Tuesday, Sept 8, 2026
Augusta
- Parkwood & Ganneston - Â TBD
- Oxford St - GAUD crews will be preparing a sewer main for the lining crew to rehabilitate.
- N. Belfast Ave & Bangor St
- Sewer manhole crew - TBD
- Gate valve box crew - TBD
- Work zones are constantly changing as crews are moving from structure to structure. Â Please be aware of these rapid changes daily.
- Armory St #22 - GAUD crews will be repairing erosion to the parking lot due to the excessive storm system flow.
- Waldo St - TBD
- Service crew - GAUD crews will be repairing defective service boxes in the following locations
- Bond Brook, Worcester St, Townsend Rd
- Insituform will be lining sanitary mains on Washington Street at the intersections of Monroe, Franklin, and Cumberland
- Lafayette Street - CCTV inspection of recently lined sanitary mains
Hallowell
Manchester
East Winthrop
Readfield