwy & Arbor Vitae St – PLE: 138kV Underground transmission cable replacement project.

·            U-P#:  

DISPOSITION:

4)     Mark Patterson (LADWP)

807 S La Brea Ave – PLE: Install 1” domestic service.

·            U-P#: 2019007987  

DISPOSITION:

5)     Mark Patterson (LADWP)

883 Crenshaw Blvd– PLE: Install 2” fire service.

·            U-P#: 2019007789  

DISPOSITION:

6)     Steve Argueta (Roadway Construction Service / Largo Concrete)

3525 W 8th St – PLE: Concrete pours.

·            BSS#:  2019005530,005531, 005532, 005533

DISPOSITION:

7)     Steve Osborn (Wilshire Construction / Right of Way Inc)

Harvard Blvd & 8th St – PLE: Sewer work on 8th St.

·           S-P#: 70483  

DISPOSITION:

 

 

8)     Brandon Yoo (Bando Dela Corp)

3170 Olympic Blvd – PLE: Fence with Canopy for new building construction, 252-unit multi-use apartment with retail space. Demo will begin mid-July.  Excavation is schedule to start in October 2019.

·            BSS#: 2019005629  

DISPOSITION:

9)     John Johnston (AT&T)

Wilshire & Muirfield – PLE: Access maintenance hole to place and splice fiber cable to customer location.

·            BSS#: 2019004690

DISPOSITION:

10)  John Johnston (AT&T)

6th St & Ardmore Ave – PLE: Access maintenance hole to place and splice fiber cable to customer location.

·       BSS#: 2019005609

DISPOSITION:

11)  John Johnston (AT&T)

Olympic Blvd & Masselin Ave – PLE: Excavate repair pit to repair damaged conduit.

·            U-P#: 2019008237

DISPOSITION:

12)  John Johnston (AT&T)

3rd & Crescent Heights Blvd – PLE: Excavate and place trench from wye cast to new handhole.

·            U-P#: 2019008168

DISPOSITION:

13)  Dolores Nix (California Traffic Control Services / Hill Crane)

3663 Wilshire Blvd – PLE: 265 Ton Crane to hoist HVAC Equipment to rooftop.

·            BSS#: 2019005309

DISPOSITION:

14)  Bardo Osorio (EukonGroup)

165 S Crescent Heights Blvd– PLE: Trenching for installation of fiber conduit.

·            U-P#: 2019002362

DISPOSITION:

15)  Mark Patterson (LADWP)

1449 Westwood Blvd – PLE3: Emergency water pipe Repaired, After the fact.

·            U-P#: 2019008368  

DISPOSITION:

 

 

16)  John Johnston (AT&T)

111th St & Hindry Ave – CTC: Excavate repair pit to repair damaged conduit.

·            U-P#: 2019008358

DISPOSITION: Move to next week.

17)  John Johnston (AT&T)

Century Blvd & Concourse Wy – CTC: Access maintenance hole to energize existing fiber cable.

·            BSS#: 2019005646

DISPOSITION:

18)  Lissete Henderson (Blaine Tech Services)

3553 S La Brea – CTC: Groundwater monitoring and sampling.

Previous TCTMC #: 190028-CTC

·            BSS#:  2019005503

DISPOSITION:

19)  Steve Argueta (Roadway Construction Service / PWC)

617 W 7th St– RC: Bus pad replacement.

·           A-P#: 2018009303

DISPOSITION:

20)  Dolores Nix (California Traffic Control Services/Hill Crane)

600 W. 7th St.– RC: 265 Ton Crane to replace Generator.

·            BSS#: 2019005318

DISPOSITION:

21)  Hovik Trtrian (HT Engineering)

426 S Hill St– RC:  9' Hand Trench, Place 1-3" CATV conduit.

·           U-P#:  2019007309

DISPOSITION:

22)  Hovik Trtrian (HT Engineering)

851 S Grand Ave – RC:  Remove concrete over existing pull box.  3’ hand trench from existing box to basement. Place 1-3” CATV Conduit.

·           U-P#:  2019007974

DISPOSITION:

23)  Hovik Trtrian (HT Engineering)

340 E 2nd St – RC:  55’ Asphalt trench.  4’Punch-thru under curb & gutter.  12’ Hand trench, remove and replace 39sq ft concrete sidewalk.  Place 2-3 CATV Conduits.  Trench backfill and A/C pavement resurfacing shall follow the latest version of LA City STD Plan S-477-2.

·           U-P#:  2019007975

DISPOSITION:

 

 

24)  Ken Luttrell / Holly Cape (Luttrell / Secure Hook Decks & Scaffolding)

535 S Grand Ave– RC: Erecting and dismantling scaffolding for safety canopy on sidewalk only.

·            BSS#: 2019005699  

DISPOSITION:

25)  David Ronquillo (TMI / DC Expediting Inc)

865 S Figueroa St – RC:  Building improvements - Facade work, courtyard upgrades.

·           BSS#:  

DISPOSITION:

26)  David Ronquillo (TMI / CP Construction West)

520 Mateo St – SSB:  Sidewalk Closure for Demo of existing building.

·           BSS#: 2019005932

DISPOSITION:

27)  Jared Martinez (TMI/Bali Construction/SoCalGas)

520 Mateo St – SSB: Potholing work on Sante Fe underground utilities

·            BSS#: 2019005148

DISPOSITION:

28)  Bardo Osorio (EukonGroup)

1443 E. 4th St – SSB: Trenching for installation of fiber conduit.

·            U-P#: 2019007836

DISPOSITION: