Jan 2019:

The septic tank is now installed.

We are now able to start hosting sessions at the teaching apairy.

The plan is to have harvested rainwater into two 1000 litre storage tanks mounted on a metre high platform.  

 

Bees are now in place in both apiaries and equipment has been treated and ready for installation as soon as weather permits.

 

With this work completed, the only outstanding work will be on the power provision which is planned as an off-grid pv system.

 