Grenvil Marquis Dunn
Principal Engineer
Updated: 11 February 2019
Qualifications 1970 BSc Honours degree in Chemical Engineering from University of Cape Town Professional Affiliations Pr Eng (RSA) C Eng (UK) Fellow of Institution of Chemical Engineers MSAIMM Member TMS (AIME) MSAIChE Key Skills
| Summary of experience
Key Commodities
|
Experience
Nickel, Cobalt, Copper, Gold: Project experience – Studies/Reviews/Design
Year | Country | Company | Description |
2018 | South Africa | Tharisa / Karo | Desk top study options for processing PGM mattes/concentrates/malloys |
2018 | South Africa | Senet | Design of a sulfurous acid plant for the Kamoto Copper Project in DRC |
2018 | Australia | RCFM | Due diligence assistance for resource capital funds management. Technical review of Nkamouna project in Cameroon |
2018 | South Africa | Anglo | Process and mechanical design of Anglo Platinum electrochemically controlled pressure leach for the recovery of copper from a PGM containing matte |
2018 | Australia | Jolimont | Review of the Glyleach process |
2017/2018 | Australia | OZM | Ongoing testwork support for removal of radionuclides from copper concentrate employing an electrochemically controlled pressure oxidation leach developed by Hydromet in 2012 |
2017/2018 | Undisclosed | SFA | Review of the Kell Process for SFA |
2017/2018 | Idaho | Midas | Gold pressure oxidation autoclave design with in-situ arsenic attenuation based on batch and pilot plant testwork managed by Hydromet for Midas Stibnite Gold Project. |
2017/2018 | Namibia | Celsius | Targeted electrochemically controlled cobalt leach from intergrown cobalt and iron sulfide minerals for Opuwa Cobalt Project |
2017 | Papua New Guinea | Goldpu | Desktop study (Capex and Opex) and testwork employing Hydromet electrochemically controlled developed Single Stage Leach on Copper concentrate upgrading copper for Wafi Goldpu Project |
2015/2016 | Turkey | META | Consulting and commissioning of the nickel pressure acid leach plant |
2013-2016 | Australia | Oz Minerals | Managed a 700 hour pilot and 5 month demonstration plant confirming the process to remove uranium and its daughter radionuclides from a copper-iron-sulfide concentrate. provided basic engineering data to facilitate two levels of study plus FEED 1 for copper concentrate upgrade project |
2015 | South Africa | Angloplats Rustenburg | Consulting on the installation of a flash thickener recycle facility for exothermic autoclaves |
2015 | Turkey | MEAB/ META | Study for the recovery of scandium from the HPAL products for nickel cobalt project |
2014 | Argentina | Peregrine Metals | Managed batch testwork to confirm the hydrometallurgical process to remove arsenic from copper concentrates so that they can be admitted penalty-free to smelters. Conducted trade off study comparing total oxidation+SX+EW with this upgrade process |
2014-2016 | Mexico | Cuprosa | Managing testwork and conducting the engineering for an electrochemical process to recover copper and arsenic from a Lead-Copper matte |
2014/2015 | Zimbabwe | Zimplats | Consulting on the design of the nickel-copper-PGM matte refinery at the BMR |
2014/2015 | Mexico | Chesapeake Gold Corp | Pre feasibility study: Gold/zinc pressure oxidation plant with Zn SX and Zn EW for Metates gold project |
2012 | Brazil | Anglo American / SNC Minerconsult | Pre feasibility study: HPAL Nickel Laterite (Ore to metal). Lead process engineer on their Jacare project |
2011/2012 | Tanzania | African Eagle | Study: process consultant, testwork and piloting and basic engineering for their Dutwa Nickel Project |
2011-2012 | USA | Twin Metals Minnesota/ Antofagasta | Study: recovery of PGM, Ni, Cu and Co from the Duluth sulphide deposits using Platsol and other relevant processes |
2011-2012 | USA | Essential Metals/ Formation Capital | Implementation: copper cobalt pressure leach with CuSX–EW and cobalt precipitation of MHP with releach to cobalt rounds using CoEW recovery in divided cells. Consultant to client and engineer during detailed engineering and construction phase for their Cobalt Plant Project |
2011-2012 | USA | Stillwater Mining | Study: base metals and downstream processing of PGM rich concentrates for Nickel Copper Plant |
2011 | Cameroon | Lycopodium/ OMC | Study: feasibility study for a cobalt and nickel refinery to its intermediate mixed sulphide precipitate for Nkamouna their project |
2011 | Western Australia | Equinox | Study: scoping study – pressure leach option for treatment of Lumwana copper concentrate employing flash thicken recycle process |
2009 | Brazil | Vale | Study: process options laterite study for recovery of MHP from laterites and sulphides for Onca Puma Project |
2009 | Australia | HNC Resources | Study: Alternate nickel and cobalt recovery circuit on their Browns Oxide Project |
2008 | Australia | Metallica Metals | Study: Consultant to the heap leachate-to-MHP base case. Provided Basic Process Engineering Package to Study Engineer for their Nornico Nickel Laterite Project |
2007/2008 | DRC | Glencore | Mutanda Mine – Mumi copper/cobalt project. study: Provided basic process engineering package for the feasibility study |
2007/2008 | Kazakhstan Russia | Oriel Resources | Schevchenko Nickel Laterite Project study: provided Basic Engineering Package for DFS for demonstration plant – consultant to client |
2006-2008 | DRC | FQM | Kolwezi Musonoi Tailings (KMT) project study: atmospheric leach - copper SX and EW, cobalt to MHP and recovery to metal. Provided PFS Basic Engineering Package for hydrometallurgical plant – tailings to cobalt/copper metal. Process design for leach, sulphur dioxide contacting, reflux, iron removal and cobalt semi product. Detailed design for cobalt refinery |
2007 | RSA | RSA | Braemore Resources ConRoast Project study: responsible for the development of the BMR recovery process. Directed the base metal and PGM recovery testwork. Provided PFS Basic Engineering Package for the nickel, copper, cobalt recovery circuit treating an alloy to produce a high grade (+65% PGM) concentrate copper by EW and (Ni and Co) to MHP |
2006-2007 | Zambia | FQM | Kansanshi Copper Project Study: Provided Basic Engineering Package for the copper circuit concentrate POX employing the Flash Thicken Recycle concept to increase the existing autoclave capacity |
2007 | Australia | Lionore | Avalon Phase 1 Project study: For processing of Honeymoon Well concentrates at the reconfigured Bulong Nickel Plant Kalgoorlie for nickel concentrate pressure leaching in saline waters to produce nickel cathode |
2007 | DRC | Camec PLC | Luita Copper and Cobalt EW Project study: Provided a process design package for the copper and cobalt electrowinning |
2006 | USA | Stillwater Mining | Implementation: Detailed Mechanical Design and assist in construction of new alloy autoclave vessel for nickel/copper pressure leach for SMC’s Autoclave Design Project |
2006 | USA | Augusta Resources | Copper Molybdenum Project study: Provided PFS Basic Engineering Package for copper pressure leach, solvent extraction and electrowinning |
2002/2004 | Zambia | Avmin | Chambishi Cobalt Recovery Plant Project implementation: Design cobalt recovery plant including iron removal, zinc solvent extraction, cobalt MHP and resolution |
2002/2004 | Zambia | Avmin | Chambishi Pressure Leach autoclave upgrade project study into explosions with pressure leach autoclave andandand provided a basic engineering package for the autoclave upgrade for safe operations |
2002/2003 | Murrin Murrin | Anaconda Nickel Project Litigation - mixed sulfides and refinery circuits for nickel and cobalt recovery | |
2002/2005 | Australia | Western Mining Company | Study: Engineering Feasibility Study for MKO pressure leach and concentrate leach of Ni Sulfides. Design cobalt recovery plant including iron removal, zinc solvent extraction, cobalt MHP and resolution |
2000/2002 | USA | Hatch Consulting Company | For Stillwater Mining Company implementation: Upgrade of the Stillwater Platinum Base Metal Refinery in Montana USA - recovery of nickel and copper from matte and production of high grade PGM concentrate. Commissioned copper pressure leach autoclave |
1994/1995 | Zimbabwe | SRK | Hartley Base Metal Refinery Implementation: Responsible for the process design producing high grade PGM concentrate, nickel and copper by-products involving atmospheric leaching, pressure oxidation of sulfides with front flash cooling, nickel and copper PLS purification and Electrowinning |
1992-2004 | RSA | SRK | Lonmin Projects 1992 – 1994 Implementation of:
2001 - Implementation:
2003/2004 - Implementation:
|
1989-1992 | RSA | Impala Platinum | Overall responsibility for Impala’s Refining Operations i.e. Nickel, Copper and PGM |
1986-1988 | RSA | Impala Platinum | Impala Refinery Operations
|
1983-1985 | RSA | Impala Platinum | Responsible for the nickel and copper refinery operations |
1982-1983 | RSA | Impala Platinum | Responsible for the design and installation of the cobalt refinery at the nickel copper operation. Recovery of cobalt as a metal powder from the nickel refinery barren liquors |
1978-1921 | RSA | Impala Platinum | Responsible for day to day operations of metal production and precious metal concentrate upgrade in the nickel copper Refinery |
1975-1977 | RSA | Impala Platinum | Responsible for commissioning smelter sulfuric acid plant |
1973-1975 | RSA | Impala Platinum | Nickel Copper Refinery – metallurgical support |
1973-1975 | RSA | Impala Platinum | Shift operator in the nickel copper refinery |
Uranium, Lithium, Scandium, Selenium, Tellurium: Project experience – Studies / Reviews / Design
Year | Country | Company | Description |
2018 | AOG Greece | MEAB | Eurare Scandium Demonstration Plant Project. Design of a plant for recovery of Scandium from bauxite residue |
2015-2018 | Jordan | Jordanian Uranium Mining Company (Jumco) | Project Management and design, build, installation and commission a demonstration pilot plant in the Central Jordanian Desert of a uranium ore-to-oxide |
2016 | Turkey | META | Scandium Project. Design of a demonstration plant for recovery of scandium from nickel laterite leach residues |
2013-2017 | ? | Client – Unspecified | Removal of uranium and other radionuclides from a copper concentrate to satisfy international regulations governing the transport, trade and processing by smelting (TTP) of copper concentrates. The ''clean'' concentrate from this process is upgraded in copper content to the extent that TTP costs are reduced significantly. Managed all testwork programs in 2013, 2014 (Pilot Plant 700 hours) and 2015 (Demonstration Plant 3000 hours). Currently providing front end engineering design. |
2013-2015 | Jordan | Jumco | Retained as Process Consultant to guide testwork direction in the development of a technically and economically feasible process for recovering uranium in the Central Desert. Design and overseeing build of Demonstration Plant. |
2010-2016 | Botswana | A-cap Resources | Flowsheet development, Pre-Feasibility Study, Planning Pilot Plant Scope of Work for commencement of DFS. A-Cap Lethlekane Project in Botswana (2010 to current) |
2011 | Namibia | Marenica Energy Ltd | Technical Steering Committee for technology development |
2013 | Jordan | IAEA | Consulting for the processing of uranium from the Central Jordan Region |
2011-2012 | Mauritania/ Guinea | Forte Energy | Uranium Project. Hard primary rock and superficial secondary uranium project development phase providing direction to geometallurgy and hydrometallurgy |
2012 | Algeria | IAEA | Mission to Algeria. Consulting to Centre de Recherche Nucleaire de Draria (CRND) on uranium recovery and processing from and secondary ores in Tahaggart |
2011 | USA | Aurora Energy Ltd | Review of client testwork from Hazen Research |
2011-2012 | Australia | Energy Metals Ltd | Flowsheet development, prefeasibility study and testwork management. Option studies with PLS evaporation for Bigryli Project in NT Australia |
2010 to current | Egypt | IAEA | Mission to Egypt. Consulting to Nuclear Materials Authority (NMA) on uranium recovery and processing from primary and secondary ores in Eastern Desert and Sinai Peninsula. |
2010 | Western Australia | BHP Billiton | Yeelirrie Uranium Project. Review of scoping study |
2010/2011 | Spain | Berkeley Minera Espana | Salamanca Uranium Project. Process and Metallurgy, Client Support. |
2010- 2011 | Namibia | Rossing Uranium | Process consultant for Extract Resources. Process development, pilot plant management and basic engineering data provision to the engineer |
2009 | South Africa | Niger Uranium Studies | Henkries Project. Process consultant – studies, preparations of scope of work for client on African project. |
2009 | South Africa | Gold Fields | Gold Fields Tailings Project Study: uranium, gold and sulphur recovery from tailings. laboratory work scope, basic process engineering support |
2008 | Zambia | Equinox | Uranium Project Review. Consultant for Equinox. Provided Basic Engineering Package (PFS) for Ammonia Lime Boil Recovery Circuit. |
2008 | Central Africa | USA Denison Mines | Mutanga Uranium Project. Study: Ore, Upgrade Leach, CIX to final Uranium oxide product. (+800 hours). |
2006-2008 | Namibia | Langer Heinrich Uranium | Consultant for Langer Heinrich Uranium. LHU Process audit. Review of vanadium and its deportment in the LHU flowsheet. |
2007 | Namibia | Metago Environmental Eng | Review current Rossing tails disposal circuit PFS study and report on high density approach (alternate disposal methods) |
2001-2003 | Namibia | Rossing | Study: Rossing Uranium to install belt filters for the leach solid liquid separations plant upgrade CCD incorporating thickeners and rotoscoops and U3O8 solvent extraction plant |
Batch and Pilot Plant Management Experience
Year | Country | Company | Description |
2018 | Namibia | Celsius Resources | Designed and managed the electrochemically controlled cobalt leach |
2017/18 | South Africa | Anglo Platinum | Testwork management for a copper-over PGM selective electrochemically controlled leach |
2017/2018 | USA | Midas Gold | Extensive batch and pilot campaign on a gold pressure oxidative leach employ in-situ arsenic attenuation process |
2018 | Argentina and Australia | LSC Lithium | Batch testwork in Argentina and batch continuous testing in Australia to confirm an evaporative process to recover lithium from brines and produce a battery grade lithium product (99.98%) |
2015 | Australia | Confidential Client | Preparing to manage a 6 month demonstration plant campaign for upgrading copper concentrate by removing radionuclides to render the material acceptable for trade, transport and smelting |
2015 | Canada | OZ Minerals | Designed and managed a 7 month batch and demonstration scale plant employing an electrochemically controlled copper concentrate upgrade process |
2014 | Australia | Confidential Client | Managed 700 hour pilot plant campaign upgrading a copper concentrate by removing radionuclides to render the material acceptable for trade, transport and smelting |
2010- 2011 | Namibia | Extract Resources | Rossing South Project. Managed two pilot plant campaigns of 1200 hours duration |
2010/ 2011 | Australia | SGS | Pilot plant uranium – ore to oxide pilot plant at SGS (800 + 400 hours) |
2009 | Australia | SGS | Mutanga pilot plant at SGS for uranium (800 hours) |
2008 | Zambia | Denison Mines | Mutanga Uranium Project ore, upgrade leach, CIX to final uranium oxide product (+800 hours) |
2008 | Uganda | Glencore | Mutanda Mine Mumi atmospheric leach copper SX/EW to cobalt plant feed (+400 hours) |
2008 | Various | Iron removal
| |
2008 | Australia | Glencore | Copper SX/EW to cobalt plant feed (400 hours) for Mumi atmospheric leach – Mutanda Mine |
2008 | Australia | BHP Billiton | Ansto pilot plant. Two stage heap leachate to MHP (360 hours) |
2008 | Russia Kazakhstan | Oriel Resources / Mechel | Schevchenko Nickel Project. Atmospheric tank leach of laterite ores to MHP (+800 hours) |
2007 | USA | Formation Capital | Essential Metals Cobalt Project. Production of cobalt metal from copper recovery plant bleeds (+500 hours) |
2006 | DRC | First Quantum Minerals | Kolwezi Musonoi Tailings (KMT) cobalt production of cobalt metal from copper recovery circuit bleed (+500 hours) |
2006/ 2007 | USA | Formation Capital | Essential Metals Project. Nitrogen species catalyzation leaching for copper/cobalt |
2004/ 2005 | Australia | Western Mining Company | WMC Nickel. Pressure leach of mount keith high magnesium nickel concentrates (+700 hours) |
2002 | South Africa | Angloplats | Angloplats Nickel Copper. Production of high grade PGM concentrate and removal of nickel and copper from Angloplats converter matte |
1998/ 1999 | USA | Stillwater Mining Company | SMC Nickel Matte Leach. Recovery of nickel and copper from Stillwater matte and production of high grade PGM concentrate (1400 hours) |
1998 | South Africa | Avmin | Avmin Cobalt Project. Recovery of cobalt from atomised alloy to metal (1400 hours) |
1980-1981 | South Africa | Impala Platinum Refineries | Impala Cobalt Project. Recovery of cobalt as metal powder from nickel refinery barren liquors. (1985) Autoclave flash cooling – piloted this invention |
Commissioning Experience
Year | Company | Description |
2003-2004 | Lonmin | Pressure copper leach autoclave employing flash cooling |
2003 | Angloplats | Thermosyphon effluent evaporation plant for chloride liquors |
2002 | Avmin Chambishi | Zinc impurity removal by solvent extraction |
2001 | Lonmin | Commissioned As, Se, Te removal pressure leach autoclaves |
2000 | SMC | Commissioned copper pressure leach autoclave (ramp up in 30 days) |
1996 | Implats | Venturi scrubber – fine nickel particulates |
1994-1995 | Lonmin | Ruthenium distillation and recovery circuit complete with acidic chloride thermosyphon evaporation |
1988-1992 | Implats | Chlorine pressure leach of PGM concentrate, Pt-Pd SX, Rh-Ir IX, ruthenium distillation in chloride media |
1986-1989 | Implats | Copper nickel matte autoclaves employing flash recycle cooling |
1986 | Implats | Nickel hydrogen reduction autoclave, powder washing briquetting and sintering plant |
1985 | Implats | Ammonium sulphate evaporation/crystallisation plant |
1985 | Implats | Ammonium chloride vent off-gas filter |
1985 | Implats | Pressure iron removal autoclaves |
1985 | Implats | Selenium/tellurium removal and direct electrowinning circuit |
1982 | Implats | Cobalt metal recovery plant |
1977 | Implats | Smelter off gas sulphuric acid plant |
1974 | Implats | Ammonium sulphate crystallization plant |
1974 | Implats | Steam methane gas reforming plant – hydrogen and carbon dioxide plant |