Grenvil Marquis Dunn                        

Principal Engineer

Updated: 11 February 2019

Qualifications

1970        BSc Honours degree in Chemical

                Engineering from

                University of  Cape Town

Professional Affiliations

Pr Eng (RSA)

C Eng (UK)

Fellow of Institution of Chemical Engineers

MSAIMM

Member TMS (AIME)

MSAIChE

Key Skills

  • Consultancy and plant design
  • Flowsheet development
  • Pilot plant testwork campaigns
  • Provide basic engineering process packages including: process flow diagrams and process instrumentation diagrams, design basis, mass balance, equipment lists, motor lists, operating and capital cost, control, philosophy materials selection

Summary of experience

  • 28 years in operations role in Hydrometallurgy
  • 17 years as Director and consultant for own company Hydromet (Pty) Ltd [South Africa] and 2 years for Hydromet WA (Pty) Ltd [Australia]. Working in Nickel, Cobalt, Copper, Uranium, Gold, Lithium and PGMs
  • 8 years in Project Engineering and Management and Consultancy for two companies: Hatch and SRK
  • 2008 to current - Principal Hydrometallurgist for Orway Mineral Consultants (OMC), concurrent with Hydromet (Pty) Ltd.
  • 1998 to current - Project Engineering, Project Management and Consulting roles for various organizations
  • 1971 to 1992 - Pressure Hydrometallurgical operations in various positions at Impala Platinum Base Metal/Precious Metals Refinery in South Africa. From Shift operator, Plant manager, Project manager and General manager

         

Key Commodities

  • Nickel – pressure and atmospheric leaching of concentrates, mattes, and laterite to intermediates and metal
  • Cobalt and Copper – pressure and atmospheric leaching of concentrates, sulphides, oxides etc to intermediates and metal
  • Uranium – alkali and acid processes
  • PGM - recovery and refining
  • Lithium recovery from Salar brines, and refining

Experience

  1. PGMs

  1. Nickel

  1. Cobalt

  1. Copper

  1. Uranium

  1. Selenium and Tellurium

  1. Lithium

Nickel, Cobalt, Copper, Gold: Project experience – Studies/Reviews/Design  

Year

Country

Company

Description

2018

South Africa

Tharisa / Karo

Desk top study options for processing PGM

mattes/concentrates/malloys

2018

South Africa

Senet

Design of a sulfurous acid plant for the Kamoto Copper

Project in DRC

2018

Australia

RCFM

Due diligence assistance for resource capital funds

management. Technical review of Nkamouna project in

Cameroon

2018

South Africa

Anglo

Process and mechanical design of Anglo Platinum

electrochemically controlled pressure leach for the recovery of copper from a PGM containing matte

2018

Australia

Jolimont

Review of the Glyleach process

2017/2018

Australia

OZM

Ongoing testwork support for removal of radionuclides from copper concentrate employing an electrochemically controlled pressure oxidation leach developed by Hydromet  in 2012

2017/2018

Undisclosed

SFA

Review of the Kell Process for SFA

2017/2018

Idaho

Midas

Gold pressure oxidation autoclave design with in-situ arsenic attenuation based on batch and pilot plant testwork managed by Hydromet for Midas Stibnite Gold Project.

2017/2018

Namibia

Celsius

Targeted electrochemically controlled cobalt leach from intergrown cobalt and iron sulfide minerals for Opuwa Cobalt Project

2017

Papua New

Guinea

Goldpu

Desktop study (Capex and Opex) and testwork employing Hydromet electrochemically controlled developed Single Stage Leach on Copper concentrate upgrading copper for Wafi Goldpu Project

2015/2016

Turkey

META

Consulting and commissioning of the nickel pressure acid leach plant

2013-2016

Australia

Oz Minerals

Managed a 700 hour pilot and 5 month demonstration plant confirming the process to remove uranium and its daughter radionuclides from a copper-iron-sulfide concentrate. provided basic engineering data to facilitate two levels of study plus FEED 1 for copper concentrate upgrade project

2015

South Africa

Angloplats Rustenburg

Consulting on the installation of a flash thickener recycle facility for exothermic autoclaves

2015

Turkey

MEAB/

META

Study for the recovery of scandium from the HPAL products for nickel cobalt project

2014

Argentina

Peregrine Metals

Managed batch testwork to confirm the hydrometallurgical process to remove arsenic from copper concentrates so that they can be admitted penalty-free to smelters. Conducted trade off study comparing total oxidation+SX+EW with this upgrade process

2014-2016

Mexico

Cuprosa

Managing testwork and conducting the engineering for an electrochemical process to recover copper and arsenic from a Lead-Copper matte

2014/2015

Zimbabwe

Zimplats

Consulting on the design of the nickel-copper-PGM matte refinery at the BMR

2014/2015

Mexico

Chesapeake Gold Corp

Pre feasibility study: Gold/zinc pressure oxidation plant with Zn SX and Zn EW for Metates gold project

2012

Brazil

Anglo American / SNC Minerconsult

Pre feasibility study: HPAL Nickel Laterite  (Ore to metal). Lead process engineer on their Jacare project

2011/2012

Tanzania

African Eagle

Study:  process consultant, testwork and piloting and basic engineering for their Dutwa Nickel Project

2011-2012

USA

Twin Metals Minnesota/ Antofagasta

Study:  recovery of PGM, Ni, Cu and Co from the Duluth sulphide deposits using Platsol and other relevant processes

2011-2012

USA

Essential Metals/ Formation Capital

Implementation:  copper cobalt pressure leach with CuSX–EW and cobalt precipitation of MHP with releach to cobalt rounds using CoEW recovery in divided cells. Consultant to client and engineer during detailed engineering and construction phase for their Cobalt Plant Project

2011-2012

USA

Stillwater Mining

Study:  base metals and downstream processing of PGM rich concentrates for Nickel Copper Plant

2011

Cameroon

Lycopodium/ OMC

Study:  feasibility study for a cobalt and nickel refinery to its intermediate mixed sulphide precipitate for Nkamouna their project

2011

Western Australia

Equinox

Study:  scoping study – pressure leach option for treatment of Lumwana copper concentrate employing flash thicken recycle process

2009

Brazil

Vale

Study:  process options laterite study for recovery of MHP from laterites and sulphides for Onca Puma Project

2009

Australia

HNC Resources

Study:   Alternate nickel and cobalt recovery circuit on their Browns Oxide Project

2008

Australia

Metallica Metals

Study:  Consultant to the heap leachate-to-MHP base case. Provided Basic Process Engineering Package to Study Engineer for their Nornico Nickel Laterite Project

2007/2008

DRC

Glencore

Mutanda Mine – Mumi copper/cobalt project.

study:  Provided basic process engineering package for the feasibility study

2007/2008

Kazakhstan Russia

Oriel Resources

Schevchenko Nickel Laterite Project study:  provided Basic Engineering Package for DFS for demonstration plant – consultant to client  

2006-2008

DRC

FQM

Kolwezi Musonoi Tailings (KMT) project study:  atmospheric leach - copper SX and EW, cobalt to MHP and recovery to metal. Provided PFS Basic Engineering Package for hydrometallurgical plant – tailings to cobalt/copper metal.  Process design for leach, sulphur dioxide contacting, reflux, iron removal and cobalt semi product. Detailed design for cobalt refinery

2007

RSA

RSA

Braemore Resources ConRoast Project study:  responsible for the development of the BMR recovery process. Directed the base metal and PGM recovery testwork.  Provided PFS Basic Engineering Package for the nickel, copper, cobalt recovery circuit treating an alloy to produce a high grade (+65% PGM) concentrate copper by EW and (Ni and Co) to MHP

2006-2007

Zambia

FQM

Kansanshi Copper Project Study:  Provided Basic Engineering Package for the copper circuit concentrate POX employing the Flash Thicken Recycle concept to increase the existing autoclave capacity

2007

Australia

Lionore

Avalon Phase 1 Project study: For processing of Honeymoon Well concentrates at the reconfigured Bulong Nickel Plant Kalgoorlie for nickel concentrate pressure leaching in saline waters to produce nickel cathode

2007

DRC

Camec PLC

Luita Copper and Cobalt EW Project study: Provided a process design package for the copper and cobalt electrowinning

2006

USA

Stillwater

Mining

Implementation: Detailed Mechanical Design and assist in construction of new alloy autoclave vessel for nickel/copper pressure leach for SMC’s Autoclave Design Project

2006

USA

Augusta Resources

Copper Molybdenum Project study: Provided PFS Basic Engineering Package for copper pressure leach, solvent extraction and electrowinning

2002/2004

Zambia

Avmin

Chambishi Cobalt Recovery Plant Project implementation: Design cobalt recovery plant including iron removal, zinc solvent extraction, cobalt MHP and resolution

2002/2004

Zambia

Avmin

Chambishi Pressure Leach autoclave upgrade project

study into explosions with pressure leach autoclave andandand provided a basic engineering package for the autoclave upgrade for safe operations  

2002/2003

Murrin

Murrin

Anaconda Nickel Project Litigation - mixed sulfides and refinery circuits for nickel and cobalt recovery  

2002/2005

Australia

Western Mining Company

Study: Engineering Feasibility Study for MKO pressure leach and concentrate leach of Ni Sulfides. Design cobalt recovery plant including iron removal, zinc solvent extraction, cobalt MHP and resolution

2000/2002

USA

Hatch Consulting Company

For Stillwater Mining Company implementation: Upgrade of the Stillwater Platinum Base Metal Refinery in Montana USA - recovery of nickel and copper from matte and production of high grade PGM concentrate. Commissioned copper pressure leach autoclave

1994/1995

Zimbabwe

SRK

Hartley Base Metal Refinery Implementation: Responsible for the process design producing high grade PGM concentrate, nickel and copper by-products involving atmospheric leaching, pressure oxidation of sulfides with front flash cooling, nickel and copper PLS purification and Electrowinning

1992-2004

RSA

SRK

Lonmin Projects

1992 – 1994   Implementation of:        

  • Upgrading and Increasing the capacity of the Base Metal Refinery Autoclaves employing the Front Flash Cooling technique which I pioneered in the mid 80s
  • Increased recovery of nickel in atmospheric leach from 60% to over 85%
  • Modified pressure leach process to reduce PGM dissolution and in a single step to upgrade PGM from ± 0.7% to 65%
  • Improved selenium and tellurium removal step to produce ‘on-spec’ copper.
  • Chlorine Pressure Leach Plant – for Platinum Refinery
  • Ruthenium and recovery circuit with acidic thermosyphon evaporation
  • PGM Solvent Extraction Plant
  • Design and engineering of the doubling of capacity of the BMR POX autoclaves to produce high grade PGM concentrate from smelter matte

2001 - Implementation:

  • Pressure leach plant to recover/remove metalloids (As, Si and Te) from concentrate

2003/2004 - Implementation:

  • 50% capacity upgrade for Lonmin Base Metal Refinery

1989-1992

RSA

Impala Platinum

Overall responsibility for Impala’s Refining Operations i.e. Nickel, Copper and PGM

1986-1988

RSA

Impala

Platinum

Impala Refinery Operations

  • Responsible for 5th electric furnace at the Smelter
  • Responsible for all refinery expansion in the Nickel/ Copper  Refinery
  • Upgrade of platinum refinery for recovery of base metal and metalloid without co-extraction of PGMs.
  • Design and commissioned the conversion of POX autoclaves from air to oxygen pressure leach
  • Implemented the autoclave flash-cooling technology

1983-1985

RSA

Impala Platinum

Responsible for the nickel and copper refinery operations

1982-1983

RSA

Impala Platinum

Responsible for the design and installation of the cobalt refinery at the nickel copper operation. Recovery of cobalt as a metal powder from the nickel refinery barren liquors

1978-1921

RSA

Impala Platinum

Responsible for day to day operations of metal production and precious metal concentrate upgrade in the nickel copper Refinery

1975-1977

RSA

Impala Platinum

Responsible for commissioning smelter sulfuric acid plant

1973-1975

RSA

Impala Platinum

Nickel Copper Refinery – metallurgical support

1973-1975

RSA

Impala Platinum

Shift operator in the nickel copper refinery

 

Uranium, Lithium, Scandium, Selenium, Tellurium: Project experience – Studies / Reviews / Design  

Year

Country

Company

Description

2018

AOG Greece

MEAB

Eurare Scandium Demonstration Plant Project. Design of a plant for recovery of Scandium from bauxite residue

2015-2018

Jordan

Jordanian Uranium Mining Company

(Jumco)

Project Management and design, build, installation and commission a demonstration pilot plant in the Central Jordanian Desert of a uranium ore-to-oxide

2016

Turkey

META

Scandium Project. Design of a demonstration plant for recovery of scandium from nickel laterite leach residues

2013-2017

?

Client – Unspecified

Removal of uranium and other radionuclides from a copper concentrate to satisfy international regulations governing the transport, trade and processing by smelting (TTP) of copper concentrates. The ''clean'' concentrate from this process is upgraded in copper content to the extent that TTP costs are reduced significantly. Managed all testwork programs in 2013, 2014 (Pilot Plant 700 hours) and 2015 (Demonstration Plant 3000 hours). Currently providing front end engineering design.

2013-2015

Jordan

Jumco

Retained as Process Consultant to guide testwork direction in the development of a technically and economically feasible process for recovering uranium in the Central Desert. Design and overseeing build of Demonstration Plant.

2010-2016

Botswana

A-cap Resources

Flowsheet development, Pre-Feasibility Study, Planning Pilot Plant Scope of Work for commencement of DFS. A-Cap Lethlekane Project in Botswana (2010 to current)

2011

Namibia

Marenica Energy Ltd

Technical Steering Committee for technology development

2013

Jordan

IAEA

Consulting for the processing of uranium from the Central Jordan Region

2011-2012

Mauritania/

Guinea

Forte Energy

Uranium Project. Hard primary rock and superficial secondary uranium project development phase providing direction to geometallurgy and hydrometallurgy

2012

Algeria

IAEA

Mission to Algeria. Consulting to Centre de Recherche Nucleaire de Draria (CRND) on uranium recovery and processing from and secondary ores in Tahaggart

2011

USA

Aurora Energy Ltd

Review of client testwork from Hazen Research

2011-2012

Australia

Energy Metals  Ltd

Flowsheet development, prefeasibility study and testwork management. Option studies with PLS evaporation for Bigryli Project in NT Australia

2010 to current

Egypt

IAEA

Mission to Egypt. Consulting to Nuclear Materials Authority (NMA) on uranium recovery and processing from primary and secondary ores in Eastern Desert and Sinai Peninsula.

2010

Western Australia

BHP Billiton

Yeelirrie Uranium Project. Review of scoping study

2010/2011

Spain

Berkeley Minera Espana

Salamanca Uranium Project. Process and Metallurgy, Client Support.

2010-

2011

Namibia

Rossing Uranium

Process consultant for Extract Resources.   Process development, pilot plant management and basic engineering data provision to the engineer

2009

South Africa

Niger Uranium Studies

Henkries Project. Process consultant – studies, preparations of scope of work for client on African project.

2009

South Africa

Gold Fields

Gold Fields Tailings Project  Study: uranium, gold and sulphur recovery from tailings. laboratory work scope, basic process engineering support

2008

Zambia

Equinox

Uranium Project Review. Consultant for Equinox.  Provided Basic Engineering Package (PFS) for Ammonia Lime Boil Recovery Circuit.

2008

Central Africa

USA Denison Mines

Mutanga Uranium Project. Study: Ore, Upgrade Leach, CIX to final Uranium oxide product. (+800 hours).

2006-2008

Namibia

Langer Heinrich Uranium

Consultant for Langer Heinrich Uranium. LHU Process audit.  Review of vanadium and its deportment in the LHU flowsheet.

2007

Namibia

Metago Environmental Eng

Review current Rossing tails disposal circuit PFS study and report on high density approach (alternate disposal methods)

2001-2003

Namibia

Rossing

Study: Rossing Uranium to install belt filters for the leach solid liquid separations plant upgrade CCD incorporating thickeners and rotoscoops and U3O8 solvent extraction plant

Batch and Pilot Plant Management Experience

Year

Country

Company

Description

2018

Namibia

Celsius Resources

Designed and managed the electrochemically controlled cobalt leach

2017/18

South Africa

Anglo

Platinum

Testwork management for a copper-over PGM selective electrochemically controlled leach

2017/2018

USA

Midas Gold

Extensive batch and pilot campaign on a gold pressure oxidative leach employ in-situ arsenic attenuation process

2018

Argentina and Australia

LSC Lithium

Batch testwork in Argentina and batch continuous testing in Australia to confirm an evaporative process to recover lithium from brines and produce a battery grade lithium product (99.98%)

2015

Australia

Confidential Client

Preparing to manage a 6 month demonstration plant campaign for upgrading copper concentrate by removing radionuclides to render the material acceptable for trade, transport and smelting

2015

Canada

OZ Minerals

Designed and managed a 7 month batch and demonstration scale plant employing an electrochemically controlled copper concentrate upgrade process

2014

Australia

Confidential Client

Managed 700 hour pilot plant campaign upgrading a copper concentrate by removing radionuclides to render the material acceptable for trade, transport and smelting

2010-

2011

Namibia

Extract Resources

Rossing South Project. Managed two pilot plant campaigns of 1200 hours duration

2010/

2011

Australia

SGS

Pilot plant uranium – ore to oxide pilot plant at SGS (800 + 400 hours)

2009

Australia

SGS

Mutanga pilot plant at SGS for uranium (800 hours)

2008

Zambia

Denison Mines

Mutanga Uranium Project ore, upgrade leach, CIX to final uranium oxide product (+800 hours)

2008

Uganda

Glencore

Mutanda Mine Mumi atmospheric leach copper SX/EW to cobalt plant feed (+400 hours)

2008

Various

Iron removal

  • Atmospheric high density iron-aluminium sludge
  • High density iron removal process from nickel and cobalt sulfates
  • High density iron removal process from nickel laterite leachates (3 of 120 hours).

2008

Australia

Glencore

Copper SX/EW to cobalt plant feed (400 hours) for Mumi atmospheric leach – Mutanda Mine

2008

Australia

BHP Billiton

Ansto pilot plant. Two stage heap leachate to MHP (360 hours)  

2008

Russia Kazakhstan

Oriel Resources / Mechel

Schevchenko Nickel Project. Atmospheric tank leach of laterite ores to MHP (+800 hours)

2007

USA

Formation Capital

Essential Metals Cobalt Project. Production of cobalt metal from copper recovery plant bleeds (+500 hours)

2006

DRC

First Quantum Minerals

Kolwezi Musonoi Tailings (KMT) cobalt  production of cobalt metal from copper recovery circuit bleed (+500 hours)

2006/

2007

USA

Formation Capital

Essential Metals Project. Nitrogen species catalyzation leaching for copper/cobalt

2004/

2005

Australia

Western Mining Company

WMC Nickel. Pressure leach of mount keith high magnesium nickel concentrates (+700 hours)

2002

South Africa

Angloplats

Angloplats Nickel Copper. Production of high grade PGM concentrate and removal of nickel and copper from Angloplats converter matte

1998/

1999

USA

Stillwater Mining Company

SMC Nickel Matte Leach. Recovery of nickel and copper from Stillwater matte and production of high grade PGM concentrate (1400 hours)

1998

South Africa

Avmin

Avmin Cobalt Project. Recovery of cobalt from atomised alloy to metal (1400 hours)  

1980-1981

South Africa

Impala Platinum Refineries

Impala Cobalt Project. Recovery of cobalt as metal powder from nickel refinery barren liquors.

(1985)   Autoclave flash cooling – piloted this invention

Commissioning Experience

Year

Company

Description

2003-2004

Lonmin

Pressure copper leach autoclave employing flash cooling

2003

Angloplats

Thermosyphon effluent evaporation plant for chloride liquors         

2002

Avmin Chambishi

Zinc impurity removal by solvent extraction         

2001

Lonmin

Commissioned As, Se, Te removal pressure leach autoclaves

2000

SMC

Commissioned copper pressure leach autoclave

(ramp up in 30 days)         

1996

Implats

Venturi scrubber – fine nickel particulates         

1994-1995

Lonmin

Ruthenium distillation and recovery circuit complete with acidic

chloride thermosyphon evaporation

1988-1992

Implats

Chlorine pressure leach of PGM concentrate, Pt-Pd SX, Rh-Ir IX,

ruthenium distillation in chloride media

1986-1989

Implats

Copper nickel matte autoclaves employing flash recycle cooling

1986

Implats

Nickel hydrogen reduction autoclave, powder washing briquetting and sintering plant

1985

Implats

Ammonium sulphate evaporation/crystallisation plant        

1985

Implats

Ammonium chloride vent off-gas filter        

1985

Implats

Pressure iron removal autoclaves

1985

Implats

Selenium/tellurium removal and direct electrowinning circuit        

1982

Implats

Cobalt metal recovery plant

1977

Implats

Smelter off gas sulphuric acid plant        

1974

Implats

Ammonium sulphate crystallization plant

1974

Implats

Steam methane gas reforming plant – hydrogen and carbon dioxide plant