RM Polymers    Guarantee  terms and conditions                                        

Material -  10 , 12,  15 ,20, &  25  Years

Guarantee Serial No:                        QA Contractor: RM Polymers

Main Contractor:                        Customer:

Address of building subject to guarantee:

Area: approx.                Specification Ref:  …………. (“the Specification”) Suitable for: Limited foot traffic

RM Polymers Liquid Plastics, Tor Coatings, Protues, West wood , firestone  products directly supplied and invoiced by RM Polymers Limited set out in QA Application for Guarantee and final inspection certificate; final inspection report and Contractor Confirmation dated ------ (“the Materials”)

Date of Supply of the Materials: --------

“We, RM Polymers Limited, guarantee to the customer that if within the specified Years  of the Date of Supply of the Materials, are proved to be defective, affecting the water tightness of the  Material we will repair, or at our option, pay out the reasonable cost of repair or replacement, subject to the limitations set out below”.

This guarantee is subject to the following conditions:

  1. RM Polymers Limited’s aggregate liability to the customer under this Guarantee shall not exceed £2,000. RM Polymers Limited accepts liability in respect of damage to the fabric of the roof cover by this Guarantee, however, RM Polymers Limited shall have no liability to the Customer whether in contract, tort, misrepresentation, under statute or otherwise, for (a) any physical damage to the building or its contents (other then the fabric of the roof); (b) any direct or indirect: loss of profit, loss of revenue, loss of business, loss of goodwill or reputation; (c) any indirect, consequential or special loss.  RM Polymers Limited’s liability shall not be excluded or limited for any matter for which is not permitted by law to exclude or limit, or to attempt to exclude or limit, its liability.
  2. RM Polymers has received full payment for the RM Polymers Membranes and any Other RM Polymers Delivered Products, and the Roofing Contractor has been paid in full for any installation or application thereof
  3. RM Polymers has  identified  potential or ongoing  areas of the structure causing  water ingress including  structures not built to building  control standards, oversight, mistakes would need to be  corrected  within   3months of being identified in the event of these  substandard items  not being demonstrated that  they have been  corrected and approved by RM Polymers, rm polymers  may apply  a caveat  excluding  the area /  surrounding area including the  decking & substructure being installed  or not by rm polymer s from the guarantee inc and all  any consequential  damages
  4. The Materials have been installed or applied by the Quality Assured Contractor strictly in accordance with the – instructions of the manufacturer supplier & RM Polymers
  5. The Materials as recorded in the Field Installation Report referred to above, are used for the purpose and in a manner for which they were intended and as set out in the manufacturers  Product Data Sheets, RM Polymers Ltd takes no responsibility for the decision on the suitability of the existing substrate and the consequence of any failure of the existing substrate if retained and overlaid.
  6. Any defective Materials are reported in writing to RM Polymers, RM Polymers Brynawel, loveden road Aberystwyth, as soon as the defect is, or should reasonably have been, discovered e.g. after adverse weather or an annual inspection.
  7. The Materials have been maintained with reasonable care in accordance with the attached Maintenance Requirements. The 20 years Product Guarantee period will only remain valid (irrespective of when any defect occurs) if a roof inspection is carried out at not more than the tenth anniversary of the Date of Supply of the Materials. Failure to with this inspection obligation shall cause the Product Guarantee to reduce to 10 years 7, 12  for any other . The inspection must be carried out by RM Polymers Roofing Applications Department and any remedial works found necessary would need to be carried out & chargeable. Access is to be provided by the Customer.
  8. The Guarantee is for the sole benefit of the Customer. Any transfer is subject to the IBG company t & c s. Each assignment shall be effective on the date of written notice being given to RM Polymers or principal place of business/primary residence of the assignee.
  9. The parties do not intend that any of the terms of this Guarantee shall be enforceable by virtue of the Contracts (Rights of Third Parties) Act 1999 by any person not party to it.
  10. This Guarantee shall be construed in accordance with English law and the parties herby submit to the exclusive jurisdiction of the English courts.
  11. For balustrade posts, rials and screens, tiled or slabs and pads, ballasted and green roofs, the Customer is responsible for all investigative works and related costs for any alleged waterproofing failure until it can be demonstrated that there is a fault with the Materials.

GENERAL

In normal use ,products  RM Polymers roofing systems require no routine maintenance. However, it is strongly recommended that careful pressure washing periodic inspections are carried out to check for damage by accidental impact or by building modifications involving the roof structure. Rm Polymerscan supply this  service at a modest charge.  During the course if such inspections, sharp objects such as screws, stones, broken glass and other material should be removed from the surface in order to minimize the chances of accidental damage by subsequent foot traffic. In order to prevent damage by excessive localized loading particularly on roofs incorporating soft insulation, a safe method of load-spreading should be placed under ladders or supports of free-standing structures on the roof. It is a guarantee requirement that the roof is inspected for damage following adverse weather that may reasonably be suspected to have caused building damage. It is also advisable to inspect the roof after work has been carried out by other trades.

INPECTIONS

It is strongly recommended that inspections be carried out by the client at least annually and recorded. Inspections in the Spring should detect any Winter related damage and in Autumn should ensure that the roof is cleared of any leaves and other debris. Roofs in close proximity to trees, subject to high dust or other pollutants or in other high-risk locations should be inspected more frequently.

The following is a list of typical roof details, although each individual roof may have other areas that require inspection:

MAINTENANCE OF RM POLYMERS supplied PRODUCTS

The specific published maintenance requirements of each RM Polymers Branded Product must be followed for continuity of that products guarantee within the system laid out by manufacturer .

CHEMICAL SPILLAGES

Our roofs where plant is installed and maintained chemical spillage is always possible. In the event of such an accident the area should be washed down thoroughly with a domestic detergent solution and rinsed with fresh clean water until all traces of the chemical have been removed from the surface. Ensure sufficient measures are in place to prevent potentially harmful chemicals from entering the water drainage system. If in doubt about the chemical reagents contact RM Polymers Liquid Plastics for further advice.

CLEANING

The membranes will not ordinarily support organic growths. However accumulated dirt resting on the surface due to uneven falls etc. may provide nutrient. Algae and other such dirt accumulations should be washed with a domestic solution and hosed with clean water. Failure to remove heavy dirt accumulations may result in severe vegetation growth capable of damaging the membrane.

REPAIRS

In the event of localised damage, or to reinstate a completely seamless barrier following structural modifications, repairs can be made quickly and easily. All such repairs should be carried out by the original installing contractor to avoid any division of responsibility. Obviously, it is not always possible to arrange an immediate repair with an outside agency. Temporary repairs using other products may be appropriate for short term exposure but full reinstatement using RM Polymers roofing system must be done at the earliest opportunity.

REFURBISHMENT

Materials  and roofing  systems supplied by RM Polymers normally last beyond their initial design lives. They may have their durability extended by the application of additional coatings and a suitable specification can be supplied upon request. This method of roof refurbishment is significantly more cost effective than conventional alternatives and will enable further long-term cost savings to be made.

Note: if the top coat previously applied in a different colour to the underlying coat, this will serve as a guide to the need for recoating -I.e. the coating underneath will begin to show through when the top coat wears thin.

 Extended life top coating is only done under rm polymers  expence if the roof system is  showing signs of imminent  water ingress ,

It can not be guaranteed  the  manufacturer still supplies the same ral colour

Installation  Guarantee terms and conditions-  ?  Years

Guarantee Serial No:                        QA Contractor: RM Polymers

Main Contractor:                        Customer:

Address of building subject to guarantee:

Area: approx.                Specification Ref: …………………(“the Specification”) Suitable for: Limited foot traffic

RM Polymers supplied products directly supplied and invoiced by RM Polymers set out in QA Application for Guarantee and final inspection certificate; final inspection report and Contractor Confirmation dated ------ (“the Materials”)

Date of Supply of the Materials: --------

  1. RM Polymers Limited, RM Polymers & the manufacturer is experienced in and competent to carry out inspections of new and refurbished roof installations.
  2. The RM Polymers Roofing Applications Department has inspected the Materials and their installation by the RM Polymers Quality Assured Contractor of the  chosen manufacturer for the system .
  3. RM Polymers Limited confirms that in the event that a defect in the installation of the Materials affecting the watertightness of the Materials due to workmanship emerges within 10 , 12 15, 20 or 25  years from the Date of Issue we shall, subject to the conditions set out below and provided that the defect could have been discovered through the installation  inspection process, repair the defect as localized repair  or at our option pay the reasonable cost of repair or replacement of the defective part or parts of the Materials together with any damage to the localized fabric of the roof  decking and insulation  directly caused by the defect.

  1. The compensation is calculated at the cost divided by years of use  per m2

The Final Inspection Certificate is subject to the following conditions:

  1. RM Polymers Limited’s aggregate liability to the customer under this Guarantee is  governed by the manufacturers guarantee limit  and shall  not  shall not exceed £1,000 indirectly to  rm polymers. RM Polymers accepts liability in respect of damage to the fabric of the roof cover by this Guarantee, however, RM Polymers Limited shall have no liability to the Customer whether in contract, tort, misrepresentation, under statute or otherwise, for (a) any physical damage to the building or its contents (other then the fabric of the roof); (b) any direct or indirect: loss of profit, loss of revenue, loss of business, loss of goodwill or reputation; (c) any indirect, consequential or special loss.  RM Polymers Limited’s liability shall not be excluded or limited for any matter for which is not permitted by law to exclude or limit, or to attempt to exclude or limit, its liability.
  2. RM Polymers has received full payment for the RM Polymers Membranes and any Other RM Polymers Delivered Products, and the Roofing Contractor has been paid in full for any installation or application thereof to the  size of the roof  quoted  for in the original contract
  3. The Materials have been installed or applied by the Quality Assured Contractor strictly in accordance with the – instructions of RM Polymers & the chosen manufacturers system .
  4. The Materials as recorded in the Field Installation Report referred to above, are used for the purpose and in a manner for which they were intended and as set out in the SLP Product Data Sheets, RM Polymers Ltd takes no responsibility for the decision on the suitability of the existing substrate and the consequence of any failure of the existing substrate if retained and overlaid.
  5. Any defective Materials are reported in writing to RM Polymers Limited, RM Polymers Liquid Plastic, RM Polymers House, Miller Street, Preston, Lancashire, PR11EA, as soon as the defect is, or should reasonably have been, discovered e.g. after adverse weather or an annual inspection.
  6. The Materials have been maintained with reasonable care in accordance with the attached Maintenance Requirements. The 10 , 12 , 15  20  25  years Product Guarantee period will only remain valid (irrespective of when any defect occurs) if a roof inspection is carried out at not more than the tenth anniversary of the Date of Supply of the Materials. Failure to with this inspection obligation shall cause the Product Guarantee to reduce to 10  0r  12  years. The inspection must be carried out by the Liquid Plastics QA Contractor or the RM Polymers Roofing Applications Department and any remedial works found necessary would need to be carried out.  Safe H S  Access is to be provided by the Customer.arranged  Keys &  escort/caretaker  manager   supplied  free of charge
  7. The Guarantee is for the sole benefit of the Customer. It may  only be assigned subject to the  IBG tems  & conditions. Each assignment shall be effective on the date of written notice being given to RM Polymers  brynawel loved  road Aberystwyth  sy23 2ed provided that such notice states the full name and registered office and /or principal place of business/primary residence of the assignee.  Updated  addresses supplied on the  website
  8. The parties do not intend that any of the terms of this Guarantee shall be enforceable by virtue of the Contracts (Rights of Third Parties) Act 1999 by any person not party to it.
  9. This Guarantee shall be construed in accordance with English law and the parties herby submit to the exclusive jurisdiction of the English courts.
  10. For tiled, slabs and pads  decke &  ballasted and green roofs, the Customer is responsible for all investigative works and related costs for any alleged waterproofing failure until it can be demonstrated that there is a fault with the Materials.

Signed                                                        Signed

For RM Polymers Limited                                        For Quality Assured Contractor

Signed                                                        Signed

For Customer                                                For Principal Contractor