MONROEVILLE SCHOOLS PERMANENT IMPROVEMENT NEEDS.pdf
Updated automatically every 5 minutes

MONROEVILLE SCHOOLS PERMANENT IMPROVEMENT NEEDS

➢ Plumbing Renovation of HS (Cost $170,000)

➢ Bus Garage Replacement (Cost $40,000)

➢ Restroom Hand Dryers purchase and installation (Cost $17,000) 40% Complete

➢ Enclose the back of the building with new fence as needed (Need Cost Estimate)

District Safety Concern

➢ New Heating and Cooling Controls centralizing the control of all district heating and

cooling as well as replacing current obsolete and non-working controls (Cost

$64,000)

➢ Cafeteria Kitchen Floor replacement (Cost $25,000)

➢ Masonry Repair Annual (Cost $10,000)

➢ Wash and Seal masonry front of the High School (Cost $25,000)

➢ New Equipment cost for mowing/ snow removal/athletic field maintenance (Cost

$85,000)

➢ Re-install Alumni Signage on HS/MAC (Cost $3,000)

➢ Replace worn carpeting throughout the building (Cost to be determined)

➢ 2 new busses and 1 new school van (Cost $226,000)

➢ New Cafeteria tables (Cost $30,000)

➢ Curriculum Updates (Cost $274,000) planned through 2020-21 school year

➢ Food Service Updates (Cost $47,000) hope to pay through food service earnings

estimated at $20-25,000 each year

➢ Restroom Renovations JrHS/HS (Obtain Cost Estimate)

Total Cost = $1,008,500. (Some items do not have cost estimates at this time and are not

included in the total.