1. Define Software Engineering

The  establishment  and  use  of  sound  engineering  principles  in  order  to  obtain economically software that is reliable and works efficiently on real machines.

2. Differentiate Software engineering methods, tools and procedures. Methods : Broad array of tasks like project planning, cost estimation etc.. Tools : Automated or semi automated support for methods.

Procedures : Holds the methods and tools together. It enables the timely development of computer software.

3. Write the disadvantages of classic life cycle model.

Disadvantages of classic life cycle model :

1.  Real projects rarely follow sequential flow. Iteration always occurs and creates
        problem.

2.  Difficult for the customer to state all requirements

3.  Working version of the program is not available. So the customer must have
        patience.

4. What do you mean by task set in spiral Model?

Each of the regions in the spiral model is populated by a set of work tasks called a task set that are adopted to the characteristics of the project to be undertaken.

5. What is the main objective of Win-Win Spiral Model?

The customer and the developer enter into the process of negotiation where the customer may be asked to balance functionality ,performance and other product against cost and time to market.

1         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

6. Which of the software engineering paradigms would be most effective? Why?

Incremental / Spiral model will be most effective.

Reasons:

1.  It combines linear sequential model with iterative nature of prototyping

2.  Focuses on delivery of product at each increment

3.  Can be planned to manage technical risks.

7. Who is called as the Stakeholder?

Stakeholder is anyone in the organization who has a direct business interest in the system or product to be built.

8. Write the objective of project planning?

It is to provide a framework that enables the manager to make reasonable estimates of resources, cost and schedule.

9. What is Boot Strapping?

A sequence of instructions whose execution causes additional instructions to be loaded and executed until the complete program is in storage.

10. Write a short note on 4GT.

Fourth Generation Technique. 4GT encompasses a broad array of software tools. Each
tool enables the software developer to specify some characteristics of software at a higher
level.

2         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

11. What is FP ? How it is used for project estimation ?

Function Point. It is used as the estimation variable to size the each element of the software. It requires considerably less detailed. Estimated indirectly by estimating te number of inputs, outputs, data files, external interfaces.

12. What is LOC ? How it is used for project estimation?

LOC  : Lines of Code. It is used as estimation variable to size each element of the software. It requires considerable level of detail..

13. Write the formula to calculate the effort in persons-months used in Dynamic multi variable Model?

Software Equation :E=[LOC * B0.333/P]3 *(1/t4) Where E is effort in person-months, t is project duration, B is special skills factor, P is productivity parameter.

14. What is called object points?

It is an indirect software measure that is computed using counts of te number of screens, reports and components.

15. What are the four different Degrees of Rigor ?

Four different degrees of Rigor are

1.  Casual

2.  Structured

3.  Strict

4.  Quick reaction

16. Write about Democratic Teams in software development. (Egoless Team)

It is egoless team. All team members participate in all decisions. Group leadership rotates
        
3 LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

from member to member based on tasks to be performed.

17. What are the two project scheduling methods ?

   PERT- Program Evaluation and Review Techniques    CPM- Critical Path Method

18. What is called support risk?

The degree of uncertainty that the resultant software will be easy to correct , adapt and enhance.

19. What is RMMM?

Risk Mitigation, Monitoring and Management Plan. It is also called Risk Aversion.

20. What are four impacts of the project risk?

Catastrophic, Critical, Marginal, Negligible.

21. List the tools or methods available for rapid prototyping.

Rapid prototyping (Speed)

1.        4GT

2.  Resuable software components

3.  Formal specification and prototyping environments.

22. What is the need for modularity ?

Need for modularity: Easier to solve a complex problem. Can achieve reusability. Best effort and complexity reduces.

4         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

23. What are the five criteria that are used in modularity?

   Modular Decomposability

   Modular composability

   Modular understandability
   Modular continuity
   Modular protection

24. What is Software Architecture?

The overall structure  of  the software and the ways in which that software provides conceptual integrity for the system.

25. What are the models are used for Architectural design?

   Structural models

   Framework models
   Dynamic models
   Process models
   Functional models

26. What is cohesion?

It is a measure of the relative functional strength of a module. (Binding)

27. What is Coupling?

Measure of the relative interdependence among modules.  (Measure of interconnection among modules in a software structure.)

28. List the coupling factors.

   Interface complexity between modules

5         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

   Reference to the module

   Data pass across the interface.

29. Define Stamp coupling.

When a portion of the data structure is passed via the module interface , then it called stamp coupling.

30. Define common coupling.

When a number of modules reference a global data area, then the coupling is called common coupling.

31. Define temporal cohesion.

When a module contains tasks that are related by the fact that all must be executed with the same span of time, then it termed as temporal cohesion.

32. Write a short note on structure charts.

These are used in architectural design to document hierarchical structure, parameters and
interconnections in a system. No Decision box . The chart can be augmented with module
by module specifications of I/P and O/P parameters as well as I/P and O/P attributes.

33. What do you mean by factoring?

It is also called vertical partitioning. It follows Top-Down strategy. We can say that there are some top level modules and low level modules.

   Top level modules ---- Control functions ,actual processing work

   Low level  modules  ----Workers.  Performing  all input computation and output
        tasks.

6         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

34. What is Aesthetics?

   Aesthetics : It is a science of art and beauty. These are fundamental to software
        design, whether in art or technology.

   Simplicity, Elegance(refinement), clarity of purpose.

35. What do you mean by common coupling?

Common coupling : When a number of modules reference a global data area , then the coupling is called common coupling.

36. Write about Real Time Systems.

It provides specified amount of computation with in fixed time intervals. RTS sense and
control external devices, respond to external events and share processing time between
tasks.

37. Define Distributed system .

It consists of a collection of nearly autonomous processors that communicate to achieve a coherent computing system.

38. Compare Data Flow Oriented Design with data structure oriented design

   Data flow oriented design : Used to represent a system or software at any level of
        abstraction.

   Data Structure oriented design : It is used for representing information hierarchy
        using the three constructs for sequence, selection and repetition.

39. Define Architectural Design and Data Design.

   Architectural Design : To develop a modular program structure and represent the
        relationships between modules.

7         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

   Data Design : To select the logical representations of data objects , data storage
        and the concepts of information hiding and data abstraction.

40. What are the contents of HIPO diagrams?

Visual table of contents, set of overview diagrams, set of detail diagrams.

41. What are the aspects of software reuse.

   Software development with reuse
   Software development for reuse
   Generator based reuse

   Application system reuse

42. Define Configuration Status Reporting .

What happened? Who did it?

When it happened? What else will be affected? It is also called status accounting.

43. What is the need for baseline?

Need for Baseline :

1.  Basis for further development

2.  Uses formal change control procedure for change

3.  Helps to control change

44. Define SCM.

It is an umbrella activity that is applied throughout software process. It has a set of tracking and control activities that begin when a software engineering project begins and terminates only when the software project is taken out of operation.

8         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

45. List the SCM Activities.

   Identify a change

   Control change

   Ensure that change is being properly implemented
   Report changes to others who may have an interest

46. What is meant by software reusability?

A software component should be designed and implemented so that it can be reused in many different programs.

47. What is CASE ?

CASE : Computer Aided Software Engineering

CASE  provides  the  engineer  with  the  ability  to  automate  manual  activities  and  to improve engineering insight.

48. Write the distinction between SCM and software support.

SCM  :  It  has  a  set  of  tracking  and  control  activities  that  begin  when  a  software engineering project begins and terminates only when the software project is taken out of operation. Software support : It has a set of software engineering activities that occur after software has been delivered to the customer and put into operation.

49.  What  is  he  difference  between  basic  objects  and  aggregate  objects  used  in software configuration.

Basic Objects : It represents unit of text. E.g Section of requirement specification, Source

listing  for  a  component  Aggregate  objects:  Collection  of  basic  objects.  And  other aggregate objects. E.g Full design specification

9         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

50. Explain Linear Sequential Model and prototyping model in detail

   Linear Sequential Model :

o  Explanation, Diagram , Advantages, Disadvantages    Prototyping model:

o  Explanation, Diagram , Advantages, Disadvantages

51. Explain Spiral model and win-win spiral model in detail.

o  Spiral Model :

o  Six Task Regions : Customer Communication o  Planning

o  Risk Analysis
o  Engineering

o  Construction and Release
o  Customer Evaluation

o  Diagram , Details of four circles o  Win-Win spiral model:

o  The customer and the developer enter into the process of negotiation, where
        the

o  customer may be asked to balance functionality,performance, and other
        product against

o  cost and time to market.

o  Activities, diagram ,explanation

52. Explain the process of ‘ Risk Analysis and Management.’

Risk Identification

Risk Estimation
Risk Assessment

Risk Management and Monitoring
Risk Refinement

10         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

53. Explain the types of coupling and cohesion.

Coupling : Measure of the relative interdependence among modules.

Types: Data coupling , Stamp coupling, control coupling, External coupling, Common coupling, Content coupling

Cohesion : It is a measure of the relative functional strength of a module.

Types:  Coincidentally  cohesive,  Logically  cohesive,  Temporal  cohesion,  procedureal cohesion, communicational cohesion, High cohesion, sequential cohesion.

54. Explain Jackson system development with an example.

Steps are : Entity Action step

Entity Structure step

Initial modeling step
Function step

System Timing step
Implementation step

Example : University with two campuses.

55. Explain Data Flow Oriented design in detail.

The objective of this design is to provide a systematic approach for the derivation of program structure.

Design and information flow
Design process considerations

(Atleast one of the following with an example) Tranform flow and analysis

Transaction flow and analysis

11         LIKE our Facebook page www.facebook.com/technologytok for regular updates


For more materials of IBPS Specialist Officers Visit us at www.Newstechcafe.com

56. What is software reuse? Explain the various aspects of software reuse.

A software component should be designed and implemented so that it can be reused in many different programs.

Explanation of Aspects:

   Software development with reuse
   Software development for reuse
   Generator based reuse

   Application system reuse

We are at Facebook 

Don’t  forget  to  LIKE  us  there  for  Daily  Updates

http://www.facebook.com/Technologytok

12         LIKE our Facebook page www.facebook.com/technologytok for regular updates