Course name: Basic Gas Metal Arc Welding | Credit(s) or Grade Level: 10-12 | ||||
Academic Standards: https://dpi.wi.gov/sites/default/files/imce/cte/pdf/te_standards.pdf | Prerequisite(s): Welding I&II | ||||
Course Description: Students in this course work to develop manipulative skills on all types of joints in the flat, horizontal and vertical up and down position using short circuiting transfer. Students will perform gas metal arc welding techniques using 1/8” – ½” structural fabricated parts, as per AWS code standards. Emphasis is placed on operating gas metal arc welding equipment in a safe manner and determine machine set-up for metal thickness, wire size and speed. | |||||
Units: | Duration: | Essential Learning/Outcomes: | |||
Safety | 6 days | Safely operate all welding and cutting equipment and tools in the shop. Identify safety attire needed to work in the shop. Pass safety test at 90% or better. | |||
Introduction to Basic Gas Metal Arc Welding | 1 day | Students will learn basic set variables for GMAW and basic knowledge for setting up machines. Students will gain knowledge of the electrode classification system for GMAW. | |||
Gas Metal Arc Welding Set up | 2 days | Students will gain knowledge of basic parts of the drive roll system as well as the gas delivery system of the GMAW power source. | |||
Fitting and Tack Welding | 1 day | Students will gain knowledge of fitting and tack welding parts. Students will demonstrate fitting and tack welding parts. | |||
GMAW Power Sources | 1 day | Students will gain knowledge of the GMAW power sources. | |||
GMAW Wire Feeders, | 2 days | Students will learn the process description of feeding and refeeding electrode wire. Students will demonstrate knowledge of feeding and refeeding electrode wire. | |||
GMAW Solid and Metal Core Electrodes | 1 day | Students will gain knowledge of the FCAW as compared to GMAW welding process, electrodes set up and variables. | |||
GMAW Modes of Metal Transfer | 1 day | Students will gain knowledge of modes of metal transfer, (arc types). Students will learn the difference between short circuit transfer, globular transfer and spray arc, and how to change and control them.ge/control | |||
GMAW Shielding Gasses | 1 day | Students will gain knowledge on shielding gasses and essential information on choosing the correct gas for the appropriate process. As well as the required flow rate. | |||
Lab: Machine maintenance | 1 day | Correctly change a roll of wire when empty or different wire is needed. | |||
Lab: Flat .035 stringer beads pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: Flat .035 butt welds pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: F2 .035 fillet welds, lap joint pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: F2 .035 T-joint fillet welds pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: Clip Test | 1.5 days | Successfully complete the required welds to meet AWS destructive code standards. | |||
Lab: F2 .035 multi-pass T-joint fillet welds pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: Vertical up .035 weld | 6 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: F2 .035 outside corner welds pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: Flat .045 flux cored stringer beads pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: Flat .045 flux cored butt welds pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Lab: F2 .035 pipe welds pushing and pulling | 12 days | Successfully complete the required welds to meet AWS visual standards. | |||
Final weld assembly | 1 day | Successfully complete the required welds to meet AWS visual standards. |