MONROEVILLE SCHOOLS PERMANENT IMPROVEMENT NEEDS
➢ Plumbing Renovation of HS (Cost $170,000)
➢ Bus Garage Replacement (Cost $40,000)
➢ Restroom Hand Dryers purchase and installation (Cost $17,000) 40% Complete
➢ Enclose the back of the building with new fence as needed (Need Cost Estimate)
District Safety Concern
➢ New Heating and Cooling Controls centralizing the control of all district heating and
cooling as well as replacing current obsolete and non-working controls (Cost
$64,000)
➢ Cafeteria Kitchen Floor replacement (Cost $25,000)
➢ Masonry Repair Annual (Cost $10,000)
➢ Wash and Seal masonry front of the High School (Cost $25,000)
➢ New Equipment cost for mowing/ snow removal/athletic field maintenance (Cost
$85,000)
➢ Re-install Alumni Signage on HS/MAC (Cost $3,000)
➢ Replace worn carpeting throughout the building (Cost to be determined)
➢ 2 new busses and 1 new school van (Cost $226,000)
➢ New Cafeteria tables (Cost $30,000)
➢ Curriculum Updates (Cost $274,000) planned through 2020-21 school year
➢ Food Service Updates (Cost $47,000) hope to pay through food service earnings
estimated at $20-25,000 each year
➢ Restroom Renovations JrHS/HS (Obtain Cost Estimate)
Total Cost = $1,008,500. (Some items do not have cost estimates at this time and are not
included in the total.