BOONE COUNTY SCHOOLS TRANSPORTATION

DAILY BUS ROUTE CHANGES

QUESTIONS PLEASE CALL 859-384-5340

MONDAY

10-21-2019

FOR  BUS NUMBER AND ROUTE INFORMATION PLEASE CLICK THE LINK BELOW

http://www.transportation.boone.kyschools.us/livewq/webquery/

FOR BOONE COUNTY ROAD PROJECTS THAT MAY AFFECT BUS ROUTES PLEASE SEE BELOW.

DISTRICT 1 

(FLORENCE AREA)

(SUPERVISOR - DEBBI DANNER-RIOS )

MORNING ROUTES

.

   AFTERNOON ROUTES

BCHS

Please hold the students of bus 308, bus 58 will return for them..

RA Jones

Please hold the students of bus 12, bus 89 will arrive for them.

Collins

Please hold the students of bus 12, bus 66 will return for them.

Florence

Please hold the students of bus 308, bus 54 will return for them

 

.   THERE WILL BE SUBSTITUTE DRIVERS ON THE FOLLOWING BUSES

359 - 342 - 207 - 255 - 234

DISTRICT 2

(HEBRON-BURLINGTON AREA)

(SUPERVISOR - LISA WOODYARD)

MORNING ROUTES

NO CHANGES AT THIS TIME 

 

AFTERNOON ROUTES

Camp Ernst Middle

Please HOLD 46 students and bus 220 will return for them.  Students will be 20+ minutes later than normal.

Conner High/Middle

Please HOLD 363 students and bus 248 will return for them.  They will arrive home 20+ minutes later than normal.

Goodridge

Please LOAD 46 students onto bus 338.  He will take them home.

Stephens Elem.

Please LOAD 363 students onto 262(Sean) and he will take them home after he does his route.

They will be about 15 Minutes later than normal.

 

   THERE WILL BE SUBSTITUTE DRIVERS ON THE FOLLOWING BUSES

45 - 87 - 238 - 24 - 361 - 282 - 248 - 286

DISTRICT 3

(UNION AREA)

(SUPERVISOR - MARY ALISON COMPTON)

MORNING ROUTES

NO CHANGES AT THIS TIME

 

AFTERNOON ROUTES


THERE WILL BE SUBSTITUTE DRIVERS ON THE FOLLOWING BUSES

65 - 198 - 291 - 265 - 357 - 275 - 284

DISTRICT 4

(SPECIAL NEEDS-PRESCHOOL)

(SUPERVISOR - MARY MCCANE)

MORNING ROUTES

NO CHANGES AT THIS TIME

AFTERNOON ROUTES

        

NO CHANGES AT THIS TIME

THERE WILL BE SUBSTITUTE DRIVERS/AIDES ON THE FOLLOWING BUSES

59 - 327 - 229 - 352 - 450 - 33 - 347 - 73 - 33

BOONE COUNTY ROAD INFORMATION & PROJECTS

·       US 25 (Dixie Highway) – Work continues on US 25 in Boone County just North of the Weaver Road/Richardson Road intersection to widen the roadway to accommodate a new left-turn lane. Beginning Monday, October 29th, Southbound traffic will be reduced to one lane at the Weaver Road/Richardson Road intersection. All SB traffic will use the existing left turn lane to proceed left, thru, or right at the intersection. Motorists should expect delays when travelling SB through the work zone. The posted speed limit in the work zone is 35 MPH.

KY 237 (Pleasant Valley Road) – A construction project is in progress on Pleasant Valley Road between Valley View Drive and Rogers Lane. The roadway is being widened and re-aligned and includes construction of a bridge and roundabout. The project will also include a multi-use path on both sides of the road. Motorists should be aware of flaggers for lane closures throughout the project. The project has a December 2020 completion date.

I-75 NORTHBOUND (MP 178.02 to 183.08) An interstate rehabilitation project has begun on I-75 in Boone County between Mt. Zion Road (MP 178.02) and the Kenton County Line (MP 183.08). The project will consist of an asphalt pavement rehabilitation/resurfacing and the addition of auxiliary lanes on I-75 in both directions from KY 536 (Mt. Zion Road) to US 42.  The speed limit will be reduced by 10 MPH in the project area.  Double fines will be issued in the work zone. ​

​Construction is expected to be completed in two phases:

•        Phase 1, construction of the northbound merging lane and northbound pavement work from the Mt. Zion Road interchange north to mile marker 183, will take place between spring and fall 2019.

•        Phase 2, construction of the southbound merging lane and southbound pavement work from the mile marker 183 south to the Mt. Zion Road interchange, is anticipated to take place between spring and fall 2020.

Motorists should watch for work crews, equipment, lane closures, and trucks entering and exiting traffic throughout the work zone.

KY 237 (North Bend Road) A project is in progress on KY 237 (North Bend Road). A northbound lane will be added from the I-275 ramp to South Park Drive. The roadway will also be improved and sidewalks added from South Park Drive to the roundabout at Cardinal Way. The project also includes several improvements to Worldwide Blvd. Motorists should watch for crews, equipment and lane closures.

Botts Lane at the KY 18 end will be closed for 3 weeks. The expected reopen date is 4/9/19.