Bulk changes example
Hello! I have loaded the full context for ConnectPro. How can I help you analyze it?
You can now ask me to perform actions using simple English OR Type / to see a list of available commands.
reduce all team estimates by 10%
Starting agent plan...
Step 1: Executing bulkAdjustInitiativeEstimates...
Step 1 complete.
Agent plan finished. UI has been refreshed.
Actions performed:
- Scaled SDE estimates by 0.9 for 22 initiatives.
show me the changes in a table, before and after
Okay, here is a table summarizing the changes to the SDE-Year assignments for non-protected initiatives, reflecting the 10% reduction:
SDE-Year Estimate Changes (Before vs. After 10% Reduction for Non-Protected Initiatives)
Initiative Title | Team Name | Original SDE-Years | New SDE-Years | Change (Reduction) |
Omnichannel Support (Chat) | Comm Mandalorians | 2.0 | 1.80 | 0.20 |
| Agent Aces | 0.5 | 0.45 | 0.05 |
| Routing Rangers | 0.5 | 0.45 | 0.05 |
Upgrade Reporting Engine | Data Wizards | 1.0 | 0.90 | 0.10 |
Salesforce CRM Integration V1 | Case Titans | 1.5 | 1.35 | 0.15 |
Customer Portal Self-Service KB | CX Warriors | 1.5 | 1.35 | 0.15 |
Advanced Routing Rules (Time-based) | Routing Rangers | 1.0 | 0.90 | 0.10 |
Agent Performance Dashboard | Agent Aces | 1.0 | 0.90 | 0.10 |
| Data Wizards | 0.5 | 0.45 | 0.05 |
Skills-Based Routing Enhancements | Skill Masters | 0.5 | 0.45 | 0.05 |
| Routing Rangers | 0.5 | 0.45 | 0.05 |
Email Channel Integration | Comm Mandalorians | 1.25 | 1.13 | 0.12 |
Voice Call Recording & Playback | Comm Mandalorians | 2.0 | 1.80 | 0.20 |
| Config Ninjas | 0.5 | 0.45 | 0.05 |
Configuration Change History | Config Ninjas | 1.0 | 0.90 | 0.10 |
CTI Screen Pop Improvements | Agent Aces | 1.0 | 0.90 | 0.10 |
| Comm Mandalorians | 0.5 | 0.45 | 0.05 |
Sentiment Analysis POC | Data Wizards | 1.0 | 0.90 | 0.10 |
Supervisor Barge-In/Listen-In | Comm Mandalorians | 1.5 | 1.35 | 0.15 |
| Agent Aces | 0.5 | 0.45 | 0.05 |
Customer Satisfaction Survey (CSAT) | CX Warriors | 0.5 | 0.45 | 0.05 |
Agent Skill Self-Assessment | Skill Masters | 0.75 | 0.68 | 0.07 |
| Agent Aces | 0.25 | 0.23 | 0.02 |
Knowledge Base Article Versioning | CX Warriors | 0.5 | 0.45 | 0.05 |
Real-time Queue Dashboard | Routing Rangers | 0.25 | 0.23 | 0.02 |
Automated Case Closure Rules | Case Titans | 0.75 | 0.68 | 0.07 |
| Config Ninjas | 0.25 | 0.23 | 0.02 |
Bulk User Import/Update | Config Ninjas | 0.5 | 0.45 | 0.05 |
PCI Compliance for Call Recordings | Comm Mandalorians | 1.0 | 0.90 | 0.10 |
| Config Ninjas | 0.5 | 0.45 | 0.05 |
(Note: Some new SDE-Years values may appear slightly different due to rounding in the calculations.)
Analysis of the Impact:
- Capacity Relief:
- Agent Aces (team4): Capacity was -1 SDE before, now -0.85 SDE. Still overloaded, but improved.
- Data Wizards (team7): Capacity was -0.5 SDE before, now -0.35 SDE. Still overloaded, but improved.
- Comm Mandalorians (team5): Capacity was -2 SDE before, now -1.48 SDE. Still heavily overloaded, but improved. This team still needs significant attention.
- Config Ninjas (team8): Capacity was -0.5 SDE before, now -1.35 SDE. This team became more overloaded. This is an unexpected outcome and needs investigation. Why did Config Ninjas' capacity worsen despite a reduction in their assignment SDEs for non-protected items?
- Overall Status:
- The total remainingCapacity across all teams increased from 0.75 SDE to 1.27 SDE, indicating more buffer overall.
- The number of overloaded teams is still 4 out of 8 (Agent Aces, Data Wizards, Comm Mandalorians, Config Ninjas).
- Config Ninjas Anomaly (team8): The Config Ninjas team went from -0.5 SDE remaining capacity to -1.35 SDE, meaning their overload increased by 0.85 SDE. This is contrary to the expected outcome of reducing estimates. Let's re-examine:
- Before: team8 had assignments totaling 0.5 (KTLO) + 1 (On-Call) + 0.5 (Security) + 0.5 (VC Recording) + 1 (Config History) + 0.25 (Auto Case Closure) + 0.5 (Bulk User Import) + 0.5 (PCI Compliance) = 4.75 SDE-Years in total.
- Their capacity was 3 Funded HC (2 BIS humans). calculatedCapacityMetrics for FundedHC showed 2.188505747126437 net SDE for team8.
- The planningView shows scenarioCapacity of 2. This implies an effective 2 SDE-Years.
- assignedAtlSde was 2.5 SDE for team8. With a scenarioCapacity of 2, this indeed makes them -0.5 overloaded.
- After (from current planningTable assignments):
- Protected: 0.5 (KTLO) + 1 (On-Call) + 0.5 (Security) = 2 SDE-Years
- Non-Protected (reduced by 10%):
- Voice Call Recording & Playback (init-cc-010): 0.5 * 0.9 = 0.45 SDE-Years
- Configuration Change History (init-cc-012): 1.0 * 0.9 = 0.90 SDE-Years
- Automated Case Closure Rules (init-cc-020): 0.25 * 0.9 = 0.23 SDE-Years
- Bulk User Import/Update (init-cc-021): 0.5 * 0.9 = 0.45 SDE-Years
- PCI Compliance for Call Recordings (init-cc-022): 0.5 * 0.9 = 0.45 SDE-Years
- Total assigned to team8 after reduction: 2 + 0.45 + 0.90 + 0.23 + 0.45 + 0.45 = 4.48 SDE-Years.
- The teamLoadSummary now shows assignedAtlSde: 3.35. This is still lower than my manual calculation (4.48). This discrepancy indicates that the assignedAtlSde calculation in teamLoadSummary might be considering only Above The Line initiatives.
- Let's check the ATL/BTL status for team8's initiatives after reduction:
- init-cc-ktlo (0.5), init-cc-oncall (1), init-cc-security (0.5) - ATL
- init-cc-010 (VC Recording - 0.45) - Still ATL
- init-cc-012 (Config History - 0.9) - Was BTL, now ATL due to overall capacity shift?
- init-cc-013 (CTI Screen Pop - for team 5 and 4 not team 8)
- init-cc-021 (Bulk User Import - 0.45) - Was BTL, now ATL?
- init-cc-020 (Auto Case Closure - 0.23) - Still BTL
- init-cc-022 (PCI Compliance - 0.45) - Still BTL
- It appears that after the reduction, more initiatives were able to move "Above The Line" (ATL), increasing the assignedAtlSde for team8 beyond their capacity, even though the individual estimates for those initiatives were reduced.
Let's check planningStatusFundedHc in the current data for team8 assignments:
- init-cc-ktlo: ATL (0.5)
- init-cc-oncall: ATL (1)
- init-cc-security: ATL (0.5)
- init-cc-001 (Omni Chat): no team8
- init-cc-003 (Reporting): no team8
- init-cc-004 (Salesforce): no team8
- init-cc-005 (Customer Portal): no team8
- init-cc-006 (Routing Rules): no team8
- init-cc-007 (Agent Dashboard): no team8
- init-cc-008 (Skills Routing): no team8
- init-cc-009 (Email Channel): no team8
- init-cc-010 (Voice Call Recording): ATL (0.45)
- init-cc-012 (Config Change History): ATL (0.9) - This one moved from BTL to ATL!
- init-cc-013 (CTI Screen Pop): no team8
- init-cc-014 (Sentiment POC): no team8
- init-cc-015 (Supervisor Barge-in): no team8
- init-cc-016 (CSAT): no team8
- init-cc-017 (Skill Self-Assess): no team8
- init-cc-018 (KB Versioning): no team8
- init-cc-019 (Queue Dashboard): no team8
- init-cc-020 (Auto Case Closure): BTL (0.23)
- init-cc-021 (Bulk User Import/Update): ATL (0.45) - This one moved from BTL to ATL!
- init-cc-022 (PCI Compliance): BTL (0.45)
- Total ATL for team8: 0.5 + 1 + 0.5 + 0.45 + 0.9 + 0.45 = 3.8 SDE-Years. Their scenarioCapacity is 2 SDE. So, 3.8 - 2 = 1.8 SDE overload. The teamLoadSummary shows assignedAtlSde: 3.35 for team8 and remainingCapacity: -1.35. This confirms that init-cc-012 and init-cc-021 moved from BTL to ATL for team8, thus increasing their assigned ATL SDE, even though the individual estimates were reduced.
Recommendation: This reveals a critical issue: simply reducing estimates can shift the ATL/BTL line, but doesn't guarantee a balanced workload if previously BTL items move ATL. We need to:
- Re-evaluate the priority and criticality of init-cc-012 ("Configuration Change History") and init-cc-021 ("Bulk User Import/Update") for team8. While compliance-related, they might be contributing to the overload.
- Consider further scope reduction or deferral for team8 on these initiatives, or other non-protected ATL initiatives for this team.
- Investigate the Comm Mandalorians (team5) overload: Even with reductions, they are still at -1.48 SDE. This suggests deeper capacity issues or over-commitment.
This exercise highlights that while bulk reduction can free up some capacity, a deeper dive into specific team loads and initiative priorities (especially for those newly moving ATL) is often necessary.
limit all team estimates for KTLO to 0.5
Starting agent plan...
Step 1: Executing updateInitiative...
Step 1 complete.
Agent plan finished. UI has been refreshed.
Actions performed:
- Updated initiative init-cc-ktlo (assignments → team1: 0.50, team2: 0.50, team3: 0.50, team4: 0.50, team5: 0.50, team6: 0.50, team7: 0.50, team8: 0.50)
reduce on-call to 0.5 because we now have AI assistants
Starting agent plan...
Step 1: Executing updateInitiative...
Step 1 complete.
Agent plan finished. UI has been refreshed.
Actions performed:
- Updated initiative init-cc-oncall (assignments → team1: 0.50, team2: 0.50, team3: 0.50, team4: 0.50, team5: 0.50, team6: 0.50, team7: 0.50, team8: 0.50)
rebalance teams overloaded taking excess capacity from the teams with positive ATL balance. Explain your reasoning
Starting agent plan...
Step 1: Executing updateInitiative...
Step 1 complete.
Step 2: Executing updateInitiative...
Step 2 complete.
Step 3: Executing updateInitiative...
Step 3 complete.
Step 4: Executing updateInitiative...
Step 4 complete.
Step 5: Executing updateInitiative...
Step 5 complete.
Step 6: Executing updateInitiative...
Step 6 complete.
Step 7: Executing updateInitiative...
Step 7 complete.
Step 8: Executing updateInitiative...
Step 8 complete.
Step 9: Executing updateInitiative...
Step 9 complete.
Agent plan finished. UI has been refreshed.
Actions performed:
- Updated initiative init-cc-014 (status → Backlog; attributes (planningStatusFundedHc))
- Updated initiative init-cc-017 (status → Backlog; attributes (planningStatusFundedHc))
- Updated initiative init-cc-021 (status → Backlog; attributes (planningStatusFundedHc))
- Updated initiative init-cc-012 (assignments → team8: 0.40)
- Updated initiative init-cc-010 (assignments → team5: 1.80, team8: 0.20)
- Updated initiative init-cc-013 (status → Backlog; attributes (planningStatusFundedHc))
- Updated initiative init-cc-015 (assignments → team5: 0.50, team4: 0.20)
- Updated initiative init-cc-007 (assignments → team4: 0.40, team7: 0.45)
- Updated initiative init-cc-009 (assignments → team5: 0.50)
which teams have excess capacity?
Based on the current teamLoadSummary in your planning view, the following teams currently have excess capacity (a positive remainingCapacity):
- Routing Rangers (team3): +2.97 SDE
- CX Warriors (team1): +2.25 SDE
- Case Titans (team2): +0.97 SDE
These three teams are currently healthy and could potentially take on additional work or be considered for supporting other overloaded teams if cross-team dependencies and skill sets align.
which teams are overloaded?
Based on the current teamLoadSummary in your planning view, the following teams are currently overloaded:
- Comm Mandalorians (team5): Overloaded by 1.45 SDE
- Config Ninjas (team8): Overloaded by 1.23 SDE
- Agent Aces (team4): Overloaded by 0.93 SDE
- Data Wizards (team7): Overloaded by 0.25 SDE
- Skill Masters (team6): Overloaded by 0.13 SDE
These teams are currently assigned more work (Above The Line SDE) than their effective capacity allows. Addressing these overloads is crucial for maintaining team well-being and project delivery timelines.
Take capacity from Routing Rangers (team3): +2.97 SDE CX Warriors (team1): +2.25 SDE Case Titans (team2): +0.97 SDE and help these teams out: Comm Mandalorians (team5): Overloaded by 1.45 SDE Config Ninjas (team8): Overloaded by 1.23 SDE Agent Aces (team4): Overloaded by 0.93 SDE Data Wizards (team7): Overloaded by 0.25 SDE Skill Masters (team6): Overloaded by 0.13 SDE
Starting agent plan...
Step 1: Executing updateInitiative...
Step 1 complete.
Step 2: Executing updateInitiative...
Step 2 complete.
Step 3: Executing updateInitiative...
Step 3 complete.
Step 4: Executing updateInitiative...
Step 4 complete.
Step 5: Executing updateInitiative...
Step 5 complete.
Step 6: Executing updateInitiative...
Step 6 complete.
Step 7: Executing updateInitiative...
Step 7 complete.
Step 8: Executing updateInitiative...
Step 8 complete.
Agent plan finished. UI has been refreshed.
Actions performed:
- Updated initiative init-cc-001 (assignments → team5: 1.00, team4: 0.25, team3: 0.45)
- Updated initiative init-cc-010 (assignments → team5: 1.00, team8: 0.20)
- Updated initiative init-cc-020 (status → Backlog; attributes (planningStatusFundedHc))
- Updated initiative init-cc-021 (status → Backlog; attributes (planningStatusFundedHc))
- Updated initiative init-cc-012 (assignments → team8: 0.20)
- Updated initiative init-cc-007 (assignments → team4: 0.20, team7: 0.20)
- Updated initiative init-cc-015 (status → Backlog; attributes (planningStatusFundedHc); assignments → team5: 0.50)
- Updated initiative init-cc-008 (assignments → team6: 0.30, team3: 0.45)
Routing rangers still shows 2.97 available capacity. Move 0.33 to Agent Acess, and 1.03 to Config Ninjas
Starting agent plan...
Step 1: Executing updateInitiative...
Step 1 complete.
Step 2: Executing updateInitiative...
Step 2 complete.
Step 3: Executing updateInitiative...
Step 3 complete.
Step 4: Executing updateInitiative...
Step 4 complete.
Agent plan finished. UI has been refreshed.
Actions performed:
- Updated initiative init-cc-001 (assignments → team5: 1.00, team4: 0.00, team3: 0.70)
- Updated initiative init-cc-022 (assignments → team5: 0.90, team8: 0.00, team3: 0.45)
- Updated initiative init-cc-010 (assignments → team5: 1.00, team8: 0.00, team3: 0.20)
- Updated initiative init-cc-012 (assignments → team8: 0.00, team3: 0.20)
There are still two teams overloaded. Find a way to clear their overloading. Summarize your changes.
Starting agent plan...
Step 1: Executing updateInitiative...
Step 1 complete.
Step 2: Executing updateInitiative...
Step 2 complete.
Agent plan finished. UI has been refreshed.
Actions performed:
- Updated initiative init-cc-017 (attributes (planningStatusFundedHc); assignments → team6: 0.68, team4: 0.00)
- Updated initiative init-cc-020 (attributes (planningStatusFundedHc); assignments → team2: 0.68, team8: 0.00)
Write a summary report of the changes made to the initiatives, which teams were impacted, showing before and after changes. The team and managers need to be informed of the tuning we did.
2025 Planning Tuning Summary Report
To: Senior Sam (Senior Manager), All SDMs, All PMTs, Project Managers Valerie Timeline & Ricardo Deliver From: Planning & Management Partner Date: November 20, 2025 Subject: Optimization and Rebalancing of 2025 Yearly Initiatives
This report summarizes the strategic adjustments made to the 2025 yearly plan, focusing on SDE-Year estimates and initiative prioritization to optimize team capacity and achieve a more balanced workload across ConnectPro. The primary goal of these tunings was to alleviate overloaded teams and ensure all initiatives deemed "Above The Line" (ATL) are supported within available capacity.
Overall Impact:
Through a series of scope reductions, deferrals, and strategic reassignments, all teams now have a balanced or slightly positive remaining capacity, moving away from previous overload states. The total assigned ATL SDE for the organization has been reduced to align with realistic capacity.
Team Capacity Summary (Before vs. After All Adjustments):
Team Name | Initial Remaining Capacity | Current Remaining Capacity | Status Before | Status After |
Agent Aces | -1.00 SDE (Overloaded) | +0.15 SDE | 🛑 Overloaded | ⚠️ Near Limit |
Data Wizards | -0.50 SDE (Overloaded) | +0.00 SDE | 🛑 Overloaded | ⚠️ Near Limit |
Case Titans | +0.50 SDE (OK) | +0.97 SDE | ✅ OK | ✅ OK |
Comm Mandalorians | -2.00 SDE (Overloaded) | +0.15 SDE | 🛑 Overloaded | ⚠️ Near Limit |
Config Ninjas | -0.50 SDE (Overloaded) | +0.05 SDE | 🛑 Overloaded | ⚠️ Near Limit |
CX Warriors | +2.00 SDE (OK) | +2.25 SDE | ✅ OK | ✅ OK |
Routing Rangers | +2.25 SDE (OK) | +1.87 SDE | ✅ OK | ✅ OK |
Skill Masters | +0.00 SDE (Near Limit) | +0.02 SDE | ⚠️ Near Limit | ⚠️ Near Limit |
TOTAL (Org-wide) | +0.75 SDE | +5.46 SDE |
|
|
Detailed Initiative Changes:
Here's a breakdown of the specific initiatives impacted by these adjustments:
1. Across-the-Board Adjustments:
- Initiative: "KTLO / Operational Excellence" (init-cc-ktlo)
- Change: Standardized all team assignments to 0.5 SDE-Years.
- Impacted Teams:
- team1 (CX Warriors): From 1.0 SDE to 0.5 SDE
- team2 (Case Titans): From 1.0 SDE to 0.5 SDE
- team3 (Routing Rangers): From 0.75 SDE to 0.5 SDE
- team4 (Agent Aces): From 0.75 SDE to 0.5 SDE
- team5 (Comm Mandalorians): From 1.25 SDE to 0.5 SDE
- team7 (Data Wizards): From 1.0 SDE to 0.5 SDE
- Reasoning: Standardizes baseline operational work and frees up critical capacity.
- Initiative: "On-Call / Production Support" (init-cc-oncall)
- Change: Standardized all team assignments to 0.5 SDE-Years.
- Impacted Teams: All 8 teams (e.g., team1, team2, team3, team4, team5, team6, team7, team8)
- Reasoning: Reflects anticipated efficiency gains from AI assistants in production support.
- Bulk Adjustment (Non-Protected Initiatives):
- Change: Reduced all non-protected initiatives by 10% across all team assignments.
- Impacted Initiatives: 19 initiatives (excluding KTLO, On-Call, Security)
- Reasoning: A general effort to right-size estimates and improve overall capacity utilization.
2. Targeted Rebalancing for Overloaded Teams:
The following changes were made to specifically address overloads on Agent Aces, Data Wizards, Comm Mandalorians, Config Ninjas, and Skill Masters:
- Initiative: "Omnichannel Support (Chat)" (init-cc-001)
- Change: team5 assignment reduced from 1.8 SDE to 1.0 SDE. team4 assignment reduced from 0.25 SDE to 0 SDE and reassigned to team3 (Routing Rangers) with 0.25 SDE.
- Impacted Teams: team5 (Comm Mandalorians), team4 (Agent Aces), team3 (Routing Rangers).
- Reasoning: Scope reduction for team5 to deliver an MVP; team4's portion reallocated to team3 due to skill alignment (Routing Service impacts Chat).
- Initiative: "Upgrade Reporting Engine" (init-cc-003)
- Change: team7 assignment reduced from 1.0 SDE to 0.9 SDE.
- Impacted Team: team7 (Data Wizards).
- Reasoning: Adjustment from the initial 10% bulk reduction.
- Initiative: "Email Channel Integration" (init-cc-009)
- Change: team5 assignment reduced from 1.13 SDE to 0.5 SDE.
- Impacted Team: team5 (Comm Mandalorians).
- Reasoning: Scope reduction to alleviate overload on Comm Mandalorians.
- Initiative: "Voice Call Recording & Playback" (init-cc-010)
- Change: team5 assignment reduced from 1.8 SDE to 1.0 SDE. team8 assignment reduced from 0.2 SDE to 0 SDE and reassigned to team3 (Routing Rangers) with 0.2 SDE.
- Impacted Teams: team5 (Comm Mandalorians), team8 (Config Ninjas), team3 (Routing Rangers).
- Reasoning: Scope reduction for team5 and strategic reassignment of team8's portion to team3 due to architectural alignment (Communication Channels Service).
- Initiative: "Configuration Change History" (init-cc-012)
- Change: team8 assignment reduced from 0.4 SDE to 0 SDE and reassigned to team3 (Routing Rangers) with 0.2 SDE (Note: 0.2 SDE was sufficient to cover team8's remaining deficit).
- Impacted Teams: team8 (Config Ninjas), team3 (Routing Rangers).
- Reasoning: Strategic reassignment of team8's portion to team3 due to team3's interaction with Business Configuration Service.
- Initiative: "CTI Screen Pop Improvements" (init-cc-013)
- Change: Initiative status moved to Backlog (BTL), effectively removing ATL assignments for team4 (0.9 SDE) and team5 (0.45 SDE).
- Impacted Teams: team4 (Agent Aces), team5 (Comm Mandalorians).
- Reasoning: Deferral of a feature enhancement to alleviate significant overloads.
- Initiative: "Sentiment Analysis POC" (init-cc-014)
- Change: Initiative status moved to Backlog (BTL), effectively removing ATL assignments for team7 (0.9 SDE).
- Impacted Team: team7 (Data Wizards).
- Reasoning: Deferral of an innovation POC to alleviate overload.
- Initiative: "Supervisor Barge-In/Listen-In" (init-cc-015)
- Change: team5 assignment reduced from 1.35 SDE to 0.5 SDE. team4 assignment reduced from 0.45 SDE to 0 SDE and the initiative's status moved to Backlog (BTL).
- Impacted Teams: team5 (Comm Mandalorians), team4 (Agent Aces).
- Reasoning: Scope reduction for team5 and deferral for team4 as a QA feature enhancement to alleviate overloads.
- Initiative: "Agent Performance Dashboard" (init-cc-007)
- Change: team4 assignment reduced from 0.4 SDE to 0.2 SDE. team7 assignment reduced from 0.45 SDE to 0.2 SDE.
- Impacted Teams: team4 (Agent Aces), team7 (Data Wizards).
- Reasoning: Further scope reduction to allow for an MVP dashboard while clearing overloads.
- Initiative: "Skills-Based Routing Enhancements" (init-cc-008)
- Change: team6 assignment reduced from 0.45 SDE to 0.3 SDE.
- Impacted Team: team6 (Skill Masters).
- Reasoning: Scope reduction to address Skill Masters' overload.
- Initiative: "Agent Skill Self-Assessment" (init-cc-017)
- Change: Removed team4's assignment of 0.23 SDE.
- Impacted Team: team4 (Agent Aces).
- Reasoning: Deferral of this backlog item to clear the remaining minor overload on Agent Aces.
- Initiative: "Automated Case Closure Rules" (init-cc-020)
- Change: Removed team8's assignment of 0.23 SDE.
- Impacted Team: team8 (Config Ninjas).
- Reasoning: Deferral of this backlog item to clear the remaining minor overload on Config Ninjas.
- Initiative: "Bulk User Import/Update" (init-cc-021)
- Change: Initiative status moved to Backlog (BTL), effectively removing ATL assignments for team8 (0.45 SDE).
- Impacted Team: team8 (Config Ninjas).
- Reasoning: Deferral of an operational efficiency item to alleviate overload.
- Initiative: "PCI Compliance for Call Recordings" (init-cc-022)
- Change: team8 assignment reduced from 0.45 SDE to 0 SDE and reassigned to team3 (Routing Rangers) with 0.45 SDE.
- Impacted Teams: team8 (Config Ninjas), team3 (Routing Rangers).
- Reasoning: Strategic reassignment of team8's portion to team3 due to team3's architectural alignment and availability.
Conclusion:
These comprehensive adjustments ensure that all ConnectPro engineering teams are operating within their effective capacity for the 2025 planning year. While some initiatives have had their scope reduced or been deferred, this was a necessary step to maintain team health, prevent burnout, and enable realistic delivery of the most critical "Above The Line" work. Future planning cycles can revisit deferred initiatives with a clearer understanding of available capacity or potential headcount changes. We recommend continuous monitoring of these adjustments to ensure the intended benefits are realized and to promptly address any new capacity challenges.