Mach 30 IPT Meeting July 19, 2016
Discussion Topic: Sprint 3 Stand Up 3
Attending: J, Chris, Aaron, Ray and Jeremy (guest)
Start: 2040
End: 2140
Summary:
Great progress on developing Ground Sphere presentation and exhibit materials for #Apogee3, including the full development timeline 2013-present!
Minutes:
Link to backlog
- Did - actually wrote a chunk of the history page and took a swing at figuring out the timeline for GS history; did not work on vid, had Apogee things to do this weekend
- Will do - finish the history page (for real) and make a first draft of the video; will transfer display to Chris this week
- Blocked? - have lots of non-IPT Apogee work to do
- Did - have not done much this week other than work a little on the collage; also posted a message to local maker space about Apogee to try to drum up business
- Will do - ??
- Blocked? - not sure what needs to be done with the collage
- Posted standup summary on social media
- Investigated pricing on stickers from some other suppliers. StickerGiant has 250 4x4 stickers in color on a white background for $168.56
- Will do - Continue to post summaries on social media, and order stickers
- Blocked? -
- Did - Worked on GS flyer and market research survey
- Will do - Continue work on the GS flyer and finalize market research survey
- Blocked? - Not quite, but have a number of questions (see email)
- Did - packaged GS prototype #1 and kit #4 for shipping
- Will do - ship things to J
- Blocked? -
- Made some small edits to the mockup of the presentation.
- Also started work on writing up materials for the display.
- Will do - continue to work on the display
- Blocked? -
Post Stand Up
- J - asked Ray to make the Apogee banner
- Ray - will do
- Chris and J will sync up on requirements
- Chris and Ray will try to sync up on Thur
- Chris - so after last week J and Chris spoke about the “timeline” question from last week; J really meant the timeline for the display not the sprint timeline; the references to “posters” in the backlog == the display elements to be attached to the display board (e.g. “Why”, “How it started”, etc)
- J - will let Chris coordinate with Ray about the dimensions of elements once the display is handed over to Chris
- <Aaron, Chris, and J confirmed the timeline>
- <group answered his questions and gave him feedback on the flier for GS
- Discuss outline for the presentation
- <J presented “A Ground Station in Every School” outline>
- <all approved the outline>